bulk load changes from GW and Baz checked in

git-svn-id: http://locode01.ad.dom/svn/WEBMIP/trunk@4755 248e525c-4dfb-0310-94bc-949c084e9493
This commit is contained in:
PriestJ
2008-04-09 17:54:24 +00:00
parent d4ab832e08
commit 428a870c18
5 changed files with 370 additions and 270 deletions

Binary file not shown.

View File

@@ -1,22 +1,70 @@
"DOCUMENT_POSITION","JOB TYPE","METER TYPE","SERVICE PRESSURE","SORT_ORDER","TEXT"
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","ROTARY","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","ROTARY","MP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","TURBINE","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","TURBINE","MP",2,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",2,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","MP",2,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","LP",2,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","MP",2,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",2,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",2,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","TURBINE","MP",1,"excluding lifting gear changes"
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","LP",1,"Purging of downstream pipework."
@@ -32,16 +80,19 @@
"DESC_WORK","REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",2,"excluding lifting gear changes"
"DESC_WORK","REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","MP",2,"excluding lifting gear changes"
"DESC_WORK","REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","LP",2,"excluding lifting gear changes"
"DESC_WORK","REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","MP",2,"excluding lifting gear changes"
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"TERM_COND","ADDON","DIAPHRAGM","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","DIAPHRAGM","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
@@ -81,8 +132,7 @@
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -92,8 +142,8 @@
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -103,8 +153,8 @@
"TERM_COND","EXCHANGE","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","LP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -114,8 +164,8 @@
"TERM_COND","EXCHANGE","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.."
"TERM_COND","EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -125,8 +175,8 @@
"TERM_COND","EXCHANGE","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","LP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -136,8 +186,8 @@
"TERM_COND","EXCHANGE","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -156,6 +206,7 @@
"TERM_COND","INSTALL","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","DIAPHRAGM","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -165,6 +216,7 @@
"TERM_COND","INSTALL","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","ROTARY","LP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -174,6 +226,7 @@
"TERM_COND","INSTALL","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","ROTARY","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -183,6 +236,7 @@
"TERM_COND","INSTALL","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","TURBINE","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","TURBINE","LP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -192,6 +246,7 @@
"TERM_COND","INSTALL","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","TURBINE","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","TURBINE","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","OFMAT","DIAPHRAGM","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","DIAPHRAGM","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","DIAPHRAGM","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
@@ -204,22 +259,26 @@
"TERM_COND","OFMAT","TURBINE","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","TURBINE","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","ROTARY","LP",4,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","REMOVE","ROTARY","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","ROTARY","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","TURBINE","LP",4,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","TURBINE","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -242,6 +301,7 @@
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -253,6 +313,7 @@
"TERM_COND","STD EXCHANGE","ROTARY","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","ROTARY","LP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -264,6 +325,7 @@
"TERM_COND","STD EXCHANGE","ROTARY","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","ROTARY","MP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -275,6 +337,7 @@
"TERM_COND","STD EXCHANGE","TURBINE","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","TURBINE","LP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -286,6 +349,7 @@
"TERM_COND","STD EXCHANGE","TURBINE","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","TURBINE","MP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -304,6 +368,7 @@
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -313,6 +378,7 @@
"TERM_COND","STD INSTALL","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","ROTARY","LP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -322,6 +388,7 @@
"TERM_COND","STD INSTALL","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","ROTARY","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -331,6 +398,7 @@
"TERM_COND","STD INSTALL","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","TURBINE","LP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -340,6 +408,38 @@
"TERM_COND","STD INSTALL","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","TURBINE","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"CONT_SUM","STD REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"DESC_WORK","STD REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","ROTARY","LP",2,"excluding lifting gear changes"
"DESC_WORK","STD REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","ROTARY","MP",2,"excluding lifting gear changes"
"DESC_WORK","STD REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","TURBINE","LP",2,"excluding lifting gear changes"
"DESC_WORK","STD REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","TURBINE","MP",2,"excluding lifting gear changes"
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","DIAPHRAGM","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","DIAPHRAGM","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","DIAPHRAGM","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","ROTARY","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","ROTARY","LP",4,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD REMOVE","ROTARY","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","ROTARY","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","TURBINE","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","TURBINE","LP",4,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","TURBINE","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
1 DOCUMENT_POSITION JOB TYPE METER TYPE SERVICE PRESSURE SORT_ORDER TEXT
2 CONT_SUM ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
3 CONT_SUM ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
4 CONT_SUM ADVERSARIAL ROTARY DIAPHRAGM LP MP 1 2 excluding lifting gear changes
5 CONT_SUM ADVERSARIAL ROTARY LP 2 1 plus purging on time and materials basis.
6 CONT_SUM ADVERSARIAL ROTARY MP LP 1 2 excluding lifting gear changes
7 CONT_SUM ADVERSARIAL ROTARY MP 2 1 plus purging on time and materials basis.
8 CONT_SUM ADVERSARIAL TURBINE ROTARY LP MP 1 2 excluding lifting gear changes
9 CONT_SUM ADVERSARIAL TURBINE LP 2 1 plus purging on time and materials basis.
10 CONT_SUM ADVERSARIAL TURBINE MP LP 1 2 excluding lifting gear changes
11 CONT_SUM ADVERSARIAL TURBINE MP 2 1 plus purging on time and materials basis.
12 CONT_SUM STD REMOVE ADVERSARIAL DIAPHRAGM TURBINE LP MP 1 2 plus purging on time and materials basis. excluding lifting gear changes
13 CONT_SUM EXCHANGE DIAPHRAGM MP 1 excluding lifting gear changes
14 CONT_SUM EXCHANGE ROTARY LP 1 excluding lifting gear changes
15 CONT_SUM EXCHANGE ROTARY MP 1 excluding lifting gear changes
16 CONT_SUM EXCHANGE TURBINE LP 1 excluding lifting gear changes
17 CONT_SUM EXCHANGE TURBINE MP 1 excluding lifting gear changes
18 CONT_SUM INSTALL DIAPHRAGM MP 1 excluding lifting gear changes
19 CONT_SUM INSTALL ROTARY LP 1 excluding lifting gear changes
20 CONT_SUM INSTALL ROTARY MP 1 excluding lifting gear changes
21 CONT_SUM INSTALL TURBINE LP 1 excluding lifting gear changes
22 CONT_SUM INSTALL TURBINE MP 1 excluding lifting gear changes
23 CONT_SUM REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
24 CONT_SUM REMOVE DIAPHRAGM MP 2 excluding lifting gear changes
25 CONT_SUM STD EXCHANGE DIAPHRAGM MP 1 excluding lifting gear changes
26 CONT_SUM STD EXCHANGE ROTARY LP 1 excluding lifting gear changes
27 CONT_SUM STD EXCHANGE ROTARY MP 1 excluding lifting gear changes
28 CONT_SUM STD EXCHANGE TURBINE LP 1 excluding lifting gear changes
29 CONT_SUM STD EXCHANGE TURBINE MP 1 excluding lifting gear changes
30 CONT_SUM STD INSTALL DIAPHRAGM MP 1 excluding lifting gear changes
31 CONT_SUM STD INSTALL ROTARY LP 1 excluding lifting gear changes
32 CONT_SUM STD INSTALL ROTARY MP 1 excluding lifting gear changes
33 CONT_SUM STD INSTALL TURBINE LP 1 excluding lifting gear changes
34 CONT_SUM STD INSTALL TURBINE MP 1 excluding lifting gear changes
35 CONT_SUM_QA ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
36 CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
37 CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 2 excluding lifting gear changes
38 CONT_SUM_QA ADVERSARIAL ROTARY LP 1 plus purging on time and materials basis.
39 CONT_SUM_QA ADVERSARIAL ROTARY LP 2 excluding lifting gear changes
40 CONT_SUM_QA ADVERSARIAL ROTARY MP 1 plus purging on time and materials basis.
41 CONT_SUM_QA ADVERSARIAL ROTARY MP 2 excluding lifting gear changes
42 CONT_SUM_QA ADVERSARIAL TURBINE LP 1 plus purging on time and materials basis.
43 CONT_SUM_QA ADVERSARIAL TURBINE LP 2 excluding lifting gear changes
44 CONT_SUM_QA ADVERSARIAL TURBINE MP 1 plus purging on time and materials basis.
45 CONT_SUM_QA STD REMOVE ADVERSARIAL DIAPHRAGM TURBINE LP MP 1 2 plus purging on time and materials basis. excluding lifting gear changes
46 CONT_SUM_QA EXCHANGE DIAPHRAGM MP 1 excluding lifting gear changes
47 CONT_SUM_QA EXCHANGE ROTARY LP 1 excluding lifting gear changes
48 CONT_SUM_QA EXCHANGE ROTARY MP 1 excluding lifting gear changes
49 CONT_SUM_QA EXCHANGE TURBINE LP 1 excluding lifting gear changes
50 CONT_SUM_QA EXCHANGE TURBINE MP 1 excluding lifting gear changes
51 CONT_SUM_QA INSTALL DIAPHRAGM MP 1 excluding lifting gear changes
52 CONT_SUM_QA INSTALL ROTARY LP 1 excluding lifting gear changes
53 CONT_SUM_QA INSTALL ROTARY MP 1 excluding lifting gear changes
54 CONT_SUM_QA INSTALL TURBINE LP 1 excluding lifting gear changes
55 CONT_SUM_QA INSTALL TURBINE MP 1 excluding lifting gear changes
56 CONT_SUM_QA REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
57 CONT_SUM_QA REMOVE DIAPHRAGM MP 2 excluding lifting gear changes
58 CONT_SUM_QA STD EXCHANGE DIAPHRAGM MP 1 excluding lifting gear changes
59 CONT_SUM_QA STD EXCHANGE ROTARY LP 1 excluding lifting gear changes
60 CONT_SUM_QA STD EXCHANGE ROTARY MP 1 excluding lifting gear changes
61 CONT_SUM_QA STD EXCHANGE TURBINE LP 1 excluding lifting gear changes
62 CONT_SUM_QA STD EXCHANGE TURBINE MP 1 excluding lifting gear changes
63 CONT_SUM_QA STD INSTALL DIAPHRAGM MP 1 excluding lifting gear changes
64 CONT_SUM_QA STD INSTALL ROTARY LP 1 excluding lifting gear changes
65 CONT_SUM_QA STD INSTALL ROTARY MP 1 excluding lifting gear changes
66 CONT_SUM_QA STD INSTALL TURBINE LP 1 excluding lifting gear changes
67 CONT_SUM_QA STD INSTALL TURBINE MP 1 excluding lifting gear changes
68 DESC_WORK ADVERSARIAL DIAPHRAGM LP 1 Purging of downstream pipework.
69 DESC_WORK ADVERSARIAL DIAPHRAGM MP 1 Purging of downstream pipework.
70 DESC_WORK ADVERSARIAL ROTARY LP 1 Purging of downstream pipework.
80 DESC_WORK REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
81 DESC_WORK REMOVE DIAPHRAGM MP 1 Purging of downstream pipework.
82 DESC_WORK REMOVE ROTARY LP 1 Purging of downstream pipework.
83 DESC_WORK REMOVE ROTARY LP 2 excluding lifting gear changes
84 DESC_WORK REMOVE ROTARY MP 1 Purging of downstream pipework.
85 DESC_WORK REMOVE ROTARY MP 2 excluding lifting gear changes
86 DESC_WORK REMOVE TURBINE LP 1 Purging of downstream pipework.
87 DESC_WORK REMOVE TURBINE LP 2 excluding lifting gear changes
88 DESC_WORK REMOVE TURBINE MP 1 Purging of downstream pipework.
89 DESC_WORK REMOVE TURBINE MP 2 excluding lifting gear changes
90 DESC_WORK STD EXCHANGE DIAPHRAGM LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
91 DESC_WORK STD EXCHANGE DIAPHRAGM MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
92 DESC_WORK STD EXCHANGE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
93 DESC_WORK STD EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
94 DESC_WORK STD EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
95 DESC_WORK STD EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
96 TERM_COND ADDON DIAPHRAGM LP 1 This quotation is based on there being a working LF connection on the existing meter.
97 TERM_COND ADDON DIAPHRAGM LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
98 TERM_COND ADDON DIAPHRAGM LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
132 TERM_COND EXCHANGE DIAPHRAGM LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
133 TERM_COND EXCHANGE DIAPHRAGM LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
134 TERM_COND EXCHANGE DIAPHRAGM LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
135 TERM_COND EXCHANGE DIAPHRAGM LP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND EXCHANGE DIAPHRAGM LP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
136 TERM_COND EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
137 TERM_COND EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
138 TERM_COND EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
142 TERM_COND EXCHANGE DIAPHRAGM MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
143 TERM_COND EXCHANGE DIAPHRAGM MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
144 TERM_COND EXCHANGE DIAPHRAGM MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
145 TERM_COND EXCHANGE DIAPHRAGM MP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
146 TERM_COND EXCHANGE DIAPHRAGM MP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Lifting gear if required will be charged at a rate of 400 per day.
147 TERM_COND EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
148 TERM_COND EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
149 TERM_COND EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
153 TERM_COND EXCHANGE ROTARY LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
154 TERM_COND EXCHANGE ROTARY LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
155 TERM_COND EXCHANGE ROTARY LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
156 TERM_COND EXCHANGE ROTARY LP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
157 TERM_COND EXCHANGE ROTARY LP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Lifting gear if required will be charged at a rate of 400 per day.
158 TERM_COND EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
159 TERM_COND EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
160 TERM_COND EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
164 TERM_COND EXCHANGE ROTARY MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
165 TERM_COND EXCHANGE ROTARY MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
166 TERM_COND EXCHANGE ROTARY MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
167 TERM_COND EXCHANGE ROTARY MP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
168 TERM_COND EXCHANGE ROTARY MP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Lifting gear if required will be charged at a rate of 400 per day.
169 TERM_COND EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
170 TERM_COND EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
171 TERM_COND EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
175 TERM_COND EXCHANGE TURBINE LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
176 TERM_COND EXCHANGE TURBINE LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
177 TERM_COND EXCHANGE TURBINE LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
178 TERM_COND EXCHANGE TURBINE LP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
179 TERM_COND EXCHANGE TURBINE LP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Lifting gear if required will be charged at a rate of 400 per day.
180 TERM_COND EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
181 TERM_COND EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
182 TERM_COND EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
186 TERM_COND EXCHANGE TURBINE MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
187 TERM_COND EXCHANGE TURBINE MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
188 TERM_COND EXCHANGE TURBINE MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
189 TERM_COND EXCHANGE TURBINE MP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
190 TERM_COND EXCHANGE TURBINE MP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Lifting gear if required will be charged at a rate of 400 per day.
191 TERM_COND INSTALL DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
192 TERM_COND INSTALL DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
193 TERM_COND INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
206 TERM_COND INSTALL DIAPHRAGM MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
207 TERM_COND INSTALL DIAPHRAGM MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
208 TERM_COND INSTALL DIAPHRAGM MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
209 TERM_COND INSTALL DIAPHRAGM MP 10 Lifting gear if required will be charged at a rate of 400 per day.
210 TERM_COND INSTALL ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
211 TERM_COND INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
212 TERM_COND INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
216 TERM_COND INSTALL ROTARY LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
217 TERM_COND INSTALL ROTARY LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
218 TERM_COND INSTALL ROTARY LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
219 TERM_COND INSTALL ROTARY LP 10 Lifting gear if required will be charged at a rate of 400 per day.
220 TERM_COND INSTALL ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
221 TERM_COND INSTALL ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
222 TERM_COND INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
226 TERM_COND INSTALL ROTARY MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
227 TERM_COND INSTALL ROTARY MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
228 TERM_COND INSTALL ROTARY MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
229 TERM_COND INSTALL ROTARY MP 10 Lifting gear if required will be charged at a rate of 400 per day.
230 TERM_COND INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
231 TERM_COND INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
232 TERM_COND INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
236 TERM_COND INSTALL TURBINE LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
237 TERM_COND INSTALL TURBINE LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
238 TERM_COND INSTALL TURBINE LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
239 TERM_COND INSTALL TURBINE LP 10 Lifting gear if required will be charged at a rate of 400 per day.
240 TERM_COND INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
241 TERM_COND INSTALL TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
242 TERM_COND INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
246 TERM_COND INSTALL TURBINE MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
247 TERM_COND INSTALL TURBINE MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
248 TERM_COND INSTALL TURBINE MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
249 TERM_COND INSTALL TURBINE MP 10 Lifting gear if required will be charged at a rate of 400 per day.
250 TERM_COND OFMAT DIAPHRAGM LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
251 TERM_COND OFMAT DIAPHRAGM LP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
252 TERM_COND OFMAT DIAPHRAGM MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
259 TERM_COND OFMAT TURBINE LP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
260 TERM_COND OFMAT TURBINE MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
261 TERM_COND OFMAT TURBINE MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
262 TERM_COND REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
263 TERM_COND REMOVE DIAPHRAGM LP 3 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
264 TERM_COND REMOVE DIAPHRAGM MP LP 1 3 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
265 TERM_COND REMOVE DIAPHRAGM MP 2 1 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
266 TERM_COND REMOVE ROTARY DIAPHRAGM LP MP 1 2 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
267 TERM_COND REMOVE DIAPHRAGM MP 3 Lifting gear if required will be charged at a rate of 400 per day.
268 TERM_COND REMOVE ROTARY LP 2 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
269 TERM_COND REMOVE ROTARY LP 3 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
270 TERM_COND REMOVE ROTARY MP LP 1 3 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
271 TERM_COND REMOVE ROTARY LP 4 Lifting gear if required will be charged at a rate of 400 per day.
272 TERM_COND REMOVE ROTARY MP 2 1 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
273 TERM_COND REMOVE TURBINE ROTARY LP MP 1 2 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
274 TERM_COND REMOVE ROTARY MP 3 Lifting gear if required will be charged at a rate of 400 per day.
275 TERM_COND REMOVE TURBINE LP 2 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
276 TERM_COND REMOVE TURBINE LP 3 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
277 TERM_COND REMOVE TURBINE MP LP 1 3 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
278 TERM_COND REMOVE TURBINE LP 4 Lifting gear if required will be charged at a rate of 400 per day.
279 TERM_COND REMOVE TURBINE MP 2 1 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
280 TERM_COND STD EXCHANGE REMOVE DIAPHRAGM TURBINE LP MP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
281 TERM_COND REMOVE TURBINE MP 3 Lifting gear if required will be charged at a rate of 400 per day.
282 TERM_COND STD EXCHANGE DIAPHRAGM LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
283 TERM_COND STD EXCHANGE DIAPHRAGM LP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
284 TERM_COND STD EXCHANGE DIAPHRAGM LP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
301 TERM_COND STD EXCHANGE DIAPHRAGM MP 10 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
302 TERM_COND STD EXCHANGE DIAPHRAGM MP 11 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
303 TERM_COND STD EXCHANGE ROTARY DIAPHRAGM LP MP 1 11 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
304 TERM_COND STD EXCHANGE DIAPHRAGM MP 12 Lifting gear if required will be charged at a rate of 400 per day.
305 TERM_COND STD EXCHANGE ROTARY LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
306 TERM_COND STD EXCHANGE ROTARY LP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
307 TERM_COND STD EXCHANGE ROTARY LP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
313 TERM_COND STD EXCHANGE ROTARY LP 10 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
314 TERM_COND STD EXCHANGE ROTARY LP 11 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
315 TERM_COND STD EXCHANGE ROTARY MP LP 1 11 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
316 TERM_COND STD EXCHANGE ROTARY LP 12 Lifting gear if required will be charged at a rate of 400 per day.
317 TERM_COND STD EXCHANGE ROTARY MP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
318 TERM_COND STD EXCHANGE ROTARY MP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
319 TERM_COND STD EXCHANGE ROTARY MP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
325 TERM_COND STD EXCHANGE ROTARY MP 10 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
326 TERM_COND STD EXCHANGE ROTARY MP 11 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
327 TERM_COND STD EXCHANGE TURBINE ROTARY LP MP 1 11 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
328 TERM_COND STD EXCHANGE ROTARY MP 12 Lifting gear if required will be charged at a rate of 400 per day.
329 TERM_COND STD EXCHANGE TURBINE LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
330 TERM_COND STD EXCHANGE TURBINE LP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
331 TERM_COND STD EXCHANGE TURBINE LP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
337 TERM_COND STD EXCHANGE TURBINE LP 10 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
338 TERM_COND STD EXCHANGE TURBINE LP 11 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
339 TERM_COND STD EXCHANGE TURBINE MP LP 1 11 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
340 TERM_COND STD EXCHANGE TURBINE LP 12 Lifting gear if required will be charged at a rate of 400 per day.
341 TERM_COND STD EXCHANGE TURBINE MP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
342 TERM_COND STD EXCHANGE TURBINE MP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
343 TERM_COND STD EXCHANGE TURBINE MP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
349 TERM_COND STD EXCHANGE TURBINE MP 10 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
350 TERM_COND STD EXCHANGE TURBINE MP 11 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
351 TERM_COND STD INSTALL STD EXCHANGE DIAPHRAGM TURBINE LP MP 1 11 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
352 TERM_COND STD EXCHANGE TURBINE MP 12 Lifting gear if required will be charged at a rate of 400 per day.
353 TERM_COND STD INSTALL DIAPHRAGM LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
354 TERM_COND STD INSTALL DIAPHRAGM LP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
355 TERM_COND STD INSTALL DIAPHRAGM LP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
368 TERM_COND STD INSTALL DIAPHRAGM MP 8 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
369 TERM_COND STD INSTALL DIAPHRAGM MP 9 8 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
370 TERM_COND STD INSTALL ROTARY DIAPHRAGM LP MP 1 9 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
371 TERM_COND STD INSTALL DIAPHRAGM MP 10 Lifting gear if required will be charged at a rate of 400 per day.
372 TERM_COND STD INSTALL ROTARY LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
373 TERM_COND STD INSTALL ROTARY LP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
374 TERM_COND STD INSTALL ROTARY LP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
378 TERM_COND STD INSTALL ROTARY LP 8 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
379 TERM_COND STD INSTALL ROTARY LP 9 8 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
380 TERM_COND STD INSTALL ROTARY MP LP 1 9 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
381 TERM_COND STD INSTALL ROTARY LP 10 Lifting gear if required will be charged at a rate of 400 per day.
382 TERM_COND STD INSTALL ROTARY MP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
383 TERM_COND STD INSTALL ROTARY MP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
384 TERM_COND STD INSTALL ROTARY MP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
388 TERM_COND STD INSTALL ROTARY MP 8 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
389 TERM_COND STD INSTALL ROTARY MP 9 8 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
390 TERM_COND STD INSTALL TURBINE ROTARY LP MP 1 9 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
391 TERM_COND STD INSTALL ROTARY MP 10 Lifting gear if required will be charged at a rate of 400 per day.
392 TERM_COND STD INSTALL TURBINE LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
393 TERM_COND STD INSTALL TURBINE LP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
394 TERM_COND STD INSTALL TURBINE LP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
398 TERM_COND STD INSTALL TURBINE LP 8 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
399 TERM_COND STD INSTALL TURBINE LP 9 8 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
400 TERM_COND STD INSTALL TURBINE MP LP 1 9 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
401 TERM_COND STD INSTALL TURBINE LP 10 Lifting gear if required will be charged at a rate of 400 per day.
402 TERM_COND STD INSTALL TURBINE MP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
403 TERM_COND STD INSTALL TURBINE MP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
404 TERM_COND STD INSTALL TURBINE MP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
408 TERM_COND STD INSTALL TURBINE MP 8 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
409 TERM_COND STD INSTALL TURBINE MP 9 8 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
410 TERM_COND STD REMOVE STD INSTALL DIAPHRAGM TURBINE LP MP 1 9 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
411 TERM_COND STD INSTALL TURBINE MP 10 Lifting gear if required will be charged at a rate of 400 per day.
412 CONT_SUM STD REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
413 CONT_SUM STD REMOVE DIAPHRAGM MP 2 excluding lifting gear changes
414 CONT_SUM_QA STD REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
415 CONT_SUM_QA STD REMOVE DIAPHRAGM MP 2 excluding lifting gear changes
416 DESC_WORK STD REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
417 DESC_WORK STD REMOVE DIAPHRAGM MP 1 Purging of downstream pipework.
418 DESC_WORK STD REMOVE ROTARY LP 1 Purging of downstream pipework.
419 DESC_WORK STD REMOVE ROTARY LP 2 excluding lifting gear changes
420 DESC_WORK STD REMOVE ROTARY MP 1 Purging of downstream pipework.
421 DESC_WORK STD REMOVE ROTARY MP 2 excluding lifting gear changes
422 DESC_WORK STD REMOVE TURBINE LP 1 Purging of downstream pipework.
423 DESC_WORK STD REMOVE TURBINE LP 2 excluding lifting gear changes
424 DESC_WORK STD REMOVE TURBINE MP 1 Purging of downstream pipework.
425 DESC_WORK STD REMOVE TURBINE MP 2 excluding lifting gear changes
426 TERM_COND STD REMOVE DIAPHRAGM LP 2 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
427 TERM_COND STD REMOVE DIAPHRAGM LP 3 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
428 TERM_COND STD REMOVE DIAPHRAGM LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
429 TERM_COND STD REMOVE DIAPHRAGM MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
430 TERM_COND STD REMOVE DIAPHRAGM MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
431 TERM_COND STD REMOVE DIAPHRAGM MP 3 Lifting gear if required will be charged at a rate of 400 per day.
432 TERM_COND STD REMOVE ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
433 TERM_COND STD REMOVE ROTARY LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
434 TERM_COND STD REMOVE ROTARY LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
435 TERM_COND STD REMOVE ROTARY LP 4 Lifting gear if required will be charged at a rate of 400 per day.
436 TERM_COND STD REMOVE ROTARY MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
437 TERM_COND STD REMOVE ROTARY MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
438 TERM_COND STD REMOVE ROTARY MP 3 Lifting gear if required will be charged at a rate of 400 per day.
439 TERM_COND STD REMOVE TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
440 TERM_COND STD REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
441 TERM_COND STD REMOVE TURBINE LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
442 TERM_COND STD REMOVE TURBINE LP 4 Lifting gear if required will be charged at a rate of 400 per day.
443 TERM_COND STD REMOVE TURBINE MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
444 TERM_COND STD REMOVE TURBINE MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
445 TERM_COND STD REMOVE TURBINE MP 3 Lifting gear if required will be charged at a rate of 400 per day.

View File

@@ -1,156 +1,158 @@
,,,,,,,,,
"SELLING_PRICE","COST_PRICE","DELIVERY_COST","VALID_FROM","VALID_TO","COST_TYPE","MODU_CODE","HOU_CODE","BAS_CODE","ADIT_CODE"
56.39,,0.00,,,"MOCO","AD016S",,,
56.39,,0.00,,,"MOCO","AD016SW",,,
88.59,,0.00,,,"MOCO","AD025S",,,
88.59,,0.00,,,"MOCO","AD025SW",,,
115.54,,0.00,,,"MOCO","AD040S",,,
432.77,,0.00,,,"MOCO","AD065S",,,
580.76,,0.00,,,"MOCO","AD100S",,,
719.36,,0.00,,,"MOCO","AD160S",,,
228.73,,27.50,,,"MOCO","ARCMVV0025A",,,
228.73,,27.50,,,"MOCO","ARCMVV0025AW",,,
302.97,,27.50,,,"MOCO","ARCMVV0040AW",,,
302.97,,27.50,,,"MOCO","ARCMVV0040A",,,
692.89,,60.50,,,"MOCO","ARCMHH0065A",,,
692.89,,60.50,,,"MOCO","ARCMVV0065A",,,
692.89,,60.50,,,"MOCO","ARCMVH0065A",,,
692.89,,60.50,,,"MOCO","ARCMHV0065A",,,
692.89,,60.50,,,"MOCO","ARCMHH0100A",,,
692.89,,60.50,,,"MOCO","ARCMVV0100A",,,
692.89,,60.50,,,"MOCO","ARCMVH0100A",,,
692.89,,60.50,,,"MOCO","ARCMHV0100A",,,
955.61,,60.50,,,"MOCO","ARCMVV0160A",,,
955.61,,60.50,,,"MOCO","ARCMHH0160A",,,
955.61,,60.50,,,"MOCO","ARCMVH0160A",,,
955.61,,60.50,,,"MOCO","ARCMHV0160A",,,
955.61,,60.50,,,"MOCO","ARCMVV0200A",,,
955.61,,60.50,,,"MOCO","ARCMHH0200A",,,
955.61,,60.50,,,"MOCO","ARCMVH0200A",,,
955.61,,60.50,,,"MOCO","ARCMHV0200A",,,
955.61,,60.50,,,"MOCO","ARCMVV0250A",,,
955.61,,60.50,,,"MOCO","ARCMHH0250A",,,
955.61,,60.50,,,"MOCO","ARCMVH0250A",,,
955.61,,60.50,,,"MOCO","ARCMHV0250A",,,
1878.27,,60.50,,,"MOCO","ARVV0250AP",,,
1878.27,,60.50,,,"MOCO","ARHH0250AP",,,
1878.27,,60.50,,,"MOCO","ARVH0250AP",,,
1878.27,,60.50,,,"MOCO","ARHV0250AP",,,
1232.87,,60.50,,,"MOCO","ARVV0300A",,,
1232.87,,60.50,,,"MOCO","ARHH0300A",,,
1232.87,,60.50,,,"MOCO","ARVH0300A",,,
1232.87,,60.50,,,"MOCO","ARHV0300A",,,
2848.37,,99.00,,,"MOCO","ARVV0300AP",,,
2848.37,,99.00,,,"MOCO","ARHH0300AP",,,
2848.37,,99.00,,,"MOCO","ARVH0300AP",,,
2848.37,,99.00,,,"MOCO","ARHV0300AP",,,
1663.49,,60.50,,,"MOCO","ARVV0400A",,,
1663.49,,60.50,,,"MOCO","ARHH0400A",,,
1663.49,,60.50,,,"MOCO","ARVH0400A",,,
1663.49,,60.50,,,"MOCO","ARHV0400A",,,
1911.86,,99.00,,,"MOCO","ARVV0650A",,,
1911.86,,99.00,,,"MOCO","ARHH0650A",,,
1911.86,,99.00,,,"MOCO","ARVH0650A",,,
1911.86,,99.00,,,"MOCO","ARHV0650A",,,
4233.68,,550.00,,,"MOCO","ARVV0650AP",,,
4233.68,,550.00,,,"MOCO","ARHH0650AP",,,
4233.68,,550.00,,,"MOCO","ARVH0650AP",,,
4233.68,,550.00,,,"MOCO","ARHV0650AP",,,
1935.88,,99.00,,,"MOCO","ARVV1000A",,,
1935.88,,99.00,,,"MOCO","ARHH1000A",,,
1935.88,,99.00,,,"MOCO","ARVH1000A",,,
1935.88,,99.00,,,"MOCO","ARHV1000A",,,
4793.35,,550.00,,,"MOCO","ARVV1000AP",,,
4793.35,,550.00,,,"MOCO","ARHH1000AP",,,
4793.35,,550.00,,,"MOCO","ARVH1000AP",,,
4793.35,,550.00,,,"MOCO","ARHV1000AP",,,
402.75,,92.40,,,"MOCO","ASD016A",,,
461.60,,92.40,,,"MOCO","ASD025A",,,
632.08,,92.40,,,"MOCO","ASD040A",,,
1157.21,,92.40,,,"MOCO","ASD065A",,,
1628.98,,92.40,,,"MOCO","ASD100A",,,
1652.92,,92.40,,,"MOCO","ASD160A",,,
606.38,,92.40,,,"MOCO","ASR0025A",,,
618.38,,92.40,,,"MOCO","ASR0040A",,,
1648.77,,92.40,,,"MOCO","ASR0100A",,,
1842.23,,92.40,,,"MOCO","ASR0160A",,,
2107.45,,92.40,,,"MOCO","ASR0200A",,,
3041.90,,92.40,,,"MOCO","ASR0250A",,,
3302.16,,92.40,,,"MOCO","ASR0300A",,,
3667.75,,92.40,,,"MOCO","ASR0400A",,,
3902.51,,550.00,,,"MOCO","ASR0650A",,,
4569.86,,550.00,,,"MOCO","ASR1000A",,,
1079.62,,77.00,,,"MOCO","ASR0025D",,,
1079.62,,77.00,,,"MOCO","ASR0040D",,,
1079.62,,77.00,,,"MOCO","ASR0065D",,,
2669.59,,77.00,,,"MOCO","ASR0100D",,,
2795.54,,77.00,,,"MOCO","ASR0160D",,,
3127.30,,99.00,,,"MOCO","ASR0250D",,,
3291.97,,99.00,,,"MOCO","ASR0310D",,,
3535.18,,165.00,,,"MOCO","ASR0450D",,,
3535.18,,165.00,,,"MOCO","ASR0450DP",,,
5276.37,,209.00,,,"MOCO","ASR0650D",,,
6937.59,,209.00,,,"MOCO","ASR1075D",,,
8257.59,,275.00,,,"MOCO","ASR1600D",,,
12642.74,,495.00,,,"MOCO","ASR2885D",,,
401.65,,92.40,,,"MOCO","ASD016AW",,,
31.63,,,,,"AICO",,,,"EMS"
,,,,,"AICO",,,,"LIFTING GEAR"
56.386,,0,,,"MOCO","AD016S",,,
56.386,,0,,,"MOCO","AD016SW",,,
88.59,,0,,,"MOCO","AD025S",,,
88.59,,0,,,"MOCO","AD025SW",,,
115.54,,0,,,"MOCO","AD040S",,,
432.773,,0,,,"MOCO","AD065S",,,
580.756,,0,,,"MOCO","AD100S",,,
719.36,,0,,,"MOCO","AD160S",,,
228.734,,27.5,,,"MOCO","ARCMVV0025A",,,
228.734,,27.5,,,"MOCO","ARCMVV0025AW",,,
302.973,,27.5,,,"MOCO","ARCMVV0040AW",,,
302.973,,27.5,,,"MOCO","ARCMVV0040A",,,
692.89,,60.5,,,"MOCO","ARCMHH0065A",,,
692.89,,60.5,,,"MOCO","ARCMVV0065A",,,
692.89,,60.5,,,"MOCO","ARCMVH0065A",,,
692.89,,60.5,,,"MOCO","ARCMHV0065A",,,
692.89,,60.5,,,"MOCO","ARCMHH0100A",,,
692.89,,60.5,,,"MOCO","ARCMVV0100A",,,
692.89,,60.5,,,"MOCO","ARCMVH0100A",,,
692.89,,60.5,,,"MOCO","ARCMHV0100A",,,
955.614,,60.5,,,"MOCO","ARCMVV0160A",,,
955.614,,60.5,,,"MOCO","ARCMHH0160A",,,
955.614,,60.5,,,"MOCO","ARCMVH0160A",,,
955.614,,60.5,,,"MOCO","ARCMHV0160A",,,
955.614,,60.5,,,"MOCO","ARCMVV0200A",,,
955.614,,60.5,,,"MOCO","ARCMHH0200A",,,
955.614,,60.5,,,"MOCO","ARCMVH0200A",,,
955.614,,60.5,,,"MOCO","ARCMHV0200A",,,
955.614,,60.5,,,"MOCO","ARCMVV0250A",,,
955.614,,60.5,,,"MOCO","ARCMHH0250A",,,
955.614,,60.5,,,"MOCO","ARCMVH0250A",,,
955.614,,60.5,,,"MOCO","ARCMHV0250A",,,
1878.272,,60.5,,,"MOCO","ARVV0250AP",,,
1878.272,,60.5,,,"MOCO","ARHH0250AP",,,
1878.272,,60.5,,,"MOCO","ARVH0250AP",,,
1878.272,,60.5,,,"MOCO","ARHV0250AP",,,
1232.869,,60.5,,,"MOCO","ARVV0300A",,,
1232.869,,60.5,,,"MOCO","ARHH0300A",,,
1232.869,,60.5,,,"MOCO","ARVH0300A",,,
1232.869,,60.5,,,"MOCO","ARHV0300A",,,
2848.373,,99,,,"MOCO","ARVV0300AP",,,
2848.373,,99,,,"MOCO","ARHH0300AP",,,
2848.373,,99,,,"MOCO","ARVH0300AP",,,
2848.373,,99,,,"MOCO","ARHV0300AP",,,
1663.486,,60.5,,,"MOCO","ARVV0400A",,,
1663.486,,60.5,,,"MOCO","ARHH0400A",,,
1663.486,,60.5,,,"MOCO","ARVH0400A",,,
1663.486,,60.5,,,"MOCO","ARHV0400A",,,
1911.855,,99,,,"MOCO","ARVV0650A",,,
1911.855,,99,,,"MOCO","ARHH0650A",,,
1911.855,,99,,,"MOCO","ARVH0650A",,,
1911.855,,99,,,"MOCO","ARHV0650A",,,
4233.68,,550,,,"MOCO","ARVV0650AP",,,
4233.68,,550,,,"MOCO","ARHH0650AP",,,
4233.68,,550,,,"MOCO","ARVH0650AP",,,
4233.68,,550,,,"MOCO","ARHV0650AP",,,
1935.879,,99,,,"MOCO","ARVV1000A",,,
1935.879,,99,,,"MOCO","ARHH1000A",,,
1935.879,,99,,,"MOCO","ARVH1000A",,,
1935.879,,99,,,"MOCO","ARHV1000A",,,
4793.349,,550,,,"MOCO","ARVV1000AP",,,
4793.349,,550,,,"MOCO","ARHH1000AP",,,
4793.349,,550,,,"MOCO","ARVH1000AP",,,
4793.349,,550,,,"MOCO","ARHV1000AP",,,
402.754,,92.4,,,"MOCO","ASD016A",,,
401.654,,92.4,,,"MOCO","ASD016AW",,,
461.604,,92.4,,,"MOCO","ASD025A",,,
632.082,,92.4,,,"MOCO","ASD040A",,,
1157.211,,92.4,,,"MOCO","ASD065A",,,
1628.979,,92.4,,,"MOCO","ASD100A",,,
1652.915,,92.4,,,"MOCO","ASD160A",,,
606.375,,92.4,,,"MOCO","ASR0025A",,,
618.376,,92.4,,,"MOCO","ASR0040A",,,
1648.768,,92.4,,,"MOCO","ASR0100A",,,
1842.225,,92.4,,,"MOCO","ASR0160A",,,
2107.446,,92.4,,,"MOCO","ASR0200A",,,
3041.896,,92.4,,,"MOCO","ASR0250A",,,
3302.156,,92.4,,,"MOCO","ASR0300A",,,
3667.752,,92.4,,,"MOCO","ASR0400A",,,
3902.514,,550,,,"MOCO","ASR0650A",,,
4569.862,,550,,,"MOCO","ASR1000A",,,
1079.617,,77,,,"MOCO","ASR0025D",,,
1079.617,,77,,,"MOCO","ASR0040D",,,
1079.617,,77,,,"MOCO","ASR0065D",,,
2669.59,,77,,,"MOCO","ASR0100D",,,
2795.54,,77,,,"MOCO","ASR0160D",,,
3127.3,,99,,,"MOCO","ASR0250D",,,
3291.97,,99,,,"MOCO","ASR0310D",,,
3535.18,,165,,,"MOCO","ASR0450D",,,
3535.18,,165,,,"MOCO","ASR0450DP",,,
5276.37,,209,,,"MOCO","ASR0650D",,,
6937.59,,209,,,"MOCO","ASR1075D",,,
8257.59,,275,,,"MOCO","ASR1600D",,,
12642.74,,495,,,"MOCO","ASR2885D",,,
429.5,,,,,"AICO",,,,"EMS"
400,,,,,"AICO",,,,"LIFTING GEAR"
,,,,,"AICO",,,,"PURGING"
,,,,,"AICO",,,,"AMR"
687.50,,,,,"BACO",,,"RA0025LPB",
687.50,,,,,"BACO",,,"RA0025MPB",
687.50,,,,,"BACO",,,"RA0040LPB",
687.50,,,,,"BACO",,,"RA0040MPB",
1127.50,,,,,"BACO",,,"RA0065LPB",
1127.50,,,,,"BACO",,,"RA0100LPB",
687.50,,,,,"BACO",,,"RA0100MPB",
1127.50,,,,,"BACO",,,"RA0160LPB",
687.50,,,,,"BACO",,,"RA0160MPB",
1127.50,,,,,"BACO",,,"RA0200LPB",
687.50,,,,,"BACO",,,"RA0200MPB",
1127.50,,,,,"BACO",,,"RA0250+LPB",
1127.50,,,,,"BACO",,,"RA0250LPB",
1127.50,,,,,"BACO",,,"RA0250MPB",
1402.50,,,,,"BACO",,,"RA0300+LPB",
1127.50,,,,,"BACO",,,"RA0300LPB",
1127.50,,,,,"BACO",,,"RA0300MPB",
1402.50,,,,,"BACO",,,"RA0400LPB",
1127.50,,,,,"BACO",,,"RA0400MPB",
1567.50,,,,,"BACO",,,"RA0650+LPB",
1402.50,,,,,"BACO",,,"RA0650LPB",
1402.50,,,,,"BACO",,,"RA0650MPB",
1567.50,,,,,"BACO",,,"RA1000+LPB",
1402.50,,,,,"BACO",,,"RA1000LPB",
1402.50,,,,,"BACO",,,"RA1000MPB",
687.50,,,,,"BACO",,,"RD0025MPB",
687.50,,,,,"BACO",,,"RD0040MPB",
687.50,,,,,"BACO",,,"RD0065MPB",
687.50,,,,,"BACO",,,"RD0100MPB",
1127.50,,,,,"BACO",,,"RD0160MPB",
1127.50,,,,,"BACO",,,"RD0250MPB",
1127.50,,,,,"BACO",,,"RD0310MPB",
1127.50,,,,,"BACO",,,"RD0450+MPB",
1127.50,,,,,"BACO",,,"RD0450MPB",
1402.50,,,,,"BACO",,,"RD0650MPB",
1402.50,,,,,"BACO",,,"RD1075MPB",
1402.50,,,,,"BACO",,,"RD1600MPB",
1842.50,,,,,"BACO",,,"RD2885MPB",
687.50,,,,,"BACO",,,"U016LPB",
687.50,,,,,"BACO",,,"U016MPB",
687.50,,,,,"BACO",,,"U025LPB",
687.50,,,,,"BACO",,,"U025MPB",
687.50,,,,,"BACO",,,"U040LPB",
687.50,,,,,"BACO",,,"U040MPB",
687.50,,,,,"BACO",,,"U065LPB",
1127.50,,,,,"BACO",,,"U065MPB",
1127.50,,,,,"BACO",,,"U100LPB",
1127.50,,,,,"BACO",,,"U100MPB",
1127.50,,,,,"BACO",,,"U160LPB",
1127.50,,,,,"BACO",,,"U160MPB",
305.45,,,,,"AICO",,,,"CONVERTER INSTALL"
305.6,,,,,"AICO",,,,"CONVERTER REMOVE"
687.5,,,,,"BACO",,,"RA0025LPB",
687.5,,,,,"BACO",,,"RA0025MPB",
687.5,,,,,"BACO",,,"RA0040LPB",
687.5,,,,,"BACO",,,"RA0040MPB",
1127.5,,,,,"BACO",,,"RA0065LPB",
1127.5,,,,,"BACO",,,"RA0100LPB",
687.5,,,,,"BACO",,,"RA0100MPB",
1127.5,,,,,"BACO",,,"RA0160LPB",
687.5,,,,,"BACO",,,"RA0160MPB",
1127.5,,,,,"BACO",,,"RA0200LPB",
687.5,,,,,"BACO",,,"RA0200MPB",
1127.5,,,,,"BACO",,,"RA0250+LPB",
1127.5,,,,,"BACO",,,"RA0250LPB",
1127.5,,,,,"BACO",,,"RA0250MPB",
1402.5,,,,,"BACO",,,"RA0300+LPB",
1127.5,,,,,"BACO",,,"RA0300LPB",
1127.5,,,,,"BACO",,,"RA0300MPB",
1402.5,,,,,"BACO",,,"RA0400LPB",
1127.5,,,,,"BACO",,,"RA0400MPB",
1567.5,,,,,"BACO",,,"RA0650+LPB",
1402.5,,,,,"BACO",,,"RA0650LPB",
1402.5,,,,,"BACO",,,"RA0650MPB",
1567.5,,,,,"BACO",,,"RA1000+LPB",
1402.5,,,,,"BACO",,,"RA1000LPB",
1402.5,,,,,"BACO",,,"RA1000MPB",
687.5,,,,,"BACO",,,"RD0025MPB",
687.5,,,,,"BACO",,,"RD0040MPB",
687.5,,,,,"BACO",,,"RD0065MPB",
687.5,,,,,"BACO",,,"RD0100MPB",
1127.5,,,,,"BACO",,,"RD0160MPB",
1127.5,,,,,"BACO",,,"RD0250MPB",
1127.5,,,,,"BACO",,,"RD0310MPB",
1127.5,,,,,"BACO",,,"RD0450+MPB",
1127.5,,,,,"BACO",,,"RD0450MPB",
1402.5,,,,,"BACO",,,"RD0650MPB",
1402.5,,,,,"BACO",,,"RD1075MPB",
1402.5,,,,,"BACO",,,"RD1600MPB",
1842.5,,,,,"BACO",,,"RD2885MPB",
687.5,,,,,"BACO",,,"U016LPB",
687.5,,,,,"BACO",,,"U016MPB",
687.5,,,,,"BACO",,,"U025LPB",
687.5,,,,,"BACO",,,"U025MPB",
687.5,,,,,"BACO",,,"U040LPB",
687.5,,,,,"BACO",,,"U040MPB",
687.5,,,,,"BACO",,,"U065LPB",
1127.5,,,,,"BACO",,,"U065MPB",
1127.5,,,,,"BACO",,,"U100LPB",
1127.5,,,,,"BACO",,,"U100MPB",
1127.5,,,,,"BACO",,,"U160LPB",
1127.5,,,,,"BACO",,,"U160MPB",
248.04,,,,,"HOCO",,"GC2",,
303.99,,,,,"HOCO",,"GC2FS",,
313.00,,,,,"HOCO",,"GC2MP",,
313,,,,,"HOCO",,"GC2MP",,
374.68,,,,,"HOCO",,"GC3",,
393.51,,,,,"HOCO",,"GC4",,
661.44,,,,,"HOCO",,"GC4+",,
@@ -163,8 +165,8 @@
393.51,,,,,"HOCO",,"Gas Cab No 4",,
887.05,,,,,"HOCO",,"Gas Cab No 6",,
3431.53,,,,,"HOCO",,"Custom1",,
3818.20,,,,,"HOCO",,"Custom2",,
3967.40,,,,,"HOCO",,"Custom3",,
3818.2,,,,,"HOCO",,"Custom2",,
3967.4,,,,,"HOCO",,"Custom3",,
3678.95,,,,,"HOCO",,"Custom4",,
4063.13,,,,,"HOCO",,"Custom5",,
4786.74,,,,,"HOCO",,"Custom6",,
@@ -173,18 +175,18 @@
3579.48,,,,,"HOCO",,"KP3",,
4247.14,,,,,"HOCO",,"KP4",,
4355.31,,,,,"HOCO",,"KP5",,
295.66,,,,,"HOCO",,"Gas Cab No 2BB",,
295.658,,,,,"HOCO",,"Gas Cab No 2BB",,
394.73,,,,,"HOCO",,"Gas Cab No 4BB25",,
437.10,,,,,"HOCO",,"Gas Cab No 4BB40",,
437.1,,,,,"HOCO",,"Gas Cab No 4BB40",,
956.39,,,,,"HOCO",,"Gas Cab No 6BB100",,
1170.88,,,,,"HOCO",,"Gas Cab No 6BB160",,
295.66,,,,,"HOCO",,"GC2FSBB",,
394.74,,,,,"HOCO",,"GC3BB",,
295.658,,,,,"HOCO",,"GC2FSBB",,
394.735,,,,,"HOCO",,"GC3BB",,
394.74,,,,,"HOCO",,"GC4BB25",,
437.10,,,,,"HOCO",,"GC4BB40",,
822.39,,,,,"HOCO",,"GC5BB",,
437.096,,,,,"HOCO",,"GC4BB40",,
822.393,,,,,"HOCO",,"GC5BB",,
956.39,,,,,"HOCO",,"GC6BB100",,
1170.88,,,,,"HOCO",,"GC6BB160",,
228.58,,,,,"HOCO",,"GC2BB",,
313.00,,,,,"HOCO",,"Gas Cab No 2MP",,
228.5811,,,,,"HOCO",,"GC2BB",,
313,,,,,"HOCO",,"Gas Cab No 2MP",,
5349.95,,,,,"HOCO",,"Custom7",,
1
2 SELLING_PRICE COST_PRICE DELIVERY_COST VALID_FROM VALID_TO COST_TYPE MODU_CODE HOU_CODE BAS_CODE ADIT_CODE
3 56.39 56.386 0.00 0 MOCO AD016S
4 56.39 56.386 0.00 0 MOCO AD016SW
5 88.59 0.00 0 MOCO AD025S
6 88.59 0.00 0 MOCO AD025SW
7 115.54 0.00 0 MOCO AD040S
8 432.77 432.773 0.00 0 MOCO AD065S
9 580.76 580.756 0.00 0 MOCO AD100S
10 719.36 0.00 0 MOCO AD160S
11 228.73 228.734 27.50 27.5 MOCO ARCMVV0025A
12 228.73 228.734 27.50 27.5 MOCO ARCMVV0025AW
13 302.97 302.973 27.50 27.5 MOCO ARCMVV0040AW
14 302.97 302.973 27.50 27.5 MOCO ARCMVV0040A
15 692.89 60.50 60.5 MOCO ARCMHH0065A
16 692.89 60.50 60.5 MOCO ARCMVV0065A
17 692.89 60.50 60.5 MOCO ARCMVH0065A
18 692.89 60.50 60.5 MOCO ARCMHV0065A
19 692.89 60.50 60.5 MOCO ARCMHH0100A
20 692.89 60.50 60.5 MOCO ARCMVV0100A
21 692.89 60.50 60.5 MOCO ARCMVH0100A
22 692.89 60.50 60.5 MOCO ARCMHV0100A
23 955.61 955.614 60.50 60.5 MOCO ARCMVV0160A
24 955.61 955.614 60.50 60.5 MOCO ARCMHH0160A
25 955.61 955.614 60.50 60.5 MOCO ARCMVH0160A
26 955.61 955.614 60.50 60.5 MOCO ARCMHV0160A
27 955.61 955.614 60.50 60.5 MOCO ARCMVV0200A
28 955.61 955.614 60.50 60.5 MOCO ARCMHH0200A
29 955.61 955.614 60.50 60.5 MOCO ARCMVH0200A
30 955.61 955.614 60.50 60.5 MOCO ARCMHV0200A
31 955.61 955.614 60.50 60.5 MOCO ARCMVV0250A
32 955.61 955.614 60.50 60.5 MOCO ARCMHH0250A
33 955.61 955.614 60.50 60.5 MOCO ARCMVH0250A
34 955.61 955.614 60.50 60.5 MOCO ARCMHV0250A
35 1878.27 1878.272 60.50 60.5 MOCO ARVV0250AP
36 1878.27 1878.272 60.50 60.5 MOCO ARHH0250AP
37 1878.27 1878.272 60.50 60.5 MOCO ARVH0250AP
38 1878.27 1878.272 60.50 60.5 MOCO ARHV0250AP
39 1232.87 1232.869 60.50 60.5 MOCO ARVV0300A
40 1232.87 1232.869 60.50 60.5 MOCO ARHH0300A
41 1232.87 1232.869 60.50 60.5 MOCO ARVH0300A
42 1232.87 1232.869 60.50 60.5 MOCO ARHV0300A
43 2848.37 2848.373 99.00 99 MOCO ARVV0300AP
44 2848.37 2848.373 99.00 99 MOCO ARHH0300AP
45 2848.37 2848.373 99.00 99 MOCO ARVH0300AP
46 2848.37 2848.373 99.00 99 MOCO ARHV0300AP
47 1663.49 1663.486 60.50 60.5 MOCO ARVV0400A
48 1663.49 1663.486 60.50 60.5 MOCO ARHH0400A
49 1663.49 1663.486 60.50 60.5 MOCO ARVH0400A
50 1663.49 1663.486 60.50 60.5 MOCO ARHV0400A
51 1911.86 1911.855 99.00 99 MOCO ARVV0650A
52 1911.86 1911.855 99.00 99 MOCO ARHH0650A
53 1911.86 1911.855 99.00 99 MOCO ARVH0650A
54 1911.86 1911.855 99.00 99 MOCO ARHV0650A
55 4233.68 550.00 550 MOCO ARVV0650AP
56 4233.68 550.00 550 MOCO ARHH0650AP
57 4233.68 550.00 550 MOCO ARVH0650AP
58 4233.68 550.00 550 MOCO ARHV0650AP
59 1935.88 1935.879 99.00 99 MOCO ARVV1000A
60 1935.88 1935.879 99.00 99 MOCO ARHH1000A
61 1935.88 1935.879 99.00 99 MOCO ARVH1000A
62 1935.88 1935.879 99.00 99 MOCO ARHV1000A
63 4793.35 4793.349 550.00 550 MOCO ARVV1000AP
64 4793.35 4793.349 550.00 550 MOCO ARHH1000AP
65 4793.35 4793.349 550.00 550 MOCO ARVH1000AP
66 4793.35 4793.349 550.00 550 MOCO ARHV1000AP
67 402.75 402.754 92.40 92.4 MOCO ASD016A
68 461.60 401.654 92.40 92.4 MOCO ASD025A ASD016AW
69 632.08 461.604 92.40 92.4 MOCO ASD040A ASD025A
70 1157.21 632.082 92.40 92.4 MOCO ASD065A ASD040A
71 1628.98 1157.211 92.40 92.4 MOCO ASD100A ASD065A
72 1652.92 1628.979 92.40 92.4 MOCO ASD160A ASD100A
73 606.38 1652.915 92.40 92.4 MOCO ASR0025A ASD160A
74 618.38 606.375 92.40 92.4 MOCO ASR0040A ASR0025A
75 1648.77 618.376 92.40 92.4 MOCO ASR0100A ASR0040A
76 1842.23 1648.768 92.40 92.4 MOCO ASR0160A ASR0100A
77 2107.45 1842.225 92.40 92.4 MOCO ASR0200A ASR0160A
78 3041.90 2107.446 92.40 92.4 MOCO ASR0250A ASR0200A
79 3302.16 3041.896 92.40 92.4 MOCO ASR0300A ASR0250A
80 3667.75 3302.156 92.40 92.4 MOCO ASR0400A ASR0300A
81 3902.51 3667.752 550.00 92.4 MOCO ASR0650A ASR0400A
82 4569.86 3902.514 550.00 550 MOCO ASR1000A ASR0650A
83 1079.62 4569.862 77.00 550 MOCO ASR0025D ASR1000A
84 1079.62 1079.617 77.00 77 MOCO ASR0040D ASR0025D
85 1079.62 1079.617 77.00 77 MOCO ASR0065D ASR0040D
86 2669.59 1079.617 77.00 77 MOCO ASR0100D ASR0065D
87 2795.54 2669.59 77.00 77 MOCO ASR0160D ASR0100D
88 3127.30 2795.54 99.00 77 MOCO ASR0250D ASR0160D
89 3291.97 3127.3 99.00 99 MOCO ASR0310D ASR0250D
90 3535.18 3291.97 165.00 99 MOCO ASR0450D ASR0310D
91 3535.18 165.00 165 MOCO ASR0450DP ASR0450D
92 5276.37 3535.18 209.00 165 MOCO ASR0650D ASR0450DP
93 6937.59 5276.37 209.00 209 MOCO ASR1075D ASR0650D
94 8257.59 6937.59 275.00 209 MOCO ASR1600D ASR1075D
95 12642.74 8257.59 495.00 275 MOCO ASR2885D ASR1600D
96 401.65 12642.74 92.40 495 MOCO ASD016AW ASR2885D
97 31.63 429.5 AICO EMS
98 400 AICO LIFTING GEAR
99 AICO PURGING
100 AICO AMR
101 687.50 305.45 BACO AICO RA0025LPB CONVERTER INSTALL
102 687.50 305.6 BACO AICO RA0025MPB CONVERTER REMOVE
103 687.50 687.5 BACO RA0040LPB RA0025LPB
104 687.50 687.5 BACO RA0040MPB RA0025MPB
105 1127.50 687.5 BACO RA0065LPB RA0040LPB
106 1127.50 687.5 BACO RA0100LPB RA0040MPB
107 687.50 1127.5 BACO RA0100MPB RA0065LPB
108 1127.50 1127.5 BACO RA0160LPB RA0100LPB
109 687.50 687.5 BACO RA0160MPB RA0100MPB
110 1127.50 1127.5 BACO RA0200LPB RA0160LPB
111 687.50 687.5 BACO RA0200MPB RA0160MPB
112 1127.50 1127.5 BACO RA0250+LPB RA0200LPB
113 1127.50 687.5 BACO RA0250LPB RA0200MPB
114 1127.50 1127.5 BACO RA0250MPB RA0250+LPB
115 1402.50 1127.5 BACO RA0300+LPB RA0250LPB
116 1127.50 1127.5 BACO RA0300LPB RA0250MPB
117 1127.50 1402.5 BACO RA0300MPB RA0300+LPB
118 1402.50 1127.5 BACO RA0400LPB RA0300LPB
119 1127.50 1127.5 BACO RA0400MPB RA0300MPB
120 1567.50 1402.5 BACO RA0650+LPB RA0400LPB
121 1402.50 1127.5 BACO RA0650LPB RA0400MPB
122 1402.50 1567.5 BACO RA0650MPB RA0650+LPB
123 1567.50 1402.5 BACO RA1000+LPB RA0650LPB
124 1402.50 1402.5 BACO RA1000LPB RA0650MPB
125 1402.50 1567.5 BACO RA1000MPB RA1000+LPB
126 687.50 1402.5 BACO RD0025MPB RA1000LPB
127 687.50 1402.5 BACO RD0040MPB RA1000MPB
128 687.50 687.5 BACO RD0065MPB RD0025MPB
129 687.50 687.5 BACO RD0100MPB RD0040MPB
130 1127.50 687.5 BACO RD0160MPB RD0065MPB
131 1127.50 687.5 BACO RD0250MPB RD0100MPB
132 1127.50 1127.5 BACO RD0310MPB RD0160MPB
133 1127.50 1127.5 BACO RD0450+MPB RD0250MPB
134 1127.50 1127.5 BACO RD0450MPB RD0310MPB
135 1402.50 1127.5 BACO RD0650MPB RD0450+MPB
136 1402.50 1127.5 BACO RD1075MPB RD0450MPB
137 1402.50 1402.5 BACO RD1600MPB RD0650MPB
138 1842.50 1402.5 BACO RD2885MPB RD1075MPB
139 687.50 1402.5 BACO U016LPB RD1600MPB
140 687.50 1842.5 BACO U016MPB RD2885MPB
141 687.50 687.5 BACO U025LPB U016LPB
142 687.50 687.5 BACO U025MPB U016MPB
143 687.50 687.5 BACO U040LPB U025LPB
144 687.50 687.5 BACO U040MPB U025MPB
145 687.50 687.5 BACO U065LPB U040LPB
146 1127.50 687.5 BACO U065MPB U040MPB
147 1127.50 687.5 BACO U100LPB U065LPB
148 1127.50 1127.5 BACO U100MPB U065MPB
149 1127.50 1127.5 BACO U160LPB U100LPB
150 1127.50 1127.5 BACO U160MPB U100MPB
151 1127.5 BACO U160LPB
152 1127.5 BACO U160MPB
153 248.04 HOCO GC2
154 303.99 HOCO GC2FS
155 313.00 313 HOCO GC2MP
156 374.68 HOCO GC3
157 393.51 HOCO GC4
158 661.44 HOCO GC4+
165 393.51 HOCO Gas Cab No 4
166 887.05 HOCO Gas Cab No 6
167 3431.53 HOCO Custom1
168 3818.20 3818.2 HOCO Custom2
169 3967.40 3967.4 HOCO Custom3
170 3678.95 HOCO Custom4
171 4063.13 HOCO Custom5
172 4786.74 HOCO Custom6
175 3579.48 HOCO KP3
176 4247.14 HOCO KP4
177 4355.31 HOCO KP5
178 295.66 295.658 HOCO Gas Cab No 2BB
179 394.73 HOCO Gas Cab No 4BB25
180 437.10 437.1 HOCO Gas Cab No 4BB40
181 956.39 HOCO Gas Cab No 6BB100
182 1170.88 HOCO Gas Cab No 6BB160
183 295.66 295.658 HOCO GC2FSBB
184 394.74 394.735 HOCO GC3BB
185 394.74 HOCO GC4BB25
186 437.10 437.096 HOCO GC4BB40
187 822.39 822.393 HOCO GC5BB
188 956.39 HOCO GC6BB100
189 1170.88 HOCO GC6BB160
190 228.58 228.5811 HOCO GC2BB
191 313.00 313 HOCO Gas Cab No 2MP
192 5349.95 HOCO Custom7

View File

@@ -87,11 +87,9 @@ G40,,ROTARY,Dresser,,,,,,,,,,,40mm
MRD0085A1B,,ROTARY,Dresser,,,,,,,,,,,50mm
MRD0085A1P,,ROTARY,Dresser,,,,,,,,,,,50mm
MRD0141A1C,,ROTARY,Dresser,,,,,,,,,,,80mm
MRD0160B4C,,ROTARY,Dresser,,,,,,,,,,,80mm
MRD0200A1C,,ROTARY,Dresser,,,,,,,,,,,80mm
MRD0250B4C,,ROTARY,Dresser,,,,,,,,,,,80mm
MRD0310A1D,,ROTARY,Dresser,,,,,,,,,,,100mm
MRD0310B4D,,ROTARY,Dresser,,,,,,,,,,,100mm
MRD0450A1D,,ROTARY,Dresser,,,,,,,,,,,100mm
MRD0650A1E,,ROTARY,Dresser,,,,,,,,,,,150mm
MRD0650B4D,,ROTARY,Dresser,,,,,,,,,,,100mm
@@ -124,10 +122,10 @@ MTD04000VG,,TURBINE,Dresser,,,,,,,,,,,250mm
2M,,ROTARY,IGA,,,,,,,,,,,50mm
3.5M,,ROTARY,IGA,,,,,,,,,,,50mm
5.3M,,ROTARY,IGA,,,,,,,,,,,80mm
11M,,ROTARY,IGA,,,,,,,,,,,80mm
16M,,ROTARY,IGA,,,,,,,,,,,80mm
11M IGA,,ROTARY,IGA,,,,,,,,,,,80mm
16M IGA,,ROTARY,IGA,,,,,,,,,,,80mm
25M,,ROTARY,IGA,,,,,,,,,,,100mm
38M,,ROTARY,IGA,,,,,,,,,,,150mm
38M IGA,,ROTARY,IGA,,,,,,,,,,,150mm
G250DN100,,TURBINE,IGA,,,,,,,,,,,100mm
MRI0025,,ROTARY,IGA,,,,,,,,,,,50mm
MRI0040,,ROTARY,IGA,,,,,,,,,,,50mm
@@ -214,18 +212,18 @@ MTN02500SF,,TURBINE,Instromet,,,,,,,,,,,200mm
MTN02500SG,,TURBINE,Instromet,,,,,,,,,,,250mm
MTN04000QG,,TURBINE,Instromet,,,,,,,,,,,250mm
MTN04000SG,,TURBINE,Instromet,,,,,,,,,,,250mm
G160,,TURBINE,Jeavons,,,,,,,,,,,80mm
G160 JEV,,TURBINE,Jeavons,,,,,,,,,,,80mm
100/50,,ROTARY,PCCompteur,,,,,,,,,,,50mm
D3.5,,ROTARY,PCCompteur,,,,,,,,,,,50mm
G65,,ROTARY,PCCompteur,,,,,,,,,,,50mm
G65 PCC,,ROTARY,PCCompteur,,,,,,,,,,,50mm
D5.6,,ROTARY,PCCompteur,,,,,,,,,,,80mm
200/80,,ROTARY,PCCompteur,,,,,,,,,,,80mm
D8.8,,ROTARY,PCCompteur,,,,,,,,,,,80mm
G160,,ROTARY,PCCompteur,,,,,,,,,,,80mm
G160 PCC,,ROTARY,PCCompteur,,,,,,,,,,,80mm
350/100,,ROTARY,PCCompteur,,,,,,,,,,,100mm
400/100,,ROTARY,PCCompteur,,,,,,,,,,,100mm
D14,,ROTARY,PCCompteur,,,,,,,,,,,100mm
G250,,ROTARY,PCCompteur,,,,,,,,,,,100mm
G250 PCC,,ROTARY,PCCompteur,,,,,,,,,,,100mm
550/150,,ROTARY,PCCompteur,,,,,,,,,,,150mm
G400,,ROTARY,PCCompteur,,,,,,,,,,,150mm
800/150,,ROTARY,PCCompteur,,,,,,,,,,,150mm
@@ -237,13 +235,13 @@ G1000,,ROTARY,PCCompteur,,,,,,,,,,,200mm
2500/250,,ROTARY,PCCompteur,,,,,,,,,,,250mm
D88,,ROTARY,PCCompteur,,,,,,,,,,,250mm
200/100,,TURBINE,PCCompteur,,,,,,,,,,,100mm
200/80,,TURBINE,PCCompteur,,,,,,,,,,,80mm
400/100,,TURBINE,PCCompteur,,,,,,,,,,,100mm
200/80 PCC,,TURBINE,PCCompteur,,,,,,,,,,,80mm
400/100 PCC,,TURBINE,PCCompteur,,,,,,,,,,,100mm
400/150,,TURBINE,PCCompteur,,,,,,,,,,,150mm
800/150,,TURBINE,PCCompteur,,,,,,,,,,,150mm
800/150 PCC,,TURBINE,PCCompteur,,,,,,,,,,,150mm
800/200,,TURBINE,PCCompteur,,,,,,,,,,,200mm
1600/200,,TURBINE,PCCompteur,,,,,,,,,,,200mm
2500/250,,TURBINE,PCCompteur,,,,,,,,,,,250mm
1600/200 PCC,,TURBINE,PCCompteur,,,,,,,,,,,200mm
2500/250 PCC,,TURBINE,PCCompteur,,,,,,,,,,,250mm
T18,,TURBINE,RCK,,,,,,,,,,,100mm
MTP00065,,TURBINE,RMG,,,,,,,,,,,50mm
MTP00100,,TURBINE,RMG,,,,,,,,,,,50mm
@@ -321,57 +319,57 @@ D9,,ROTARY,Schlumbuger,,,,,,,,,,,80mm
D11,,ROTARY,Schlumbuger,,,,,,,,,,,100mm
D16,,ROTARY,Schlumbuger,,,,,,,,,,,100mm
D23,,ROTARY,Schlumbuger,,,,,,,,,,,150mm
D56,,ROTARY,Schlumbuger,,,,,,,,,,,200mm
D88,,ROTARY,Schlumbuger,,,,,,,,,,,250mm
D56 SCH,,ROTARY,Schlumbuger,,,,,,,,,,,200mm
D88 SCH,,ROTARY,Schlumbuger,,,,,,,,,,,250mm
F8.8,,TURBINE,Schlumbuger,,,,,,,,,,,80mm
F14,,TURBINE,Schlumbuger,,,,,,,,,,,100mm
F23,,TURBINE,Schlumbuger,,,,,,,,,,,150mm
F35,,TURBINE,Schlumbuger,,,,,,,,,,,150mm
F56,,TURBINE,Schlumbuger,,,,,,,,,,,200mm
F88,,TURBINE,Schlumbuger,,,,,,,,,,,250mm
MRA25A,,ROTARY,Schlumbuger,,,,,,,,,,,40mm
MRA40A,,ROTARY,Schlumbuger,,,,,,,,,,,40mm
MRA65B,,ROTARY,Schlumbuger,,,,,,,,,,,50mm
G65,,ROTARY,Schlumbuger,,,,,,,,,,,50mm
MRA100B,,ROTARY,Schlumbuger,,,,,,,,,,,50mm
MRA25A SCH,,ROTARY,Schlumbuger,,,,,,,,,,,40mm
MRA40A SCH,,ROTARY,Schlumbuger,,,,,,,,,,,40mm
MRA65B SCH,,ROTARY,Schlumbuger,,,,,,,,,,,50mm
G65 SCH,,ROTARY,Schlumbuger,,,,,,,,,,,50mm
MRA100B SCH,,ROTARY,Schlumbuger,,,,,,,,,,,50mm
MRA100PB,,ROTARY,Schlumbuger,,,,,,,,,,,50mm
MRA160C,,ROTARY,Schlumbuger,,,,,,,,,,,80mm
MRA160C SCH,,ROTARY,Schlumbuger,,,,,,,,,,,80mm
MRA160PC,,ROTARY,Schlumbuger,,,,,,,,,,,80mm
MRA200C,,ROTARY,Schlumbuger,,,,,,,,,,,80mm
MRA250C,,ROTARY,Schlumbuger,,,,,,,,,,,80mm
MRA300D,,ROTARY,Schlumbuger,,,,,,,,,,,100mm
MRA400D,,ROTARY,Schlumbuger,,,,,,,,,,,100mm
MRA200C SCH,,ROTARY,Schlumbuger,,,,,,,,,,,80mm
MRA250C SCH,,ROTARY,Schlumbuger,,,,,,,,,,,80mm
MRA300D SCH,,ROTARY,Schlumbuger,,,,,,,,,,,100mm
MRA400D SCH,,ROTARY,Schlumbuger,,,,,,,,,,,100mm
MRA400PD,,ROTARY,Schlumbuger,,,,,,,,,,,100mm
MRA650E,,ROTARY,Schlumbuger,,,,,,,,,,,150mm
MRA1000E,,ROTARY,Schlumbuger,,,,,,,,,,,150mm
MRA1600PF,,ROTARY,Schlumbuger,,,,,,,,,,,200mm
MRA2500PG,,ROTARY,Schlumbuger,,,,,,,,,,,250mm
MTA160C,,TURBINE,Schlumbuger,,,,,,,,,,,80mm
MTA250C,,TURBINE,Schlumbuger,,,,,,,,,,,80mm
MTA250D,,TURBINE,Schlumbuger,,,,,,,,,,,100mm
MTA250FC,,TURBINE,Schlumbuger,,,,,,,,,,,80mm
MTA400C,,TURBINE,Schlumbuger,,,,,,,,,,,80mm
MTA400D,,TURBINE,Schlumbuger,,,,,,,,,,,100mm
MTA400FD,,TURBINE,Schlumbuger,,,,,,,,,,,100mm
MTA650D,,TURBINE,Schlumbuger,,,,,,,,,,,100mm
MTA650E,,TURBINE,Schlumbuger,,,,,,,,,,,150mm
MTA650FE,,TURBINE,Schlumbuger,,,,,,,,,,,150mm
MTA1000E,,TURBINE,Schlumbuger,,,,,,,,,,,150mm
MTA1000F,,TURBINE,Schlumbuger,,,,,,,,,,,200mm
MTA1000FE,,TURBINE,Schlumbuger,,,,,,,,,,,150mm
MTA1600E,,TURBINE,Schlumbuger,,,,,,,,,,,150mm
MTA1600F,,TURBINE,Schlumbuger,,,,,,,,,,,200mm
MTA250C SCH,,TURBINE,Schlumbuger,,,,,,,,,,,80mm
MTA250D SCH,,TURBINE,Schlumbuger,,,,,,,,,,,100mm
MTA250FC SCH,,TURBINE,Schlumbuger,,,,,,,,,,,80mm
MTA400C SCH,,TURBINE,Schlumbuger,,,,,,,,,,,80mm
MTA400D SCH,,TURBINE,Schlumbuger,,,,,,,,,,,100mm
MTA400FD SCH,,TURBINE,Schlumbuger,,,,,,,,,,,100mm
MTA650D SCH,,TURBINE,Schlumbuger,,,,,,,,,,,100mm
MTA650E SCH,,TURBINE,Schlumbuger,,,,,,,,,,,150mm
MTA650FE SCH,,TURBINE,Schlumbuger,,,,,,,,,,,150mm
MTA1000E SCH,,TURBINE,Schlumbuger,,,,,,,,,,,150mm
MTA1000FSCH,,TURBINE,Schlumbuger,,,,,,,,,,,200mm
MTA1000FE SCH,,TURBINE,Schlumbuger,,,,,,,,,,,150mm
MTA1600E SCH,,TURBINE,Schlumbuger,,,,,,,,,,,150mm
MTA1600F SCH,,TURBINE,Schlumbuger,,,,,,,,,,,200mm
MTA1600FF,,TURBINE,Schlumbuger,,,,,,,,,,,200mm
MTA1600G,,TURBINE,Schlumbuger,,,,,,,,,,,250mm
MTA1600G SCH,,TURBINE,Schlumbuger,,,,,,,,,,,250mm
MTA2500F,,TURBINE,Schlumbuger,,,,,,,,,,,200mm
MTA2500FG,,TURBINE,Schlumbuger,,,,,,,,,,,250mm
MTA2500G,,TURBINE,Schlumbuger,,,,,,,,,,,250mm
MTA4000FG,,TURBINE,Schlumbuger,,,,,,,,,,,250mm
MTA4000G,,TURBINE,Schlumbuger,,,,,,,,,,,250mm
RG65,,ROTARY,UGI,,,,,,,,,,,50mm
RG65 UGI,,ROTARY,UGI,,,,,,,,,,,50mm
RG100,,ROTARY,UGI,,,,,,,,,,,80mm
RG160,,ROTARY,UGI,,,,,,,,,,,80mm
RG160 UGI,,ROTARY,UGI,,,,,,,,,,,80mm
RG250,,ROTARY,UGI,,,,,,,,,,,100mm
RG400,,ROTARY,UGI,,,,,,,,,,,150mm
RG650,,ROTARY,UGI,,,,,,,,,,,150mm
RG1000,,ROTARY,UGI,,,,,,,,,,,200mm
RG1000 UGI,,ROTARY,UGI,,,,,,,,,,,200mm
1 CODE DRWG_CODE METY_CODE MANU_REF DIM_A DIM_B CENTRES DIM_C WEIGHT QMAX VALID_FROM VALID_TO QNOM QMIN Flange Size
87 MRD0085A1B ROTARY Dresser 50mm
88 MRD0085A1P ROTARY Dresser 50mm
89 MRD0141A1C ROTARY Dresser 80mm
MRD0160B4C ROTARY Dresser 80mm
90 MRD0200A1C ROTARY Dresser 80mm
91 MRD0250B4C ROTARY Dresser 80mm
92 MRD0310A1D ROTARY Dresser 100mm
MRD0310B4D ROTARY Dresser 100mm
93 MRD0450A1D ROTARY Dresser 100mm
94 MRD0650A1E ROTARY Dresser 150mm
95 MRD0650B4D ROTARY Dresser 100mm
122 2M ROTARY IGA 50mm
123 3.5M ROTARY IGA 50mm
124 5.3M ROTARY IGA 80mm
125 11M 11M IGA ROTARY IGA 80mm
126 16M 16M IGA ROTARY IGA 80mm
127 25M ROTARY IGA 100mm
128 38M 38M IGA ROTARY IGA 150mm
129 G250DN100 TURBINE IGA 100mm
130 MRI0025 ROTARY IGA 50mm
131 MRI0040 ROTARY IGA 50mm
212 MTN02500SG TURBINE Instromet 250mm
213 MTN04000QG TURBINE Instromet 250mm
214 MTN04000SG TURBINE Instromet 250mm
215 G160 G160 JEV TURBINE Jeavons 80mm
216 100/50 ROTARY PCCompteur 50mm
217 D3.5 ROTARY PCCompteur 50mm
218 G65 G65 PCC ROTARY PCCompteur 50mm
219 D5.6 ROTARY PCCompteur 80mm
220 200/80 ROTARY PCCompteur 80mm
221 D8.8 ROTARY PCCompteur 80mm
222 G160 G160 PCC ROTARY PCCompteur 80mm
223 350/100 ROTARY PCCompteur 100mm
224 400/100 ROTARY PCCompteur 100mm
225 D14 ROTARY PCCompteur 100mm
226 G250 G250 PCC ROTARY PCCompteur 100mm
227 550/150 ROTARY PCCompteur 150mm
228 G400 ROTARY PCCompteur 150mm
229 800/150 ROTARY PCCompteur 150mm
235 2500/250 ROTARY PCCompteur 250mm
236 D88 ROTARY PCCompteur 250mm
237 200/100 TURBINE PCCompteur 100mm
238 200/80 200/80 PCC TURBINE PCCompteur 80mm
239 400/100 400/100 PCC TURBINE PCCompteur 100mm
240 400/150 TURBINE PCCompteur 150mm
241 800/150 800/150 PCC TURBINE PCCompteur 150mm
242 800/200 TURBINE PCCompteur 200mm
243 1600/200 1600/200 PCC TURBINE PCCompteur 200mm
244 2500/250 2500/250 PCC TURBINE PCCompteur 250mm
245 T18 TURBINE RCK 100mm
246 MTP00065 TURBINE RMG 50mm
247 MTP00100 TURBINE RMG 50mm
319 D11 ROTARY Schlumbuger 100mm
320 D16 ROTARY Schlumbuger 100mm
321 D23 ROTARY Schlumbuger 150mm
322 D56 D56 SCH ROTARY Schlumbuger 200mm
323 D88 D88 SCH ROTARY Schlumbuger 250mm
324 F8.8 TURBINE Schlumbuger 80mm
325 F14 TURBINE Schlumbuger 100mm
326 F23 TURBINE Schlumbuger 150mm
327 F35 TURBINE Schlumbuger 150mm
328 F56 TURBINE Schlumbuger 200mm
329 F88 TURBINE Schlumbuger 250mm
330 MRA25A MRA25A SCH ROTARY Schlumbuger 40mm
331 MRA40A MRA40A SCH ROTARY Schlumbuger 40mm
332 MRA65B MRA65B SCH ROTARY Schlumbuger 50mm
333 G65 G65 SCH ROTARY Schlumbuger 50mm
334 MRA100B MRA100B SCH ROTARY Schlumbuger 50mm
335 MRA100PB ROTARY Schlumbuger 50mm
336 MRA160C MRA160C SCH ROTARY Schlumbuger 80mm
337 MRA160PC ROTARY Schlumbuger 80mm
338 MRA200C MRA200C SCH ROTARY Schlumbuger 80mm
339 MRA250C MRA250C SCH ROTARY Schlumbuger 80mm
340 MRA300D MRA300D SCH ROTARY Schlumbuger 100mm
341 MRA400D MRA400D SCH ROTARY Schlumbuger 100mm
342 MRA400PD ROTARY Schlumbuger 100mm
343 MRA650E ROTARY Schlumbuger 150mm
344 MRA1000E ROTARY Schlumbuger 150mm
345 MRA1600PF ROTARY Schlumbuger 200mm
346 MRA2500PG ROTARY Schlumbuger 250mm
347 MTA160C TURBINE Schlumbuger 80mm
348 MTA250C MTA250C SCH TURBINE Schlumbuger 80mm
349 MTA250D MTA250D SCH TURBINE Schlumbuger 100mm
350 MTA250FC MTA250FC SCH TURBINE Schlumbuger 80mm
351 MTA400C MTA400C SCH TURBINE Schlumbuger 80mm
352 MTA400D MTA400D SCH TURBINE Schlumbuger 100mm
353 MTA400FD MTA400FD SCH TURBINE Schlumbuger 100mm
354 MTA650D MTA650D SCH TURBINE Schlumbuger 100mm
355 MTA650E MTA650E SCH TURBINE Schlumbuger 150mm
356 MTA650FE MTA650FE SCH TURBINE Schlumbuger 150mm
357 MTA1000E MTA1000E SCH TURBINE Schlumbuger 150mm
358 MTA1000F MTA1000FSCH TURBINE Schlumbuger 200mm
359 MTA1000FE MTA1000FE SCH TURBINE Schlumbuger 150mm
360 MTA1600E MTA1600E SCH TURBINE Schlumbuger 150mm
361 MTA1600F MTA1600F SCH TURBINE Schlumbuger 200mm
362 MTA1600FF TURBINE Schlumbuger 200mm
363 MTA1600G MTA1600G SCH TURBINE Schlumbuger 250mm
364 MTA2500F TURBINE Schlumbuger 200mm
365 MTA2500FG TURBINE Schlumbuger 250mm
366 MTA2500G TURBINE Schlumbuger 250mm
367 MTA4000FG TURBINE Schlumbuger 250mm
368 MTA4000G TURBINE Schlumbuger 250mm
369 RG65 RG65 UGI ROTARY UGI 50mm
370 RG100 ROTARY UGI 80mm
371 RG160 RG160 UGI ROTARY UGI 80mm
372 RG250 ROTARY UGI 100mm
373 RG400 ROTARY UGI 150mm
374 RG650 ROTARY UGI 150mm
375 RG1000 RG1000 UGI ROTARY UGI 200mm

View File

@@ -1,12 +1,12 @@
CODE,OUTLET_CNTY_CODE,INLET_CNTY_CODE,DRWG_CODE,METR_CODE,REVA_CODE,SLVA_CODE,SVCP_CODE,WEIGHT,INLET_HEIGHT,INLET_SIZE,OUTLET_PRESSURE,OUTLET_HEIGHT,OUTLET_SIZE,BAS_CODE,HOU_CODE,DIM_A,DIM_B,DIM_C,DIM_D,DIM_E,DIM_F,DIM_H,VALID_FROM,VALID_TO,REGU_CODE,FLTR_CODE,INLET_CNOR_CODE,OUTLET_CNOR_CODE,LEAD_TIME,MANU_REF,Qmax
AD016S,(mm) BSPT,(mm) BS 746,lpvvstddia,MDA16,N/A,N/A,LP,30,170,25,21,180,40,U016LPB,GC2FSBB,550,320,95,170,180,,556,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,172.67
AD016SW,(mm) BSPT,(mm) BS 746,lpvvstddia,MDA16,N/A,N/A,LP,30,170,25,21,180,40,WALL MOUNTED,Gas Cab No 2BB,550,320,95,170,180,,556,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,172.67
AD025S,(mm) BSPT,(mm) BS 746,lpvvstddia,MDA25,N/A,N/A,LP,40,143,50,21,165,50,U025LPB,GC4BB25,637,270,78,143,165,,675,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,269.79
AD025SW,(mm) BSPT,(mm) BS 746,lpvvstddia,MDA25,N/A,N/A,LP,40,143,50,21,165,50,WALL MOUNTED,GC3BB,637,270,78,143,165,,675,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,269.79
AD040S,(mm) BSPT,(mm) BS 746,lpvvstddia,MDA40,N/A,N/A,LP,60,178,50,21,203,50,U040LPB,GC4BB40,750,350,137,178,203,,765,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,431.67
AD065S,(mm) PN16,(mm) BS 746,lpvvstddia,MDA65,N/A,N/A,LP,150,190,80,21,195,80,U065LPB,GC5BB,835,400,145,190,195,,1065,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,701.46
AD100S,(mm) PN16,(mm) PN16,lpvvstddia,MDA100,N/A,N/A,LP,200,271,80,21,172,80,U100LPB,Gas Cab No 6BB100,1061,510,172,271,172,,1140,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,1068.38
AD160S,(mm) PN16,(mm) PN16,lpvvstddia,MDA160,N/A,N/A,LP,250,305,100,21,250,100,U160LPB,Gas Cab No 6BB160,1115,530,172,305,250,,1175,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,1467.67
AD016S,(mm) BSPT,(mm) BS 746,lpvvstddia,MDA16,N/A,N/A,LP,30,265,25,21,356,40,U016LPB,GC2FSBB,550,320,95,265,356,,556,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,172.666666666667
AD016SW,(mm) BSPT,(mm) BS 746,lpvvstddia,MDA16,N/A,N/A,LP,30,265,25,21,356,40,WALL MOUNTED,Gas Cab No 2BB,550,320,95,265,356,,556,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,172.666666666667
AD025S,(mm) BSPT,(mm) BS 746,lpvvstddia,MDA25,N/A,N/A,LP,40,265,50,21,475,50,U025LPB,GC4BB25,637,270,78,265,475,,675,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,269.791666666667
AD025SW,(mm) BSPT,(mm) BS 746,lpvvstddia,MDA25,N/A,N/A,LP,40,265,50,21,475,50,WALL MOUNTED,GC3BB,637,270,78,265,475,,675,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,269.791666666667
AD040S,(mm) BSPT,(mm) BS 746,lpvvstddia,MDA40,N/A,N/A,LP,60,265,50,21,675,50,U040LPB,GC4BB40,750,350,137,265,675,,765,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,431.666666666667
AD065S,(mm) PN16,(mm) BS 746,lpvvstddia,MDA65,N/A,N/A,LP,150,265,80,21,800,80,U065LPB,GC5BB,835,400,145,265,800,,1065,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,701.458333333333
AD100S,(mm) PN16,(mm) PN16,lpvvstddia,MDA100,N/A,N/A,LP,200,500,80,21,873,80,U100LPB,Gas Cab No 6BB100,1061,510,172,500,873,,1140,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,1068.375
AD160S,(mm) PN16,(mm) PN16,lpvvstddia,MDA160,N/A,N/A,LP,250,500,100,21,939,100,U160LPB,Gas Cab No 6BB160,1115,530,172,500,939,,1175,,,Speryn G1000,Gause,Vertical Down,Vertical Up,,Actaris,1467.66666666667
ARCMVV0025A,(mm) BSPT,(mm) BSPT,lpcompact4,MRA25A,N/A,N/A,LP,125,265,40,21,160,40,RA0025LPB,Gas Cab No 2 (Multi),395,205,310,,,,565,,,Fig 226,Flat Strainer,Vertical Down,Vertical Down,,Actaris,268
ARCMVV0025AW,(mm) BSPT,(mm) BSPT,lpcompact4,MRA25A,N/A,N/A,LP,125,200,40,21,95,40,WALL MOUNTED,GC2,395,205,310,,,,500,,,Fig 226,Flat Strainer,Vertical Down,Vertical Down,,Actaris,268
ARCMVV0040AW,(mm) BSPT,(mm) BSPT,lpcompact4,MRA40A,N/A,N/A,LP,125,288,50,21,50,40,WALL MOUNTED,GC2,450,225,356,,,,595,,,Fig 226,Flat Strainer,Vertical Down,Vertical Down,,Actaris,429.36
@@ -47,14 +47,14 @@ ARVV0400A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA400D,N/A,N/A,LP,400,500,150,21,638,10
ARHH0400A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA400D,N/A,N/A,LP,400,800,150,21,800,100,RA0400LPB,Custom4,2324,700,1907,800,800,1743,1613,,,Fig 226,LOW LOSS STRAINER,Horizontal Left,Horizontal Right,,Actaris,3756.91
ARVH0400A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA400D,N/A,N/A,LP,400,500,150,21,800,100,RA0400LPB,Custom4,2324,700,1907,,800,1743,1613,,,Fig 226,LOW LOSS STRAINER,Vertical Down,Horizontal Right,,Actaris,3756.91
ARHV0400A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA400D,N/A,N/A,LP,400,800,150,21,638,100,RA0400LPB,Custom4,2324,700,1907,800,,1743,1613,,,Fig 226,LOW LOSS STRAINER,Horizontal Left,Vertical Down,,Actaris,3756.91
ARVV0650A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,470,500,150,21,562,150,RA0650LPB,Custom5,2861,700,2576,,,2172,1492,,,J48,LOW LOSS STRAINER,Vertical Down,Vertical Down,,Actaris,5201.58
ARHH0650A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,470,800,150,21,800,150,RA0650LPB,Custom5,2861,700,2576,800,800,2172,1492,,,J48,LOW LOSS STRAINER,Horizontal Left,Horizontal Right,,Actaris,5201.58
ARVH0650A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,470,500,150,21,800,150,RA0650LPB,Custom5,2861,700,2576,,800,2172,1492,,,J48,LOW LOSS STRAINER,Vertical Down,Horizontal Right,,Actaris,5201.58
ARHV0650A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,470,800,150,21,562,150,RA0650LPB,Custom5,2861,700,2576,800,,2172,1492,,,J48,LOW LOSS STRAINER,Horizontal Left,Vertical Down,,Actaris,5201.58
ARVV0650AP,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,800,500,150,21,561,150,RA0650+LPB,Custom6,3219,1322,2776,,,2836,1492,,,J48B,LOW LOSS STRAINER,Vertical Down,Vertical Down,,Actaris,6906.67
ARHH0650AP,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,800,800,150,21,800,150,RA0650+LPB,Custom6,3219,1322,2776,800,800,2836,1492,,,J48B,LOW LOSS STRAINER,Horizontal Left,Horizontal Right,,Actaris,6906.67
ARVH0650AP,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,800,500,150,21,800,150,RA0650+LPB,Custom6,3219,1322,2776,,800,2836,1492,,,J48B,LOW LOSS STRAINER,Vertical Down,Horizontal Right,,Actaris,6906.67
ARHV0650AP,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,800,800,150,21,561,150,RA0650+LPB,Custom6,3219,1322,2776,800,,2836,1492,,,J48B,LOW LOSS STRAINER,Horizontal Left,Vertical Down,,Actaris,6906.67
ARVV0650A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,470,500,150,21,562,150,RA0650LPB,Custom5,2861,700,2576,,,2172,1492,,,J48,LOW LOSS STRAINER,Vertical Down,Vertical Down,,Actaris,5201.58333333333
ARHH0650A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,470,800,150,21,800,150,RA0650LPB,Custom5,2861,700,2576,800,800,2172,1492,,,J48,LOW LOSS STRAINER,Horizontal Left,Horizontal Right,,Actaris,5201.58333333333
ARVH0650A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,470,500,150,21,800,150,RA0650LPB,Custom5,2861,700,2576,,800,2172,1492,,,J48,LOW LOSS STRAINER,Vertical Down,Horizontal Right,,Actaris,5201.58333333333
ARHV0650A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,470,800,150,21,562,150,RA0650LPB,Custom5,2861,700,2576,800,,2172,1492,,,J48,LOW LOSS STRAINER,Horizontal Left,Vertical Down,,Actaris,5201.58333333333
ARVV0650AP,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,800,500,150,21,561,150,RA0650+LPB,Custom6,3219,1322,2776,,,2836,1492,,,J48B,LOW LOSS STRAINER,Vertical Down,Vertical Down,,Actaris,6906.66666666667
ARHH0650AP,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,800,800,150,21,800,150,RA0650+LPB,Custom6,3219,1322,2776,800,800,2836,1492,,,J48B,LOW LOSS STRAINER,Horizontal Left,Horizontal Right,,Actaris,6906.66666666667
ARVH0650AP,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,800,500,150,21,800,150,RA0650+LPB,Custom6,3219,1322,2776,,800,2836,1492,,,J48B,LOW LOSS STRAINER,Vertical Down,Horizontal Right,,Actaris,6906.66666666667
ARHV0650AP,(mm) PN16,(mm) PN16,lplmvvhh1,MRA650SE,N/A,N/A,LP,800,800,150,21,561,150,RA0650+LPB,Custom6,3219,1322,2776,800,,2836,1492,,,J48B,LOW LOSS STRAINER,Horizontal Left,Vertical Down,,Actaris,6906.66666666667
ARVV1000A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA1000SE,N/A,N/A,LP,620,500,150,21,562,150,RA1000LPB,Custom5,2800,700,2515,,,2111,1613,,,Fig 226,LOW LOSS STRAINER,Vertical Down,Vertical Down,,Actaris,5549.5
ARHH1000A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA1000SE,N/A,N/A,LP,620,800,150,21,800,150,RA1000LPB,Custom5,2800,700,2515,800,800,2111,1613,,,Fig 226,LOW LOSS STRAINER,Horizontal Left,Horizontal Right,,Actaris,5549.5
ARVH1000A,(mm) PN16,(mm) PN16,lplmvvhh1,MRA1000SE,N/A,N/A,LP,620,500,150,21,800,150,RA1000LPB,Custom5,2800,700,2515,,800,2111,1613,,,Fig 226,LOW LOSS STRAINER,Vertical Down,Horizontal Right,,Actaris,5549.5
@@ -63,33 +63,33 @@ ARVV1000AP,(mm) PN16,(mm) PN16,lplmvvhh1,MRA1000SE,N/A,N/A,LP,1000,500,150,21,56
ARHH1000AP,(mm) PN16,(mm) PN16,lplmvvhh1,MRA1000SE,N/A,N/A,LP,1000,800,150,21,800,150,RA1000+LPB,Custom6,3245,1345,2801,800,800,2862,1613,,,Fig 226,LOW LOSS STRAINER,Horizontal Left,Horizontal Right,,Actaris,7181
ARVH1000AP,(mm) PN16,(mm) PN16,lplmvvhh1,MRA1000SE,N/A,N/A,LP,1000,500,150,21,800,150,RA1000+LPB,Custom6,3245,1345,2801,,800,2862,1613,,,Fig 226,LOW LOSS STRAINER,Vertical Down,Horizontal Right,,Actaris,7181
ARHV1000AP,(mm) PN16,(mm) PN16,lplmvvhh1,MRA1000SE,N/A,N/A,LP,1000,800,150,21,561,150,RA1000+LPB,Custom6,3245,1345,2801,800,,2862,1613,,,Fig 226,LOW LOSS STRAINER,Horizontal Left,Vertical Down,,Actaris,7181
ASD016A,(mm) BSPT,(mm) BSPT,mpvvstddia,MDA16,Integral,Integral,MP270,30,265,20,21,337,40,U016MPB,Gas Cab No 2MP,483,346,363,,,,653,,,RBI 2011,Y Type,Vertical Down,Vertical Up,,Actaris,172.67
ASD025A,(mm) BSPT,(mm) BSPT,mpvvstddia,MDA25,Integral,Integral,MP270,40,265,25,21,471,50,U025MPB,GC4+,797,308,579,,,,854,,,RBI 2111,Y Type,Vertical Down,Vertical Up,,Actaris,269.79
ASD040A,(mm) BSPT,(mm) BSPT,mpvvstddia,MDA40,Integral,Integral,MP270,60,265,25,21,649,50,U040MPB,GC4+,875,381,678,,,,954,,,RBE2611,Y Type,Vertical Down,Vertical Up,,Actaris,431.67
ASD065A,(mm) PN16,(mm) BSPT,mpvvstddia,MDA65,Integral,Integral,MP270,98,265,50,21,1106,80,U065MPB,Gas Cab No 6,1072,385,762,,,,1117,,,RBI 3211,Y Type,Vertical Down,Vertical Up,,Actaris,701.46
ASD100A,(mm) PN16,(mm) BSPT,mpvvstddia,MDA100,VS811,Integral,MP270,137,265,50,21,957,80,U100MPB,Gas Cab No 6,1180,601,828,,,,1341,,,RBE 4011,Y Type,Vertical Down,Vertical Up,,Actaris,1079.17
ASD160A,(mm) PN16,(mm) BSPT,mpvvstddia,MDA160,VS811,Integral,MP270,193,265,50,21,1000,100,U160MPB,Gas Cab No 6,1301,645,816,,,,1324,,,RBE1811,Y Type,Vertical Down,Vertical Up,,Actaris,1726.67
ASR0025A,(mm) BSPT,(mm) BSPT,actmp1,MRA25A,Integral,Integral,MP270,50,265,25,21,225,40,RA0025MPB,Gas Cab No 2 (Multi),627,260,400,,,,711,,,RBI 2111,Y Type,Vertical Down,Vertical Down,,Actaris,269.79
ASR0040A,(mm) BSPT,(mm) BSPT,actmp1,MRA40A,Integral,Integral,MP270,55,265,25,21,303,40,RA0040MPB,GC4+,861,260,686,,,,672,,,RBI 2611,Y Type,Vertical Down,Vertical Down,,Actaris,431.67
ASR0100A,(mm) BSPT,(mm) BSPT,actmp2,MRA100B,VS811,Integral,MP270,70,265,50,21,316,50,RA0100MPB,GC5,1070,484,800,,,,1268,,,RBE 4011,Y Type,Vertical Down,Vertical Down,,Actaris,1079.17
ASR0160A,(mm) PN16,(mm) BSPT,actmp3,MRA160C,VS811,Integral,MP270,100,265,50,21,101,80,RA0160MPB,GC8,1470,450,1280,,,,1210,,,RBE1811,Angle Pattern,Vertical Down,Vertical Down,,Actaris,1726.67
ASR0200A,(mm) PN16,(mm) BSPT,actmp4,MRA200C,VS811,Integral,MP270,100,265,50,21,102,80,RA0200MPB,GC8,1413,496,1223,,,,1198,,,RBE1811,Angle Pattern,Vertical Down,Vertical Down,,Actaris,2158.33
ASR0250A,(mm) PN16,(mm) PN16,actmp4,MRA250C,VS811,Integral,MP270,160,500,80,21,222,80,RA0250MPB,GC8,1446,495,1240,,,,1392,,,RBE1811,Angle Pattern,Vertical Down,Vertical Down,,Actaris,2697.92
ASD016A,(mm) BSPT,(mm) BSPT,mpvvstddia,MDA16,Integral,Integral,MP270,30,265,20,21,337,40,U016MPB,Gas Cab No 2MP,483,346,363,,,,653,,,RBI 2011,Y Type,Vertical Down,Vertical Up,,Actaris,172.666666666667
ASD025A,(mm) BSPT,(mm) BSPT,mpvvstddia,MDA25,Integral,Integral,MP270,40,265,25,21,471,50,U025MPB,GC4+,797,308,579,,,,854,,,RBI 2111,Y Type,Vertical Down,Vertical Up,,Actaris,269.791666666667
ASD040A,(mm) BSPT,(mm) BSPT,mpvvstddia,MDA40,Integral,Integral,MP270,60,265,25,21,649,50,U040MPB,GC4+,875,381,678,,,,954,,,RBE2611,Y Type,Vertical Down,Vertical Up,,Actaris,431.666666666667
ASD065A,(mm) PN16,(mm) BSPT,mpvvstddia,MDA65,Integral,Integral,MP270,98,265,50,21,1106,80,U065MPB,Gas Cab No 6,1072,385,762,,,,1117,,,RBI 3211,Y Type,Vertical Down,Vertical Up,,Actaris,701.458333333333
ASD100A,(mm) PN16,(mm) BSPT,mpvvstddia,MDA100,VS811,Integral,MP270,137,265,50,21,957,80,U100MPB,Gas Cab No 6,1180,601,828,,,,1341,,,RBE 4011,Y Type,Vertical Down,Vertical Up,,Actaris,1079.16666666667
ASD160A,(mm) PN16,(mm) BSPT,mpvvstddia,MDA160,VS811,Integral,MP270,193,265,50,21,1000,100,U160MPB,Gas Cab No 6,1301,645,816,,,,1324,,,RBE1811,Y Type,Vertical Down,Vertical Up,,Actaris,1726.66666666667
ASR0025A,(mm) BSPT,(mm) BSPT,actmp1,MRA25A,Integral,Integral,MP270,50,265,25,21,225,40,RA0025MPB,Gas Cab No 2 (Multi),627,260,400,,,,711,,,RBI 2111,Y Type,Vertical Down,Vertical Down,,Actaris,269.791666666667
ASR0040A,(mm) BSPT,(mm) BSPT,actmp1,MRA40A,Integral,Integral,MP270,55,265,25,21,303,40,RA0040MPB,GC4+,861,260,686,,,,672,,,RBI 2611,Y Type,Vertical Down,Vertical Down,,Actaris,431.666666666667
ASR0100A,(mm) BSPT,(mm) BSPT,actmp2,MRA100B,VS811,Integral,MP270,70,265,50,21,316,50,RA0100MPB,GC5,1070,484,800,,,,1268,,,RBE 4011,Y Type,Vertical Down,Vertical Down,,Actaris,1079.16666666667
ASR0160A,(mm) PN16,(mm) BSPT,actmp3,MRA160C,VS811,Integral,MP270,100,265,50,21,101,80,RA0160MPB,GC8,1470,450,1280,,,,1210,,,RBE1811,Angle Pattern,Vertical Down,Vertical Down,,Actaris,1726.66666666667
ASR0200A,(mm) PN16,(mm) BSPT,actmp4,MRA200C,VS811,Integral,MP270,100,265,50,21,102,80,RA0200MPB,GC8,1413,496,1223,,,,1198,,,RBE1811,Angle Pattern,Vertical Down,Vertical Down,,Actaris,2158.33333333333
ASR0250A,(mm) PN16,(mm) PN16,actmp4,MRA250C,VS811,Integral,MP270,160,500,80,21,222,80,RA0250MPB,GC8,1446,495,1240,,,,1392,,,RBE1811,Angle Pattern,Vertical Down,Vertical Down,,Actaris,2697.91666666667
ASR0300A,(mm) PN16,(mm) PN16,actmp4,MRA300D,VS811,Integral,MP270,350,500,80,21,200,100,RA0300MPB,GC8,1537,585,1310,,,,1365,,,RBE 4011,Angle Pattern,Vertical Down,Vertical Down,,Actaris,3237.5
ASR0400A,(mm) PN16,(mm) PN16,actmp5,MRA400D,VS811,Integral,MP270,375,500,80,21,104,100,RA0400MPB,GC8,1537,749,1310,,,,1400,,,RBE 4011,Angle Pattern,Vertical Down,Vertical Down,,Actaris,4316.67
ASR0650A,(mm) PN16,(mm) PN16,actmp6,MRA650SE,VS811,Integral,MP270,500,500,100,21,151,150,RA0650MPB,Custom2,1832,765,1467,,,,1918,,,RBE 4011,Angle Pattern,Vertical Down,Vertical Down,,Actaris,5719.58
ASR0400A,(mm) PN16,(mm) PN16,actmp5,MRA400D,VS811,Integral,MP270,375,500,80,21,104,100,RA0400MPB,GC8,1537,749,1310,,,,1400,,,RBE 4011,Angle Pattern,Vertical Down,Vertical Down,,Actaris,4316.66666666667
ASR0650A,(mm) PN16,(mm) PN16,actmp6,MRA650SE,VS811,Integral,MP270,500,500,100,21,151,150,RA0650MPB,Custom2,1832,765,1467,,,,1918,,,RBE 4011,Angle Pattern,Vertical Down,Vertical Down,,Actaris,5719.58333333333
ASR1000A,(mm) PN16,(mm) PN16,actmp7,MRA1000SE,VS811,Integral,MP270,750,500,150,21,85,150,RA1000MPB,Custom3,1843,848,1515,,,,2067,,,RBE 4011,Angle Pattern,Vertical Down,Vertical Down,,Actaris,8093.75
ASR0025D, 2" BSPT,1.5" BSPT,dremp1,MRD0025B4B,Integral,Integral,MP270,65,265,40,21,200,50,RD0025MPB,GC4+,760,375,500,,,,1130,,,Donkin Fig 270R/309LP,Y Type,Vertical Down,Vertical Down,,Dresser,248.21
ASR0040D,(mm) BSPT,(mm) BSPT,dremp1,MRD0040B4B,Integral,Integral,MP270,65,265,40,21,340,50,RD0040MPB,GC4+,825,550,550,,,,1122,,,Donkin Fig 270R/309LP,Y Type,Vertical Down,Vertical Down,,Dresser,431.67
ASR0065D,(mm) BSPT,(mm) BSPT,dremp1,MRD0065B4B,Integral,Integral,MP270,65,265,40,21,340,50,RD0065MPB,GC4+,825,550,550,,,,1125,,,Donkin Fig 270R/309LP,Y Type,Vertical Down,Vertical Down,,Dresser,615.13
ASR0100D,(mm) BSPT,(mm) BSPT,dremp1,MRD0100B4B,Integral,Integral,MP270,65,265,40,21,340,50,RD0100MPB,GC4+,825,550,550,,,,1125,,,Donkin Fig 270R/309LP,Y Type,Vertical Down,Vertical Down,,Dresser,874.13
ASR0160D,(mm) PN16,(mm) PN16,nodraw1,MRD0160B4C,Integral,Integral,MP270,84,265,50,21,307,80,RD0160MPB,Gas Cab No 6,1310,560,990,,,,1320,,,Donkin Fig 277R,Y Type,Vertical Down,Vertical Down,,Dresser,1402.92
ASR0250D,(mm) PN16,(mm) PN16,dremp2,MRD0250B4D,10L,Integral,MP270,270,500,80,21,250,80,RD0250MPB,GC8,1490,600,1192,,,,1550,,,Donkin Fig 280/309,Angle Pattern,Vertical Down,Vertical Down,,Dresser,2482.08
ASR0310D,(mm) PN16,(mm) PN16,dremp2,MRD0310B4D,10L,Integral,MP270,280,500,80,21,250,100,RD0310MPB,GC8,1490,600,1205,,,,1550,,,Donkin Fig 280/309,Angle Pattern,Vertical Down,Vertical Down,,Dresser,3075.63
ASR0450D,(mm) PN16,(mm) PN16,dremp3,MRD0450B4D,10L,Donkin Fig 305,MP270,410,500,80,21,340,100,RD0450MPB,Custom1,2035,750,400,,,,1450,,,Donkin Fig 280,Angle Pattern,Vertical Down,Vertical Down,,Dresser,3906.58
ASR0450DP,(mm) PN16,(mm) PN16,dremp3,MRD0450B4D,10L,Donkin Fig 305,MP270,425,500,100,21,435,100,RD0450+MPB,Custom1,2070,750,400,,,,1545,,,Donkin Fig 280,Angle Pattern,Vertical Down,Vertical Down,,Dresser,3906.58
ASR0650D,(mm) PN16,(mm) PN16,dremp3,MRD0650B4E,10L,Donkin Fig 305,MP270,600,500,100,21,215,150,RD0650MPB,Custom4,2450,800,400,,,,1590,,,Donkin Fig 280,Angle Pattern,Vertical Down,Vertical Down,,Dresser,5903.04
ASR1075D,(mm) PN16,(mm) PN16,dremp4,MRD1075B4E,10L,Donkin Fig 305,MP270,750,500,150,21,200,150,RD1075MPB,Custom5,2720,796,400,,,,1725,,,Donkin Fig 280,Angle Pattern,Vertical Down,Vertical Down,,Dresser,7662.08
ASR1600D,(mm) PN16,(mm) PN16,dremp3,MRD1600B4F,10L,Donkin Fig 305,MP270,1000,500,150,21,200,200,RD1600MPB,Custom5,2970,925,450,,,,1900,,,Donkin Fig 280,Angle Pattern,Vertical Down,Vertical Down,,Dresser,12744.96
ASR2885D,(mm) PN16,(mm) PN16,nodraw1,MRD2885A10,10L,Donkin Fig 305,MP270,1680,550,200,21,474,250,RD2885MPB,Custom7,3080,2595,1800,550,474,,1767,,,Donkin Fig 680,100 RED In line,Vertical Down,Vertical Down,,Dresser,23061.79
ASD016AW,(mm) BSPT,(mm) BSPT,mpvvstddia,MDA16,Integral,Integral,MP270,30,265,20,21,337,40,U016MPB,GC2MP,483,346,363,,,,653,,,RBI 2011,Y Type,Vertical Down,Vertical Up,,Actaris,172.67
ASR0025D, 2" BSPT,1.5" BSPT,dremp1,MRD0025B4B,Integral,Integral,MP270,65,265,40,21,200,50,RD0025MPB,GC4+,760,375,500,,,,1130,,,Donkin Fig 270R/309LP,Y Type,Vertical Down,Vertical Down,,Dresser,248.208333333333
ASR0040D,(mm) BSPT,(mm) BSPT,dremp1,MRD0040B4B,Integral,Integral,MP270,65,265,40,21,340,50,RD0040MPB,GC4+,825,550,550,,,,1122,,,Donkin Fig 270R/309LP,Y Type,Vertical Down,Vertical Down,,Dresser,431.666666666667
ASR0065D,(mm) BSPT,(mm) BSPT,dremp1,MRD0065B4B,Integral,Integral,MP270,65,265,40,21,340,50,RD0065MPB,GC4+,825,550,550,,,,1125,,,Donkin Fig 270R/309LP,Y Type,Vertical Down,Vertical Down,,Dresser,615.125
ASR0100D,(mm) BSPT,(mm) BSPT,dremp1,MRD0100B4B,Integral,Integral,MP270,65,265,40,21,340,50,RD0100MPB,GC4+,825,550,550,,,,1125,,,Donkin Fig 270R/309LP,Y Type,Vertical Down,Vertical Down,,Dresser,874.125
ASR0160D,(mm) PN16,(mm) PN16,nodraw1,MRD0160B4C,Integral,Integral,MP270,84,265,50,21,307,80,RD0160MPB,Gas Cab No 6,1310,560,990,,,,1320,,,Donkin Fig 277R,Y Type,Vertical Down,Vertical Down,,Dresser,1402.91666666667
ASR0250D,(mm) PN16,(mm) PN16,dremp2,MRD0250B4D,10L,Integral,MP270,270,500,80,21,250,80,RD0250MPB,GC8,1490,600,1192,,,,1550,,,Donkin Fig 280/309,Angle Pattern,Vertical Down,Vertical Down,,Dresser,2482.08333333333
ASR0310D,(mm) PN16,(mm) PN16,dremp2,MRD0310B4D,10L,Integral,MP270,280,500,80,21,250,100,RD0310MPB,GC8,1490,600,1205,,,,1550,,,Donkin Fig 280/309,Angle Pattern,Vertical Down,Vertical Down,,Dresser,3075.625
ASR0450D,(mm) PN16,(mm) PN16,dremp3,MRD0450B4D,10L,Donkin Fig 305,MP270,410,500,80,21,340,100,RD0450MPB,Custom1,2035,750,400,,,,1450,,,Donkin Fig 280,Angle Pattern,Vertical Down,Vertical Down,,Dresser,3906.58333333333
ASR0450DP,(mm) PN16,(mm) PN16,dremp3,MRD0450B4D,10L,Donkin Fig 305,MP270,425,500,100,21,435,100,RD0450+MPB,Custom1,2070,750,400,,,,1545,,,Donkin Fig 280,Angle Pattern,Vertical Down,Vertical Down,,Dresser,3906.58333333333
ASR0650D,(mm) PN16,(mm) PN16,dremp3,MRD0650B4E,10L,Donkin Fig 305,MP270,600,500,100,21,215,150,RD0650MPB,Custom4,2450,800,400,,,,1590,,,Donkin Fig 280,Angle Pattern,Vertical Down,Vertical Down,,Dresser,5903.04166666667
ASR1075D,(mm) PN16,(mm) PN16,dremp4,MRD1075B4E,10L,Donkin Fig 305,MP270,750,500,150,21,200,150,RD1075MPB,Custom5,2720,796,400,,,,1725,,,Donkin Fig 280,Angle Pattern,Vertical Down,Vertical Down,,Dresser,7662.08333333333
ASR1600D,(mm) PN16,(mm) PN16,dremp3,MRD1600B4F,10L,Donkin Fig 305,MP270,1000,500,150,21,200,200,RD1600MPB,Custom5,2970,925,450,,,,1900,,,Donkin Fig 280,Angle Pattern,Vertical Down,Vertical Down,,Dresser,12744.9583333333
ASR2885D,(mm) PN16,(mm) PN16,nodraw1,MRD2885A10,10L,Donkin Fig 305,MP270,1680,550,200,21,474,250,RD2885MPB,Custom7,3080,2595,1800,550,474,,1767,,,Donkin Fig 680,100 RED In line,Vertical Down,Vertical Down,,Dresser,23061.7916666667
ASD016AW,(mm) BSPT,(mm) BSPT,mpvvstddia,MDA16,Integral,Integral,MP270,30,265,20,21,337,40,U016MPB,GC2MP,483,346,363,,,,653,,,RBI 2011,Y Type,Vertical Down,Vertical Up,,Actaris,172.666666666667
Can't render this file because it contains an unexpected character in line 82 and column 12.