latest bulk load update based on bulk load sheet provided on 11/04/08
git-svn-id: http://locode01.ad.dom/svn/WEBMIP/trunk@4778 248e525c-4dfb-0310-94bc-949c084e9493
This commit is contained in:
@@ -288,8 +288,7 @@
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
|
||||
@@ -299,9 +298,8 @@
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
|
||||
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
|
||||
@@ -311,9 +309,8 @@
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","LP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","LP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
|
||||
@@ -323,9 +320,8 @@
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","MP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
|
||||
"TERM_COND","STD EXCHANGE","ROTARY","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
|
||||
@@ -335,9 +331,8 @@
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","LP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","LP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
|
||||
@@ -347,9 +342,8 @@
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","MP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
|
||||
"TERM_COND","STD EXCHANGE","TURBINE","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
|
||||
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
|
||||
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
|
||||
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
|
||||
|
||||
|