Latest version of BULK_LOAD.xls exported as CSV files, changes to syco.ctl file.

Modified mip_bulk_load.pck to convert '"' to 'inch' in meter size codes imported from LABOUR_COSTS.csv.

git-svn-id: http://locode01.ad.dom/svn/WEBMIP/trunk@3527 248e525c-4dfb-0310-94bc-949c084e9493
This commit is contained in:
hardya
2008-02-12 16:52:40 +00:00
parent 7504e1196b
commit 3dcee7fb94
13 changed files with 15717 additions and 13203 deletions

View File

@@ -1,6 +1,4 @@
"CODE","DRWG_CODE","DESCRIPTION","DIM_A","DIM_B","DIM_C","DIM_D","DIM_E","DIM_F","DIM_G","DIM_H","DIM_I","DEPTH"
"0","H",,0,0,0,0,0,0,0,0,0,0
"CustomB","H",,0,0,0,0,0,0,0,0,0,0
"RA0025LPB","H",,950,700,350,80,370,320,80,370,240,100
"RA0025MPB","H",,950,700,350,80,335,275,100,345,275,100
"RA0040LPB","H",,950,750,350,80,347,297,80,347,297,100
1 CODE DRWG_CODE DESCRIPTION DIM_A DIM_B DIM_C DIM_D DIM_E DIM_F DIM_G DIM_H DIM_I DEPTH
0 H 0 0 0 0 0 0 0 0 0 0
CustomB H 0 0 0 0 0 0 0 0 0 0
2 RA0025LPB H 950 700 350 80 370 320 80 370 240 100
3 RA0025MPB H 950 700 350 80 335 275 100 345 275 100
4 RA0040LPB H 950 750 350 80 347 297 80 347 297 100

Binary file not shown.

View File

@@ -1,330 +1,334 @@
DOCUMENT_POSITION,ENTY_CODE,METY_CODE,SVCPT_CODE,SORT_ORDER,TEXT
CONT_SUM,ADVERSARIAL,TURBINE,LP,1,excluding lifting gear changes
CONT_SUM,ADVERSARIAL,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,ROTARY,LP,1,excluding lifting gear changes
CONT_SUM,ADVERSARIAL,TURBINE,LP,2,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,ROTARY,LP,2,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,DIAPHRAGM,MP,1,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,ROTARY,MP,1,excluding lifting gear changes
CONT_SUM,ADVERSARIAL,TURBINE,MP,1,excluding lifting gear changes
CONT_SUM,ADVERSARIAL,ROTARY,MP,2,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,TURBINE,MP,2,plus purging on time and materials basis.
CONT_SUM,STD REMOVE,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,ROTARY,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,TURBINE,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,TURBINE,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,DIAPHRAGM,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,ROTARY,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,STD REMOVE,DIAPHRAGM,LP,1,plus purging on time and materials basis.
DESC_WORK,ADVERSARIAL,DIAPHRAGM,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,TURBINE,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,ROTARY,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,DIAPHRAGM,MP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,ROTARY,MP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,TURBINE,MP,1,Purging of downstream pipework.
DESC_WORK,EXCHANGE,ROTARY,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,DIAPHRAGM,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,TURBINE,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,ROTARY,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,TURBINE,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,DIAPHRAGM,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,REMOVE,DIAPHRAGM,LP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,TURBINE,LP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,ROTARY,LP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,ROTARY,MP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,DIAPHRAGM,MP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,TURBINE,MP,1,Purging of downstream pipework.
DESC_WORK,STD EXCHANGE,TURBINE,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,DIAPHRAGM,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,ROTARY,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,TURBINE,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,ROTARY,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,DIAPHRAGM,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD REMOVE,DIAPHRAGM,LP,1,Purging of downstream pipework.
TERM_COND,ADDON,DIAPHRAGM,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,TURBINE,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,DIAPHRAGM,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,ROTARY,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,ROTARY,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,DIAPHRAGM,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,DIAPHRAGM,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,TURBINE,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,DIAPHRAGM,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,DIAPHRAGM,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,ROTARY,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,TURBINE,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADVERSARIAL,DIAPHRAGM,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,ADVERSARIAL,TURBINE,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"DOCUMENT_POSITION","ENTY_CODE","METY_CODE","SVCPT_CODE","SORT_ORDER","TEXT"
"CONT_SUM","ADVERSARIAL","TURBINE","LP",1,"excluding lifting gear changes
"
TERM_COND,ADVERSARIAL,ROTARY,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,ADVERSARIAL,TURBINE,LP,2,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,ROTARY,LP,2,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,ROTARY,MP,1,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,TURBINE,MP,1,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,EXCHANGE,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
TERM_COND,EXCHANGE,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,ROTARY,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,ROTARY,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,DIAPHRAGM,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,ROTARY,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,ROTARY,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,TURBINE,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,INSTALL,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,OFMAT,DIAPHRAGM,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,ROTARY,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,TURBINE,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,DIAPHRAGM,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,ROTARY,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,TURBINE,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,REMOVE,ROTARY,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,REMOVE,DIAPHRAGM,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",1,"excluding lifting gear changes
"
TERM_COND,REMOVE,TURBINE,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,REMOVE,DIAPHRAGM,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,ROTARY,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,TURBINE,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,TURBINE,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,DIAPHRAGM,MP,1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,ROTARY,MP,1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,TURBINE,MP,1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,STD EXCHANGE,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"CONT_SUM","ADVERSARIAL","TURBINE","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","MP",1,"excluding lifting gear changes
"
"CONT_SUM","ADVERSARIAL","TURBINE","MP",1,"excluding lifting gear changes
"
"CONT_SUM","ADVERSARIAL","ROTARY","MP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","MP",2,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"TERM_COND","ADDON","DIAPHRAGM","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","DIAPHRAGM","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","DIAPHRAGM","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","DIAPHRAGM","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","TURBINE","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADVERSARIAL","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","ADVERSARIAL","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","TURBINE","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","TURBINE","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","OFMAT","DIAPHRAGM","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","DIAPHRAGM","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
"
TERM_COND,STD EXCHANGE,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,ROTARY,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,TURBINE,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,ROTARY,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,TURBINE,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD EXCHANGE","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,ROTARY,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,TURBINE,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,ROTARY,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,TURBINE,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD INSTALL,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD REMOVE,DIAPHRAGM,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,STD REMOVE,DIAPHRAGM,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
1 DOCUMENT_POSITION ENTY_CODE METY_CODE SVCPT_CODE SORT_ORDER TEXT
2 CONT_SUM ADVERSARIAL TURBINE LP 1 excluding lifting gear changes excluding lifting gear changes
CONT_SUM ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL ROTARY LP 1 excluding lifting gear changes
CONT_SUM ADVERSARIAL TURBINE LP 2 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL ROTARY LP 2 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL ROTARY MP 1 excluding lifting gear changes
CONT_SUM ADVERSARIAL TURBINE MP 1 excluding lifting gear changes
CONT_SUM ADVERSARIAL ROTARY MP 2 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL TURBINE MP 2 plus purging on time and materials basis.
CONT_SUM STD REMOVE DIAPHRAGM LP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL ROTARY LP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL TURBINE LP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL TURBINE MP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL ROTARY MP 1 plus purging on time and materials basis.
CONT_SUM_QA STD REMOVE DIAPHRAGM LP 1 plus purging on time and materials basis.
DESC_WORK ADVERSARIAL DIAPHRAGM LP 1 Purging of downstream pipework.
DESC_WORK ADVERSARIAL TURBINE LP 1 Purging of downstream pipework.
DESC_WORK ADVERSARIAL ROTARY LP 1 Purging of downstream pipework.
DESC_WORK ADVERSARIAL DIAPHRAGM MP 1 Purging of downstream pipework.
DESC_WORK ADVERSARIAL ROTARY MP 1 Purging of downstream pipework.
DESC_WORK ADVERSARIAL TURBINE MP 1 Purging of downstream pipework.
DESC_WORK EXCHANGE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK EXCHANGE DIAPHRAGM LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK EXCHANGE DIAPHRAGM MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
DESC_WORK REMOVE TURBINE LP 1 Purging of downstream pipework.
DESC_WORK REMOVE ROTARY LP 1 Purging of downstream pipework.
DESC_WORK REMOVE ROTARY MP 1 Purging of downstream pipework.
DESC_WORK REMOVE DIAPHRAGM MP 1 Purging of downstream pipework.
DESC_WORK REMOVE TURBINE MP 1 Purging of downstream pipework.
DESC_WORK STD EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD EXCHANGE DIAPHRAGM LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD EXCHANGE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD EXCHANGE DIAPHRAGM MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
TERM_COND ADDON DIAPHRAGM LP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON TURBINE LP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON ROTARY LP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON DIAPHRAGM LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON TURBINE LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON ROTARY LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON TURBINE LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADDON ROTARY LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADDON DIAPHRAGM LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADDON DIAPHRAGM MP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON ROTARY MP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON TURBINE MP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON ROTARY MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON DIAPHRAGM MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON TURBINE MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON DIAPHRAGM MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADDON ROTARY MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADDON TURBINE MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADVERSARIAL DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND ADVERSARIAL TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
3 TERM_COND CONT_SUM ADVERSARIAL ROTARY DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. plus purging on time and materials basis.
4 TERM_COND CONT_SUM ADVERSARIAL TURBINE ROTARY LP 2 1 Lifting gear if required will be charged at a rate of 400 per day. excluding lifting gear changes
5 TERM_COND CONT_SUM ADVERSARIAL ROTARY TURBINE LP 2 Lifting gear if required will be charged at a rate of 400 per day. plus purging on time and materials basis.
TERM_COND ADVERSARIAL ROTARY MP 1 Lifting gear if required will be charged at a rate of 400 per day.
TERM_COND ADVERSARIAL TURBINE MP 1 Lifting gear if required will be charged at a rate of 400 per day.
TERM_COND EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
TERM_COND EXCHANGE DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE DIAPHRAGM LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE TURBINE LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE ROTARY LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE DIAPHRAGM LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE TURBINE LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE ROTARY LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE TURBINE LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE ROTARY LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE DIAPHRAGM LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE DIAPHRAGM MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE ROTARY MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE TURBINE MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE DIAPHRAGM MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE ROTARY MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE TURBINE MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND INSTALL ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND INSTALL TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND INSTALL ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND INSTALL ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL TURBINE LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND INSTALL DIAPHRAGM LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND INSTALL ROTARY LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND INSTALL ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND INSTALL ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND INSTALL DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND INSTALL ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND INSTALL ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND INSTALL DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND OFMAT DIAPHRAGM LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT ROTARY LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT TURBINE LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT DIAPHRAGM MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT ROTARY MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT TURBINE MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND REMOVE ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE ROTARY LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE DIAPHRAGM MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE ROTARY MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE TURBINE MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND STD EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD EXCHANGE DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD EXCHANGE DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND STD EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND STD EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND STD EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD EXCHANGE DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD EXCHANGE TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND STD EXCHANGE ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
6 TERM_COND CONT_SUM STD EXCHANGE ADVERSARIAL DIAPHRAGM ROTARY LP 6 2 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. plus purging on time and materials basis.
7 TERM_COND CONT_SUM STD EXCHANGE ADVERSARIAL TURBINE DIAPHRAGM LP MP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. plus purging on time and materials basis.
8 TERM_COND CONT_SUM STD EXCHANGE ADVERSARIAL DIAPHRAGM ROTARY LP MP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. excluding lifting gear changes
9 TERM_COND CONT_SUM STD EXCHANGE ADVERSARIAL ROTARY TURBINE LP MP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. excluding lifting gear changes
10 TERM_COND CONT_SUM STD EXCHANGE ADVERSARIAL ROTARY LP MP 8 2 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. plus purging on time and materials basis.
11 TERM_COND CONT_SUM STD EXCHANGE ADVERSARIAL TURBINE LP MP 8 2 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. plus purging on time and materials basis.
12 TERM_COND CONT_SUM STD EXCHANGE STD REMOVE DIAPHRAGM LP 8 1 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. plus purging on time and materials basis.
13 TERM_COND CONT_SUM_QA STD EXCHANGE ADVERSARIAL ROTARY LP 9 1 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. plus purging on time and materials basis.
14 TERM_COND CONT_SUM_QA STD EXCHANGE ADVERSARIAL DIAPHRAGM LP 9 1 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. plus purging on time and materials basis.
15 TERM_COND CONT_SUM_QA STD EXCHANGE ADVERSARIAL TURBINE LP 9 1 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. plus purging on time and materials basis.
16 TERM_COND CONT_SUM_QA STD EXCHANGE ADVERSARIAL ROTARY TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. plus purging on time and materials basis.
17 TERM_COND CONT_SUM_QA STD EXCHANGE ADVERSARIAL TURBINE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. plus purging on time and materials basis.
18 TERM_COND CONT_SUM_QA STD EXCHANGE ADVERSARIAL DIAPHRAGM ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. plus purging on time and materials basis.
19 TERM_COND CONT_SUM_QA STD EXCHANGE STD REMOVE TURBINE DIAPHRAGM MP LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. plus purging on time and materials basis.
20 TERM_COND DESC_WORK STD EXCHANGE ADVERSARIAL ROTARY DIAPHRAGM MP LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Purging of downstream pipework.
21 TERM_COND DESC_WORK STD EXCHANGE ADVERSARIAL DIAPHRAGM TURBINE MP LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Purging of downstream pipework.
22 TERM_COND DESC_WORK STD EXCHANGE ADVERSARIAL DIAPHRAGM ROTARY MP LP 3 1 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Purging of downstream pipework.
23 TERM_COND DESC_WORK STD EXCHANGE ADVERSARIAL ROTARY DIAPHRAGM MP 3 1 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Purging of downstream pipework.
24 TERM_COND DESC_WORK STD EXCHANGE ADVERSARIAL TURBINE ROTARY MP 3 1 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Purging of downstream pipework.
25 TERM_COND DESC_WORK STD EXCHANGE ADVERSARIAL TURBINE MP 4 1 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Purging of downstream pipework.
26 TERM_COND DESC_WORK STD EXCHANGE EXCHANGE DIAPHRAGM ROTARY MP LP 4 1 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
27 TERM_COND DESC_WORK STD EXCHANGE EXCHANGE ROTARY DIAPHRAGM MP LP 4 1 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
28 DESC_WORK EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
29 DESC_WORK EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
30 DESC_WORK EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
31 DESC_WORK EXCHANGE DIAPHRAGM MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
32 DESC_WORK REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
33 DESC_WORK REMOVE TURBINE LP 1 Purging of downstream pipework.
34 DESC_WORK REMOVE ROTARY LP 1 Purging of downstream pipework.
35 DESC_WORK REMOVE ROTARY MP 1 Purging of downstream pipework.
36 DESC_WORK REMOVE DIAPHRAGM MP 1 Purging of downstream pipework.
37 DESC_WORK REMOVE TURBINE MP 1 Purging of downstream pipework.
38 DESC_WORK STD EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
39 DESC_WORK STD EXCHANGE DIAPHRAGM LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
40 DESC_WORK STD EXCHANGE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
41 DESC_WORK STD EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
42 DESC_WORK STD EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
43 DESC_WORK STD EXCHANGE DIAPHRAGM MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
44 DESC_WORK STD REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
45 TERM_COND ADDON DIAPHRAGM LP 1 This quotation is based on there being a working LF connection on the existing meter.
46 TERM_COND ADDON TURBINE LP 1 This quotation is based on there being a working LF connection on the existing meter.
47 TERM_COND ADDON ROTARY LP 1 This quotation is based on there being a working LF connection on the existing meter.
48 TERM_COND ADDON DIAPHRAGM LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
49 TERM_COND ADDON TURBINE LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
50 TERM_COND ADDON ROTARY LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
51 TERM_COND ADDON TURBINE LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
52 TERM_COND ADDON ROTARY LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
53 TERM_COND ADDON DIAPHRAGM LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
54 TERM_COND ADDON DIAPHRAGM MP 1 This quotation is based on there being a working LF connection on the existing meter.
55 TERM_COND ADDON ROTARY MP 1 This quotation is based on there being a working LF connection on the existing meter.
56 TERM_COND ADDON TURBINE MP 1 This quotation is based on there being a working LF connection on the existing meter.
57 TERM_COND ADDON ROTARY MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
58 TERM_COND ADDON DIAPHRAGM MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
59 TERM_COND ADDON TURBINE MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
60 TERM_COND ADDON DIAPHRAGM MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
61 TERM_COND ADDON ROTARY MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
62 TERM_COND ADDON TURBINE MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
63 TERM_COND ADVERSARIAL DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
64 TERM_COND ADVERSARIAL TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
65 TERM_COND ADVERSARIAL ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
66 TERM_COND ADVERSARIAL TURBINE LP 2 Lifting gear if required will be charged at a rate of 400 per day.
67 TERM_COND ADVERSARIAL ROTARY LP 2 Lifting gear if required will be charged at a rate of 400 per day.
68 TERM_COND ADVERSARIAL ROTARY MP 1 Lifting gear if required will be charged at a rate of 400 per day.
69 TERM_COND ADVERSARIAL TURBINE MP 1 Lifting gear if required will be charged at a rate of 400 per day.
70 TERM_COND EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
71 TERM_COND EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
72 TERM_COND EXCHANGE DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
73 TERM_COND EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
74 TERM_COND EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
75 TERM_COND EXCHANGE DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
76 TERM_COND EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
77 TERM_COND EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
78 TERM_COND EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
79 TERM_COND EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
80 TERM_COND EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
81 TERM_COND EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
82 TERM_COND EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
83 TERM_COND EXCHANGE DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
84 TERM_COND EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
85 TERM_COND EXCHANGE ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
86 TERM_COND EXCHANGE TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
87 TERM_COND EXCHANGE DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
88 TERM_COND STD EXCHANGE EXCHANGE DIAPHRAGM MP LP 5 7 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
89 TERM_COND STD EXCHANGE EXCHANGE TURBINE MP LP 5 7 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
90 TERM_COND STD EXCHANGE EXCHANGE ROTARY MP LP 5 7 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
91 TERM_COND STD EXCHANGE EXCHANGE DIAPHRAGM MP LP 6 8 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
92 TERM_COND STD EXCHANGE EXCHANGE TURBINE MP LP 6 8 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
93 TERM_COND STD EXCHANGE EXCHANGE ROTARY MP LP 6 8 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
94 TERM_COND EXCHANGE TURBINE LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
95 TERM_COND EXCHANGE ROTARY LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
96 TERM_COND EXCHANGE DIAPHRAGM LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
97 TERM_COND EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
98 TERM_COND EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
99 TERM_COND EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
100 TERM_COND EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
101 TERM_COND EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
102 TERM_COND EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
103 TERM_COND EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
104 TERM_COND EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
105 TERM_COND EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
106 TERM_COND EXCHANGE TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
107 TERM_COND EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
108 TERM_COND EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
109 TERM_COND EXCHANGE ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
110 TERM_COND EXCHANGE DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
111 TERM_COND EXCHANGE TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
112 TERM_COND EXCHANGE ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
113 TERM_COND EXCHANGE TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
114 TERM_COND EXCHANGE DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
115 TERM_COND EXCHANGE ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
116 TERM_COND EXCHANGE TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
117 TERM_COND EXCHANGE DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
118 TERM_COND EXCHANGE DIAPHRAGM MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
119 TERM_COND EXCHANGE ROTARY MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
120 TERM_COND EXCHANGE TURBINE MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
121 TERM_COND EXCHANGE DIAPHRAGM MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
122 TERM_COND EXCHANGE ROTARY MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
123 TERM_COND EXCHANGE TURBINE MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
124 TERM_COND INSTALL ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
125 TERM_COND INSTALL DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
126 TERM_COND INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
127 TERM_COND INSTALL DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
128 TERM_COND INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
129 TERM_COND INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
130 TERM_COND INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
131 TERM_COND INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
132 TERM_COND INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
133 TERM_COND INSTALL DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
134 TERM_COND INSTALL TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
135 TERM_COND INSTALL ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
136 TERM_COND INSTALL ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
137 TERM_COND INSTALL TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
138 TERM_COND INSTALL DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
139 TERM_COND INSTALL DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
140 TERM_COND INSTALL ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
141 TERM_COND INSTALL TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
142 TERM_COND INSTALL TURBINE LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
143 TERM_COND INSTALL DIAPHRAGM LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
144 TERM_COND INSTALL ROTARY LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
145 TERM_COND INSTALL ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
146 TERM_COND INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
147 TERM_COND INSTALL DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
148 TERM_COND INSTALL DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
149 TERM_COND INSTALL TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
150 TERM_COND INSTALL ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
151 TERM_COND INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
152 TERM_COND INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
153 TERM_COND INSTALL DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
154 TERM_COND INSTALL TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
155 TERM_COND INSTALL ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
156 TERM_COND INSTALL DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
157 TERM_COND INSTALL ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
158 TERM_COND INSTALL DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
159 TERM_COND INSTALL TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
160 TERM_COND INSTALL DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
161 TERM_COND INSTALL ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
162 TERM_COND INSTALL TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
163 TERM_COND INSTALL TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
164 TERM_COND INSTALL ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
165 TERM_COND INSTALL DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
166 TERM_COND OFMAT DIAPHRAGM LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
167 TERM_COND OFMAT ROTARY LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
168 TERM_COND OFMAT TURBINE LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
169 TERM_COND OFMAT DIAPHRAGM MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
170 TERM_COND OFMAT ROTARY MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
171 TERM_COND OFMAT TURBINE MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
172 TERM_COND REMOVE ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
173 TERM_COND REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
174 TERM_COND REMOVE TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
175 TERM_COND REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
176 TERM_COND REMOVE ROTARY LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
177 TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
178 TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
179 TERM_COND REMOVE DIAPHRAGM MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
180 TERM_COND REMOVE ROTARY MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
181 TERM_COND REMOVE TURBINE MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
182 TERM_COND STD EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
183 TERM_COND STD EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
184 TERM_COND STD EXCHANGE DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
185 TERM_COND STD EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
186 TERM_COND STD EXCHANGE DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
187 TERM_COND STD EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
188 TERM_COND STD EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
189 TERM_COND STD EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
190 TERM_COND STD EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
191 TERM_COND STD EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
192 TERM_COND STD EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
193 TERM_COND STD EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
194 TERM_COND STD EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
195 TERM_COND STD EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
196 TERM_COND STD EXCHANGE DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
197 TERM_COND STD EXCHANGE TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
198 TERM_COND STD EXCHANGE ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
199 TERM_COND STD EXCHANGE DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
200 TERM_COND STD EXCHANGE TURBINE LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
201 TERM_COND STD EXCHANGE DIAPHRAGM LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
202 TERM_COND STD EXCHANGE ROTARY LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
203 TERM_COND STD EXCHANGE ROTARY LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
204 TERM_COND STD EXCHANGE TURBINE LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
205 TERM_COND STD EXCHANGE DIAPHRAGM LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
206 TERM_COND STD EXCHANGE ROTARY LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
207 TERM_COND STD EXCHANGE DIAPHRAGM LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
208 TERM_COND STD EXCHANGE TURBINE LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
209 TERM_COND STD EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
210 TERM_COND STD EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
211 TERM_COND STD EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
212 TERM_COND STD EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
213 TERM_COND STD EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
214 TERM_COND STD EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
215 TERM_COND STD EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
216 TERM_COND STD EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
217 TERM_COND STD EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
218 TERM_COND STD EXCHANGE TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
219 TERM_COND STD EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
220 TERM_COND STD EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
221 TERM_COND STD EXCHANGE DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
222 TERM_COND STD EXCHANGE TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
223 TERM_COND STD EXCHANGE ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
224 TERM_COND STD EXCHANGE DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
225 TERM_COND STD EXCHANGE TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
226 TERM_COND STD EXCHANGE ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
227 TERM_COND STD EXCHANGE ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
228 TERM_COND STD EXCHANGE DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
229 TERM_COND STD EXCHANGE TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
230 TERM_COND STD EXCHANGE DIAPHRAGM MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
231 TERM_COND STD EXCHANGE ROTARY MP 7 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
232 TERM_COND STD EXCHANGE DIAPHRAGM TURBINE MP 7 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
233 TERM_COND STD EXCHANGE TURBINE DIAPHRAGM MP 7 9 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
234 TERM_COND STD EXCHANGE DIAPHRAGM ROTARY MP 8 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
235 TERM_COND STD EXCHANGE ROTARY TURBINE MP 8 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
236 TERM_COND STD EXCHANGE STD INSTALL TURBINE DIAPHRAGM MP LP 8 1 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
237 TERM_COND STD EXCHANGE STD INSTALL DIAPHRAGM ROTARY MP LP 9 1 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
238 TERM_COND STD EXCHANGE STD INSTALL ROTARY TURBINE MP LP 9 1 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
239 TERM_COND STD EXCHANGE STD INSTALL TURBINE ROTARY MP LP 9 2 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
240 TERM_COND STD INSTALL DIAPHRAGM TURBINE LP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
241 TERM_COND STD INSTALL ROTARY DIAPHRAGM LP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
242 TERM_COND STD INSTALL TURBINE LP 1 3 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
243 TERM_COND STD INSTALL ROTARY LP 2 3 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
244 TERM_COND STD INSTALL TURBINE DIAPHRAGM LP 2 3 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
245 TERM_COND STD INSTALL DIAPHRAGM TURBINE LP 2 4 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
246 TERM_COND STD INSTALL TURBINE DIAPHRAGM LP 3 4 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
247 TERM_COND STD INSTALL ROTARY LP 3 4 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
248 TERM_COND STD INSTALL DIAPHRAGM ROTARY LP 3 5 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
249 TERM_COND STD INSTALL TURBINE LP 4 5 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
250 TERM_COND STD INSTALL DIAPHRAGM LP 4 5 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
251 TERM_COND STD INSTALL ROTARY LP 4 6 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
252 TERM_COND STD INSTALL ROTARY TURBINE LP 5 6 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
253 TERM_COND STD INSTALL TURBINE DIAPHRAGM LP 5 6 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
254 TERM_COND STD INSTALL DIAPHRAGM LP 5 7 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
255 TERM_COND STD INSTALL ROTARY LP 6 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
256 TERM_COND STD INSTALL TURBINE LP 6 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
257 TERM_COND STD INSTALL DIAPHRAGM TURBINE LP MP 6 1 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
258 TERM_COND STD INSTALL DIAPHRAGM ROTARY LP MP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
259 TERM_COND STD INSTALL ROTARY DIAPHRAGM LP MP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
260 TERM_COND STD INSTALL TURBINE LP MP 7 2 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
261 TERM_COND STD INSTALL TURBINE DIAPHRAGM MP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
262 TERM_COND STD INSTALL ROTARY MP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
263 TERM_COND STD INSTALL DIAPHRAGM ROTARY MP 1 3 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
264 TERM_COND STD INSTALL TURBINE MP 2 3 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
265 TERM_COND STD INSTALL DIAPHRAGM MP 2 3 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
266 TERM_COND STD INSTALL ROTARY DIAPHRAGM MP 2 4 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
267 TERM_COND STD INSTALL ROTARY TURBINE MP 3 4 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
268 TERM_COND STD INSTALL TURBINE ROTARY MP 3 4 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
269 TERM_COND STD INSTALL DIAPHRAGM TURBINE MP 3 5 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
270 TERM_COND STD INSTALL DIAPHRAGM ROTARY MP 4 5 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
271 TERM_COND STD INSTALL TURBINE DIAPHRAGM MP 4 5 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
272 TERM_COND STD INSTALL ROTARY DIAPHRAGM MP 4 6 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
273 TERM_COND STD INSTALL TURBINE ROTARY MP 5 6 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
274 TERM_COND STD INSTALL ROTARY TURBINE MP 5 6 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
275 TERM_COND STD INSTALL DIAPHRAGM TURBINE MP 5 7 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
276 TERM_COND STD INSTALL DIAPHRAGM MP 6 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
277 TERM_COND STD INSTALL ROTARY MP 6 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
278 TERM_COND STD INSTALL STD REMOVE TURBINE DIAPHRAGM MP LP 6 1 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
279 TERM_COND STD INSTALL STD REMOVE TURBINE DIAPHRAGM MP LP 7 2 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334

View File

@@ -1,295 +0,0 @@
"REGI_CODE","SELLING_PRICE","COST_PRICE","DELIVERY_COST","VALID_FROM","VALID_TO","COST_TYPE","ENTY_CODE","MESC_CODE","SVCPT_CODE","METY_CODE","MODU_CODE","METR_CODE","HOU_CODE","BAS_CODE","ADIT_CODE"
,43.1,,0,,,"MOCO",,,,,"AD016S",,,,
,43.1,,0,,,"MOCO",,,,,"AD016SW",,,,
,67.65,,0,,,"MOCO",,,,,"AD025S",,,,
,67.65,,0,,,"MOCO",,,,,"AD025SW",,,,
,86.32,,0,,,"MOCO",,,,,"AD040S",,,,
,370.57,,0,,,"MOCO",,,,,"AD065S",,,,
,419.27,,0,,,"MOCO",,,,,"AD100S",,,,
,501.35,,0,,,"MOCO",,,,,"AD160S",,,,
,207.94,,25,,,"MOCO",,,,,"ARCMVV0025A",,,,
,207.94,,25,,,"MOCO",,,,,"ARCMVV0025AW",,,,
,275.43,,25,,,"MOCO",,,,,"ARCMVV0040AW",,,,
,275.43,,25,,,"MOCO",,,,,"ARCMVV0040A",,,,
,629.9,,55,,,"MOCO",,,,,"ARCMHH0065A",,,,
,629.9,,55,,,"MOCO",,,,,"ARCMVV0065A",,,,
,629.9,,55,,,"MOCO",,,,,"ARCMVH0065A",,,,
,629.9,,55,,,"MOCO",,,,,"ARCMHV0065A",,,,
,629.9,,55,,,"MOCO",,,,,"ARCMHH0100A",,,,
,629.9,,55,,,"MOCO",,,,,"ARCMVV0100A",,,,
,629.9,,55,,,"MOCO",,,,,"ARCMVH0100A",,,,
,629.9,,55,,,"MOCO",,,,,"ARCMHV0100A",,,,
,868.74,,55,,,"MOCO",,,,,"ARCMVV0160A",,,,
,868.74,,55,,,"MOCO",,,,,"ARCMHH0160A",,,,
,868.74,,55,,,"MOCO",,,,,"ARCMVH0160A",,,,
,868.74,,55,,,"MOCO",,,,,"ARCMHV0160A",,,,
,868.74,,55,,,"MOCO",,,,,"ARCMVV0200A",,,,
,868.74,,55,,,"MOCO",,,,,"ARCMHH0200A",,,,
,868.74,,55,,,"MOCO",,,,,"ARCMVH0200A",,,,
,868.74,,55,,,"MOCO",,,,,"ARCMHV0200A",,,,
,868.74,,55,,,"MOCO",,,,,"ARCMVV0250A",,,,
,868.74,,55,,,"MOCO",,,,,"ARCMHH0250A",,,,
,868.74,,55,,,"MOCO",,,,,"ARCMVH0250A",,,,
,868.74,,55,,,"MOCO",,,,,"ARCMHV0250A",,,,
,1707.52,,55,,,"MOCO",,,,,"ARVV0250AP",,,,
,1707.52,,55,,,"MOCO",,,,,"ARHH0250AP",,,,
,1707.52,,55,,,"MOCO",,,,,"ARVH0250AP",,,,
,1707.52,,55,,,"MOCO",,,,,"ARHV0250AP",,,,
,1120.79,,55,,,"MOCO",,,,,"ARVV0300A",,,,
,1120.79,,55,,,"MOCO",,,,,"ARHH0300A",,,,
,1120.79,,55,,,"MOCO",,,,,"ARVH0300A",,,,
,1120.79,,55,,,"MOCO",,,,,"ARHV0300A",,,,
,2589.43,,90,,,"MOCO",,,,,"ARVV0300AP",,,,
,2589.43,,90,,,"MOCO",,,,,"ARHH0300AP",,,,
,2589.43,,90,,,"MOCO",,,,,"ARVH0300AP",,,,
,2589.43,,90,,,"MOCO",,,,,"ARHV0300AP",,,,
,1512.26,,55,,,"MOCO",,,,,"ARVV0400A",,,,
,1512.26,,55,,,"MOCO",,,,,"ARHH0400A",,,,
,1512.26,,55,,,"MOCO",,,,,"ARVH0400A",,,,
,1512.26,,55,,,"MOCO",,,,,"ARHV0400A",,,,
,1738.05,,90,,,"MOCO",,,,,"ARVV0650A",,,,
,1738.05,,90,,,"MOCO",,,,,"ARHH0650A",,,,
,1738.05,,90,,,"MOCO",,,,,"ARVH0650A",,,,
,1738.05,,90,,,"MOCO",,,,,"ARHV0650A",,,,
,3848.8,,500,,,"MOCO",,,,,"ARVV0650AP",,,,
,3848.8,,500,,,"MOCO",,,,,"ARHH0650AP",,,,
,3848.8,,500,,,"MOCO",,,,,"ARVH0650AP",,,,
,3848.8,,500,,,"MOCO",,,,,"ARHV0650AP",,,,
,1759.89,,90,,,"MOCO",,,,,"ARVV1000A",,,,
,1759.89,,90,,,"MOCO",,,,,"ARHH1000A",,,,
,1759.89,,90,,,"MOCO",,,,,"ARVH1000A",,,,
,1759.89,,90,,,"MOCO",,,,,"ARHV1000A",,,,
,4357.59,,500,,,"MOCO",,,,,"ARVV1000AP",,,,
,4357.59,,500,,,"MOCO",,,,,"ARHH1000AP",,,,
,4357.59,,500,,,"MOCO",,,,,"ARVH1000AP",,,,
,4357.59,,500,,,"MOCO",,,,,"ARHV1000AP",,,,
,323.14,,84,,,"MOCO",,,,,"ASD016A",,,,
,376.64,,84,,,"MOCO",,,,,"ASD025A",,,,
,531.62,,84,,,"MOCO",,,,,"ASD040A",,,,
,1009.01,,84,,,"MOCO",,,,,"ASD065A",,,,
,1437.89,,84,,,"MOCO",,,,,"ASD100A",,,,
,1459.65,,84,,,"MOCO",,,,,"ASD160A",,,,
,508.25,,84,,,"MOCO",,,,,"ASR0025A",,,,
,519.16,,84,,,"MOCO",,,,,"ASR0040A",,,,
,1455.88,,84,,,"MOCO",,,,,"ASR0100A",,,,
,1631.75,,84,,,"MOCO",,,,,"ASR0160A",,,,
,1872.86,,84,,,"MOCO",,,,,"ASR0200A",,,,
,2722.36,,84,,,"MOCO",,,,,"ASR0250A",,,,
,2958.96,,84,,,"MOCO",,,,,"ASR0300A",,,,
,3291.32,,84,,,"MOCO",,,,,"ASR0400A",,,,
,3504.74,,500,,,"MOCO",,,,,"ASR0650A",,,,
,4111.42,,500,,,"MOCO",,,,,"ASR1000A",,,,
,938.47,,70,,,"MOCO",,,,,"ASR0025D",,,,
,938.47,,70,,,"MOCO",,,,,"ASR0040D",,,,
,938.47,,70,,,"MOCO",,,,,"ASR0065D",,,,
,2383.9,,70,,,"MOCO",,,,,"ASR0100D",,,,
,2498.4,,70,,,"MOCO",,,,,"ASR0160D",,,,
,2800,,90,,,"MOCO",,,,,"ASR0250D",,,,
,2949.7,,90,,,"MOCO",,,,,"ASR0310D",,,,
,3170.8,,150,,,"MOCO",,,,,"ASR0450D",,,,
,3170.8,,150,,,"MOCO",,,,,"ASR0450DP",,,,
,4753.7,,190,,,"MOCO",,,,,"ASR0650D",,,,
,6263.9,,190,,,"MOCO",,,,,"ASR1075D",,,,
,7463.9,,250,,,"MOCO",,,,,"ASR1600D",,,,
,11450.4,,450,,,"MOCO",,,,,"ASR2885D",,,,
,,,0,,,"MOCO",,,,,"Meter Only (Notes)",,,,
,323.14,,84,,,"MOCO",,,,,"ASD016AW",,,,
,441.57,,,,,"MECO",,,,,,"MRA25A",,,
,490.19,,,,,"MECO",,,,,,"MRA40A",,,
,635.51,,,,,"MECO",,,,,,"MRA65B",,,
,635.51,,,,,"MECO",,,,,,"MRA100B",,,
,786.11,,,,,"MECO",,,,,,"MRA160C",,,
,1062.35,,,,,"MECO",,,,,,"MRA200C",,,
,1117.65,,,,,"MECO",,,,,,"MRA250C",,,
,1177.37,,,,,"MECO",,,,,,"MRA300D",,,
,1258.72,,,,,"MECO",,,,,,"MRA400D",,,
,3216.29,,,,,"MECO",,,,,,"MRA650E",,,
,3788.23,,,,,"MECO",,,,,,"MRA1000E",,,
,0,,0,,,"MECO",,,,,,"MRD0025B4B",,,
,0,,0,,,"MECO",,,,,,"MRD0040B4B",,,
,0,,0,,,"MECO",,,,,,"MRD0065B4B",,,
,0,,0,,,"MECO",,,,,,"MRD0100B4B",,,
,0,,0,,,"MECO",,,,,,"MRD0160B4C",,,
,0,,0,,,"MECO",,,,,,"MRD0250B4D",,,
,0,,0,,,"MECO",,,,,,"MRD0310B4D",,,
,0,,0,,,"MECO",,,,,,"MRD0450B4D",,,
,0,,0,,,"MECO",,,,,,"MRD0650B4E",,,
,0,,0,,,"MECO",,,,,,"MRD1075B4E",,,
,0,,0,,,"MECO",,,,,,"MRD2885A",,,
,0,,0,,,"MECO",,,,,,"MDA16",,,
,0,,0,,,"MECO",,,,,,"MDA25",,,
,0,,0,,,"MECO",,,,,,"MDA40",,,
,0,,0,,,"MECO",,,,,,"MDA65",,,
,0,,0,,,"MECO",,,,,,"MDA100",,,
,0,,0,,,"MECO",,,,,,"MDA160",,,
,0,,0,,,"MECO",,,,,,"MRD1600B4F",,,
,0,,0,,,"MECO",,,,,,"MRA1000SE",,,
,0,,0,,,"MECO",,,,,,"MRA1000+",,,
,0,,0,,,"MECO",,,,,,"MRA650SE",,,
,0,,0,,,"MECO",,,,,,"MRD2885A10",,,
,199.5,185,14.5,,,"HOCO",,,,,,,"GC2",,
,244.5,220,15.5,,,"HOCO",,,,,,,"GC2FS",,
,251.75,235,14.5,,,"HOCO",,,,,,,"GC2MP",,
,301.36,270,14.5,,,"HOCO",,,,,,,"GC3",,
,316.5,295,21.5,,,"HOCO",,,,,,,"GC4",,
,532,495,37,,,"HOCO",,,,,,,"GC4+",,
,627,585,42,,,"HOCO",,,,,,,"GC5",,
,713.46,665,58,,,"HOCO",,,,,,,"GC6",,
,903,830,73,,,"HOCO",,,,,,,"GC7",,
,1040.5,965,75.5,,,"HOCO",,,,,,,"GC7+",,
,2185,1990,195,,,"HOCO",,,,,,,"GC8",,
,244.5,254,0,,,"HOCO",,,,,,,"Gas Cab No 2 (Multi)",,
,301.36,299,0,,,"HOCO",,,,,,,"Gas Cab No 4",,
,713.46,699,0,,,"HOCO",,,,,,,"Gas Cab No 6",,
,0,2760,0,,,"HOCO",,,,,,,"Custom1",,
,0,3071,0,,,"HOCO",,,,,,,"Custom2",,
,0,3191,0,,,"HOCO",,,,,,,"Custom3",,
,0,2959,0,,,"HOCO",,,,,,,"Custom4",,
,0,3268,0,,,"HOCO",,,,,,,"Custom5",,
,0,3850,0,,,"HOCO",,,,,,,"Custom6",,
,0,0,0,,,"HOCO",,,,,,,"CustomK",,
,2519,2519,0,,,"HOCO",,,,,,,"KP1",,
,2725,2725,0,,,"HOCO",,,,,,,"KP2",,
,2879,2879,0,,,"HOCO",,,,,,,"KP3",,
,3416,3416,0,,,"HOCO",,,,,,,"KP4",,
,3503,3503,0,,,"HOCO",,,,,,,"KP5",,
,188.91,254,0,,,"HOCO",,,,,,,"Gas Cab No 2BB",,
,301.36,299,0,,,"HOCO",,,,,,,"Gas Cab No 4BB25",,
,310.99,299,0,,,"HOCO",,,,,,,"Gas Cab No 4BB40",,
,713.46,699,0,,,"HOCO",,,,,,,"Gas Cab No 6BB",,
,188.91,220,15.5,,,"HOCO",,,,,,,"GC2FSBB",,
,301.36,270,14.5,,,"HOCO",,,,,,,"GC3BB",,
,301.36,295,21.5,,,"HOCO",,,,,,,"GC4BB25",,
,310.99,295,21.5,,,"HOCO",,,,,,,"GC4BB40",,
,689.19,585,42,,,"HOCO",,,,,,,"GC5BB",,
,713.46,665,58,,,"HOCO",,,,,,,"GC6BB",,
,188.91,185,14.5,,,"HOCO",,,,,,,"GC2BB",,
,251.75,254,0,,,"HOCO",,,,,,,"Gas Cab No 2MP",,
,0,,,,,"BACO",,,,,,,,"0",
,0,,,,,"BACO",,,,,,,,"CustomB",
,625,,,,,"BACO",,,,,,,,"RA0025LPB",
,625,,,,,"BACO",,,,,,,,"RA0025MPB",
,625,,,,,"BACO",,,,,,,,"RA0040LPB",
,625,,,,,"BACO",,,,,,,,"RA0040MPB",
,1025,,,,,"BACO",,,,,,,,"RA0065LPB",
,1025,,,,,"BACO",,,,,,,,"RA0100LPB",
,625,,,,,"BACO",,,,,,,,"RA0100MPB",
,1025,,,,,"BACO",,,,,,,,"RA0160LPB",
,625,,,,,"BACO",,,,,,,,"RA0160MPB",
,1025,,,,,"BACO",,,,,,,,"RA0200LPB",
,625,,,,,"BACO",,,,,,,,"RA0200MPB",
,1025,,,,,"BACO",,,,,,,,"RA0250+LPB",
,1025,,,,,"BACO",,,,,,,,"RA0250LPB",
,1025,,,,,"BACO",,,,,,,,"RA0250MPB",
,1275,,,,,"BACO",,,,,,,,"RA0300+LPB",
,1025,,,,,"BACO",,,,,,,,"RA0300LPB",
,1025,,,,,"BACO",,,,,,,,"RA0300MPB",
,1275,,,,,"BACO",,,,,,,,"RA0400LPB",
,1025,,,,,"BACO",,,,,,,,"RA0400MPB",
,1425,,,,,"BACO",,,,,,,,"RA0650+LPB",
,1275,,,,,"BACO",,,,,,,,"RA0650LPB",
,1275,,,,,"BACO",,,,,,,,"RA0650MPB",
,1425,,,,,"BACO",,,,,,,,"RA1000+LPB",
,1275,,,,,"BACO",,,,,,,,"RA1000LPB",
,1275,,,,,"BACO",,,,,,,,"RA1000MPB",
,625,,,,,"BACO",,,,,,,,"RD0025MPB",
,625,,,,,"BACO",,,,,,,,"RD0040MPB",
,625,,,,,"BACO",,,,,,,,"RD0065MPB",
,625,,,,,"BACO",,,,,,,,"RD0100MPB",
,0,,,,,"BACO",,,,,,,,"RD0160MPB",
,1025,,,,,"BACO",,,,,,,,"RD0250MPB",
,1025,,,,,"BACO",,,,,,,,"RD0310MPB",
,1025,,,,,"BACO",,,,,,,,"RD0450+MPB",
,1025,,,,,"BACO",,,,,,,,"RD0450MPB",
,1275,,,,,"BACO",,,,,,,,"RD0650MPB",
,1275,,,,,"BACO",,,,,,,,"RD1075MPB",
,1275,,,,,"BACO",,,,,,,,"RD1600MPB",
,0,,,,,"BACO",,,,,,,,"RD2885MPB",
,625,,,,,"BACO",,,,,,,,"U016LPB",
,625,,,,,"BACO",,,,,,,,"U016MPB",
,625,,,,,"BACO",,,,,,,,"U025LPB",
,625,,,,,"BACO",,,,,,,,"U025MPB",
,625,,,,,"BACO",,,,,,,,"U040LPB",
,625,,,,,"BACO",,,,,,,,"U040MPB",
,625,,,,,"BACO",,,,,,,,"U065LPB",
,1025,,,,,"BACO",,,,,,,,"U065MPB",
,1025,,,,,"BACO",,,,,,,,"U100LPB",
,1025,,,,,"BACO",,,,,,,,"U100MPB",
,1025,,,,,"BACO",,,,,,,,"U160LPB",
,1025,,,,,"BACO",,,,,,,,"U160MPB",
,999,,,,,"AICO",,,,,,,,,"AMR"
,999,,,,,"AICO",,,,,,,,,"EMS"
,220,,,,,"AICO",,,,,,,,,"LIFTING GEAR"
,0,,,,,"AICO",,,,,,,,,"PURGING"
,999.01,,,,,"LACO","ADDON",,"LP","DIAPHRAGM",,,,,
,999.02,,,,,"LACO","ADVERSARIAL",,"LP","DIAPHRAGM",,,,,
,999.03,,,,,"LACO","CHANGE CAPACITY",,"LP","DIAPHRAGM",,,,,
,999.04,,,,,"LACO","EXCHANGE",,"LP","DIAPHRAGM",,,,,
,999.05,,,,,"LACO","INSTALL",,"LP","DIAPHRAGM",,,,,
,999.06,,,,,"LACO","OFMAT",,"LP","DIAPHRAGM",,,,,
,999.07,,,,,"LACO","OTHER",,"LP","DIAPHRAGM",,,,,
,999.08,,,,,"LACO","ALTERATION",,"LP","DIAPHRAGM",,,,,
,999.09,,,,,"LACO","REMOVE",,"LP","DIAPHRAGM",,,,,
,999.1,,,,,"LACO","STD EXCHANGE",,"LP","DIAPHRAGM",,,,,
,999.11,,,,,"LACO","STD INSTALL",,"LP","DIAPHRAGM",,,,,
,999.12,,,,,"LACO","STD REMOVE",,"LP","DIAPHRAGM",,,,,
,999.01,,,,,"LACO","ADDON",,"MP","DIAPHRAGM",,,,,
,999.02,,,,,"LACO","ADVERSARIAL",,"MP","DIAPHRAGM",,,,,
,999.03,,,,,"LACO","CHANGE CAPACITY",,"MP","DIAPHRAGM",,,,,
,999.04,,,,,"LACO","EXCHANGE",,"MP","DIAPHRAGM",,,,,
,999.05,,,,,"LACO","INSTALL",,"MP","DIAPHRAGM",,,,,
,999.06,,,,,"LACO","OFMAT",,"MP","DIAPHRAGM",,,,,
,999.07,,,,,"LACO","OTHER",,"MP","DIAPHRAGM",,,,,
,999.08,,,,,"LACO","ALTERATION",,"MP","DIAPHRAGM",,,,,
,999.09,,,,,"LACO","REMOVE",,"MP","DIAPHRAGM",,,,,
,999.1,,,,,"LACO","STD EXCHANGE",,"MP","DIAPHRAGM",,,,,
,999.11,,,,,"LACO","STD INSTALL",,"MP","DIAPHRAGM",,,,,
,999.12,,,,,"LACO","STD REMOVE",,"MP","DIAPHRAGM",,,,,
,999.01,,,,,"LACO","ADDON",,"HP","DIAPHRAGM",,,,,
,999.02,,,,,"LACO","ADVERSARIAL",,"HP","DIAPHRAGM",,,,,
,999.03,,,,,"LACO","CHANGE CAPACITY",,"HP","DIAPHRAGM",,,,,
,999.04,,,,,"LACO","EXCHANGE",,"HP","DIAPHRAGM",,,,,
,999.05,,,,,"LACO","INSTALL",,"HP","DIAPHRAGM",,,,,
,999.06,,,,,"LACO","OFMAT",,"HP","DIAPHRAGM",,,,,
,999.07,,,,,"LACO","OTHER",,"HP","DIAPHRAGM",,,,,
,999.08,,,,,"LACO","ALTERATION",,"HP","DIAPHRAGM",,,,,
,999.09,,,,,"LACO","REMOVE",,"HP","DIAPHRAGM",,,,,
,999.1,,,,,"LACO","STD EXCHANGE",,"HP","DIAPHRAGM",,,,,
,999.11,,,,,"LACO","STD INSTALL",,"HP","DIAPHRAGM",,,,,
,999.12,,,,,"LACO","STD REMOVE",,"HP","DIAPHRAGM",,,,,
,999.01,,,,,"LACO","ADDON",,"LP","ROTARY",,,,,
,999.02,,,,,"LACO","ADVERSARIAL",,"LP","ROTARY",,,,,
,999.03,,,,,"LACO","CHANGE CAPACITY",,"LP","ROTARY",,,,,
,999.04,,,,,"LACO","EXCHANGE",,"LP","ROTARY",,,,,
,999.05,,,,,"LACO","INSTALL",,"LP","ROTARY",,,,,
,999.06,,,,,"LACO","OFMAT",,"LP","ROTARY",,,,,
,999.07,,,,,"LACO","OTHER",,"LP","ROTARY",,,,,
,999.08,,,,,"LACO","ALTERATION",,"LP","ROTARY",,,,,
,999.09,,,,,"LACO","REMOVE",,"LP","ROTARY",,,,,
,999.1,,,,,"LACO","STD EXCHANGE",,"LP","ROTARY",,,,,
,999.11,,,,,"LACO","STD INSTALL",,"LP","ROTARY",,,,,
,999.12,,,,,"LACO","STD REMOVE",,"LP","ROTARY",,,,,
,999.01,,,,,"LACO","ADDON",,"MP","ROTARY",,,,,
,999.02,,,,,"LACO","ADVERSARIAL",,"MP","ROTARY",,,,,
,999.03,,,,,"LACO","CHANGE CAPACITY",,"MP","ROTARY",,,,,
,999.04,,,,,"LACO","EXCHANGE",,"MP","ROTARY",,,,,
,999.05,,,,,"LACO","INSTALL",,"MP","ROTARY",,,,,
,999.06,,,,,"LACO","OFMAT",,"MP","ROTARY",,,,,
,999.07,,,,,"LACO","OTHER",,"MP","ROTARY",,,,,
,999.08,,,,,"LACO","ALTERATION",,"MP","ROTARY",,,,,
,999.09,,,,,"LACO","REMOVE",,"MP","ROTARY",,,,,
,999.1,,,,,"LACO","STD EXCHANGE",,"MP","ROTARY",,,,,
,999.11,,,,,"LACO","STD INSTALL",,"MP","ROTARY",,,,,
,999.12,,,,,"LACO","STD REMOVE",,"MP","ROTARY",,,,,
,999.01,,,,,"LACO","ADDON",,"HP","ROTARY",,,,,
,999.02,,,,,"LACO","ADVERSARIAL",,"HP","ROTARY",,,,,
,999.03,,,,,"LACO","CHANGE CAPACITY",,"HP","ROTARY",,,,,
,999.04,,,,,"LACO","EXCHANGE",,"HP","ROTARY",,,,,
,999.05,,,,,"LACO","INSTALL",,"HP","ROTARY",,,,,
,999.06,,,,,"LACO","OFMAT",,"HP","ROTARY",,,,,
,999.07,,,,,"LACO","OTHER",,"HP","ROTARY",,,,,
,999.08,,,,,"LACO","ALTERATION",,"HP","ROTARY",,,,,
,999.09,,,,,"LACO","REMOVE",,"HP","ROTARY",,,,,
,999.1,,,,,"LACO","STD EXCHANGE",,"HP","ROTARY",,,,,
,999.11,,,,,"LACO","STD INSTALL",,"HP","ROTARY",,,,,
,999.12,,,,,"LACO","STD REMOVE",,"HP","ROTARY",,,,,
1 REGI_CODE SELLING_PRICE COST_PRICE DELIVERY_COST VALID_FROM VALID_TO COST_TYPE ENTY_CODE MESC_CODE SVCPT_CODE METY_CODE MODU_CODE METR_CODE HOU_CODE BAS_CODE ADIT_CODE
2 43.1 0 MOCO AD016S
3 43.1 0 MOCO AD016SW
4 67.65 0 MOCO AD025S
5 67.65 0 MOCO AD025SW
6 86.32 0 MOCO AD040S
7 370.57 0 MOCO AD065S
8 419.27 0 MOCO AD100S
9 501.35 0 MOCO AD160S
10 207.94 25 MOCO ARCMVV0025A
11 207.94 25 MOCO ARCMVV0025AW
12 275.43 25 MOCO ARCMVV0040AW
13 275.43 25 MOCO ARCMVV0040A
14 629.9 55 MOCO ARCMHH0065A
15 629.9 55 MOCO ARCMVV0065A
16 629.9 55 MOCO ARCMVH0065A
17 629.9 55 MOCO ARCMHV0065A
18 629.9 55 MOCO ARCMHH0100A
19 629.9 55 MOCO ARCMVV0100A
20 629.9 55 MOCO ARCMVH0100A
21 629.9 55 MOCO ARCMHV0100A
22 868.74 55 MOCO ARCMVV0160A
23 868.74 55 MOCO ARCMHH0160A
24 868.74 55 MOCO ARCMVH0160A
25 868.74 55 MOCO ARCMHV0160A
26 868.74 55 MOCO ARCMVV0200A
27 868.74 55 MOCO ARCMHH0200A
28 868.74 55 MOCO ARCMVH0200A
29 868.74 55 MOCO ARCMHV0200A
30 868.74 55 MOCO ARCMVV0250A
31 868.74 55 MOCO ARCMHH0250A
32 868.74 55 MOCO ARCMVH0250A
33 868.74 55 MOCO ARCMHV0250A
34 1707.52 55 MOCO ARVV0250AP
35 1707.52 55 MOCO ARHH0250AP
36 1707.52 55 MOCO ARVH0250AP
37 1707.52 55 MOCO ARHV0250AP
38 1120.79 55 MOCO ARVV0300A
39 1120.79 55 MOCO ARHH0300A
40 1120.79 55 MOCO ARVH0300A
41 1120.79 55 MOCO ARHV0300A
42 2589.43 90 MOCO ARVV0300AP
43 2589.43 90 MOCO ARHH0300AP
44 2589.43 90 MOCO ARVH0300AP
45 2589.43 90 MOCO ARHV0300AP
46 1512.26 55 MOCO ARVV0400A
47 1512.26 55 MOCO ARHH0400A
48 1512.26 55 MOCO ARVH0400A
49 1512.26 55 MOCO ARHV0400A
50 1738.05 90 MOCO ARVV0650A
51 1738.05 90 MOCO ARHH0650A
52 1738.05 90 MOCO ARVH0650A
53 1738.05 90 MOCO ARHV0650A
54 3848.8 500 MOCO ARVV0650AP
55 3848.8 500 MOCO ARHH0650AP
56 3848.8 500 MOCO ARVH0650AP
57 3848.8 500 MOCO ARHV0650AP
58 1759.89 90 MOCO ARVV1000A
59 1759.89 90 MOCO ARHH1000A
60 1759.89 90 MOCO ARVH1000A
61 1759.89 90 MOCO ARHV1000A
62 4357.59 500 MOCO ARVV1000AP
63 4357.59 500 MOCO ARHH1000AP
64 4357.59 500 MOCO ARVH1000AP
65 4357.59 500 MOCO ARHV1000AP
66 323.14 84 MOCO ASD016A
67 376.64 84 MOCO ASD025A
68 531.62 84 MOCO ASD040A
69 1009.01 84 MOCO ASD065A
70 1437.89 84 MOCO ASD100A
71 1459.65 84 MOCO ASD160A
72 508.25 84 MOCO ASR0025A
73 519.16 84 MOCO ASR0040A
74 1455.88 84 MOCO ASR0100A
75 1631.75 84 MOCO ASR0160A
76 1872.86 84 MOCO ASR0200A
77 2722.36 84 MOCO ASR0250A
78 2958.96 84 MOCO ASR0300A
79 3291.32 84 MOCO ASR0400A
80 3504.74 500 MOCO ASR0650A
81 4111.42 500 MOCO ASR1000A
82 938.47 70 MOCO ASR0025D
83 938.47 70 MOCO ASR0040D
84 938.47 70 MOCO ASR0065D
85 2383.9 70 MOCO ASR0100D
86 2498.4 70 MOCO ASR0160D
87 2800 90 MOCO ASR0250D
88 2949.7 90 MOCO ASR0310D
89 3170.8 150 MOCO ASR0450D
90 3170.8 150 MOCO ASR0450DP
91 4753.7 190 MOCO ASR0650D
92 6263.9 190 MOCO ASR1075D
93 7463.9 250 MOCO ASR1600D
94 11450.4 450 MOCO ASR2885D
95 0 MOCO Meter Only (Notes)
96 323.14 84 MOCO ASD016AW
97 441.57 MECO MRA25A
98 490.19 MECO MRA40A
99 635.51 MECO MRA65B
100 635.51 MECO MRA100B
101 786.11 MECO MRA160C
102 1062.35 MECO MRA200C
103 1117.65 MECO MRA250C
104 1177.37 MECO MRA300D
105 1258.72 MECO MRA400D
106 3216.29 MECO MRA650E
107 3788.23 MECO MRA1000E
108 0 0 MECO MRD0025B4B
109 0 0 MECO MRD0040B4B
110 0 0 MECO MRD0065B4B
111 0 0 MECO MRD0100B4B
112 0 0 MECO MRD0160B4C
113 0 0 MECO MRD0250B4D
114 0 0 MECO MRD0310B4D
115 0 0 MECO MRD0450B4D
116 0 0 MECO MRD0650B4E
117 0 0 MECO MRD1075B4E
118 0 0 MECO MRD2885A
119 0 0 MECO MDA16
120 0 0 MECO MDA25
121 0 0 MECO MDA40
122 0 0 MECO MDA65
123 0 0 MECO MDA100
124 0 0 MECO MDA160
125 0 0 MECO MRD1600B4F
126 0 0 MECO MRA1000SE
127 0 0 MECO MRA1000+
128 0 0 MECO MRA650SE
129 0 0 MECO MRD2885A10
130 199.5 185 14.5 HOCO GC2
131 244.5 220 15.5 HOCO GC2FS
132 251.75 235 14.5 HOCO GC2MP
133 301.36 270 14.5 HOCO GC3
134 316.5 295 21.5 HOCO GC4
135 532 495 37 HOCO GC4+
136 627 585 42 HOCO GC5
137 713.46 665 58 HOCO GC6
138 903 830 73 HOCO GC7
139 1040.5 965 75.5 HOCO GC7+
140 2185 1990 195 HOCO GC8
141 244.5 254 0 HOCO Gas Cab No 2 (Multi)
142 301.36 299 0 HOCO Gas Cab No 4
143 713.46 699 0 HOCO Gas Cab No 6
144 0 2760 0 HOCO Custom1
145 0 3071 0 HOCO Custom2
146 0 3191 0 HOCO Custom3
147 0 2959 0 HOCO Custom4
148 0 3268 0 HOCO Custom5
149 0 3850 0 HOCO Custom6
150 0 0 0 HOCO CustomK
151 2519 2519 0 HOCO KP1
152 2725 2725 0 HOCO KP2
153 2879 2879 0 HOCO KP3
154 3416 3416 0 HOCO KP4
155 3503 3503 0 HOCO KP5
156 188.91 254 0 HOCO Gas Cab No 2BB
157 301.36 299 0 HOCO Gas Cab No 4BB25
158 310.99 299 0 HOCO Gas Cab No 4BB40
159 713.46 699 0 HOCO Gas Cab No 6BB
160 188.91 220 15.5 HOCO GC2FSBB
161 301.36 270 14.5 HOCO GC3BB
162 301.36 295 21.5 HOCO GC4BB25
163 310.99 295 21.5 HOCO GC4BB40
164 689.19 585 42 HOCO GC5BB
165 713.46 665 58 HOCO GC6BB
166 188.91 185 14.5 HOCO GC2BB
167 251.75 254 0 HOCO Gas Cab No 2MP
168 0 BACO 0
169 0 BACO CustomB
170 625 BACO RA0025LPB
171 625 BACO RA0025MPB
172 625 BACO RA0040LPB
173 625 BACO RA0040MPB
174 1025 BACO RA0065LPB
175 1025 BACO RA0100LPB
176 625 BACO RA0100MPB
177 1025 BACO RA0160LPB
178 625 BACO RA0160MPB
179 1025 BACO RA0200LPB
180 625 BACO RA0200MPB
181 1025 BACO RA0250+LPB
182 1025 BACO RA0250LPB
183 1025 BACO RA0250MPB
184 1275 BACO RA0300+LPB
185 1025 BACO RA0300LPB
186 1025 BACO RA0300MPB
187 1275 BACO RA0400LPB
188 1025 BACO RA0400MPB
189 1425 BACO RA0650+LPB
190 1275 BACO RA0650LPB
191 1275 BACO RA0650MPB
192 1425 BACO RA1000+LPB
193 1275 BACO RA1000LPB
194 1275 BACO RA1000MPB
195 625 BACO RD0025MPB
196 625 BACO RD0040MPB
197 625 BACO RD0065MPB
198 625 BACO RD0100MPB
199 0 BACO RD0160MPB
200 1025 BACO RD0250MPB
201 1025 BACO RD0310MPB
202 1025 BACO RD0450+MPB
203 1025 BACO RD0450MPB
204 1275 BACO RD0650MPB
205 1275 BACO RD1075MPB
206 1275 BACO RD1600MPB
207 0 BACO RD2885MPB
208 625 BACO U016LPB
209 625 BACO U016MPB
210 625 BACO U025LPB
211 625 BACO U025MPB
212 625 BACO U040LPB
213 625 BACO U040MPB
214 625 BACO U065LPB
215 1025 BACO U065MPB
216 1025 BACO U100LPB
217 1025 BACO U100MPB
218 1025 BACO U160LPB
219 1025 BACO U160MPB
220 999 AICO AMR
221 999 AICO EMS
222 220 AICO LIFTING GEAR
223 0 AICO PURGING
224 999.01 LACO ADDON LP DIAPHRAGM
225 999.02 LACO ADVERSARIAL LP DIAPHRAGM
226 999.03 LACO CHANGE CAPACITY LP DIAPHRAGM
227 999.04 LACO EXCHANGE LP DIAPHRAGM
228 999.05 LACO INSTALL LP DIAPHRAGM
229 999.06 LACO OFMAT LP DIAPHRAGM
230 999.07 LACO OTHER LP DIAPHRAGM
231 999.08 LACO ALTERATION LP DIAPHRAGM
232 999.09 LACO REMOVE LP DIAPHRAGM
233 999.1 LACO STD EXCHANGE LP DIAPHRAGM
234 999.11 LACO STD INSTALL LP DIAPHRAGM
235 999.12 LACO STD REMOVE LP DIAPHRAGM
236 999.01 LACO ADDON MP DIAPHRAGM
237 999.02 LACO ADVERSARIAL MP DIAPHRAGM
238 999.03 LACO CHANGE CAPACITY MP DIAPHRAGM
239 999.04 LACO EXCHANGE MP DIAPHRAGM
240 999.05 LACO INSTALL MP DIAPHRAGM
241 999.06 LACO OFMAT MP DIAPHRAGM
242 999.07 LACO OTHER MP DIAPHRAGM
243 999.08 LACO ALTERATION MP DIAPHRAGM
244 999.09 LACO REMOVE MP DIAPHRAGM
245 999.1 LACO STD EXCHANGE MP DIAPHRAGM
246 999.11 LACO STD INSTALL MP DIAPHRAGM
247 999.12 LACO STD REMOVE MP DIAPHRAGM
248 999.01 LACO ADDON HP DIAPHRAGM
249 999.02 LACO ADVERSARIAL HP DIAPHRAGM
250 999.03 LACO CHANGE CAPACITY HP DIAPHRAGM
251 999.04 LACO EXCHANGE HP DIAPHRAGM
252 999.05 LACO INSTALL HP DIAPHRAGM
253 999.06 LACO OFMAT HP DIAPHRAGM
254 999.07 LACO OTHER HP DIAPHRAGM
255 999.08 LACO ALTERATION HP DIAPHRAGM
256 999.09 LACO REMOVE HP DIAPHRAGM
257 999.1 LACO STD EXCHANGE HP DIAPHRAGM
258 999.11 LACO STD INSTALL HP DIAPHRAGM
259 999.12 LACO STD REMOVE HP DIAPHRAGM
260 999.01 LACO ADDON LP ROTARY
261 999.02 LACO ADVERSARIAL LP ROTARY
262 999.03 LACO CHANGE CAPACITY LP ROTARY
263 999.04 LACO EXCHANGE LP ROTARY
264 999.05 LACO INSTALL LP ROTARY
265 999.06 LACO OFMAT LP ROTARY
266 999.07 LACO OTHER LP ROTARY
267 999.08 LACO ALTERATION LP ROTARY
268 999.09 LACO REMOVE LP ROTARY
269 999.1 LACO STD EXCHANGE LP ROTARY
270 999.11 LACO STD INSTALL LP ROTARY
271 999.12 LACO STD REMOVE LP ROTARY
272 999.01 LACO ADDON MP ROTARY
273 999.02 LACO ADVERSARIAL MP ROTARY
274 999.03 LACO CHANGE CAPACITY MP ROTARY
275 999.04 LACO EXCHANGE MP ROTARY
276 999.05 LACO INSTALL MP ROTARY
277 999.06 LACO OFMAT MP ROTARY
278 999.07 LACO OTHER MP ROTARY
279 999.08 LACO ALTERATION MP ROTARY
280 999.09 LACO REMOVE MP ROTARY
281 999.1 LACO STD EXCHANGE MP ROTARY
282 999.11 LACO STD INSTALL MP ROTARY
283 999.12 LACO STD REMOVE MP ROTARY
284 999.01 LACO ADDON HP ROTARY
285 999.02 LACO ADVERSARIAL HP ROTARY
286 999.03 LACO CHANGE CAPACITY HP ROTARY
287 999.04 LACO EXCHANGE HP ROTARY
288 999.05 LACO INSTALL HP ROTARY
289 999.06 LACO OFMAT HP ROTARY
290 999.07 LACO OTHER HP ROTARY
291 999.08 LACO ALTERATION HP ROTARY
292 999.09 LACO REMOVE HP ROTARY
293 999.1 LACO STD EXCHANGE HP ROTARY
294 999.11 LACO STD INSTALL HP ROTARY
295 999.12 LACO STD REMOVE HP ROTARY

View File

@@ -19,7 +19,6 @@
"Custom4","Kingsley","WT","Walk Thru",,1750,2250,3500,626
"Custom5","Kingsley","WT","Walk Thru",,2000,2250,4000,731
"Custom6","Kingsley","WT","Walk Thru",,2750,2250,4500,925
"CustomK","Kingsley","WT","Walk Thru",,0,0,0,0
"KP1","Kingsley","WT","Walk Thru",,1600,2250,2500,529
"KP2","Kingsley","WT","Walk Thru",,1600,2250,3000,599
"KP3","Kingsley","WT","Walk Thru",,1600,2250,3500,664
1 CODE MANU_REF DRWG_CODE HOTY_CODE DESCRIPTION DIM_W DIM_H DIM_L WEIGHT
19 Custom4 Kingsley WT Walk Thru 1750 2250 3500 626
20 Custom5 Kingsley WT Walk Thru 2000 2250 4000 731
21 Custom6 Kingsley WT Walk Thru 2750 2250 4500 925
CustomK Kingsley WT Walk Thru 0 0 0 0
22 KP1 Kingsley WT Walk Thru 1600 2250 2500 529
23 KP2 Kingsley WT Walk Thru 1600 2250 3000 599
24 KP3 Kingsley WT Walk Thru 1600 2250 3500 664

View File

@@ -1,5 +1,5 @@
|||||||||||||
NETWK01|NETWK02|NETWK03|NETWK04|NETWK05|NETWK06|NETWK07|NETWK08||||||
SC001 - Scotland|NTH01 - North|STH01 - South|WWE01 - Wales and West|RDN01 - North London|RDN01 - West Midlands|RDN01 - North West|RDN01 - East||||||
NETW01|NETW02|NETW03|NETW04|NETW05|NETW06|NETW07|NETW08||||||
SELLING_PRICE|SELLING_PRICE|SELLING PRICE|SELLING PRICE|SELLING PRICE|SELLING PRICE|SELLING PRICE|SELLING PRICE|VALID_FROM|VALID_TO|ENTY_CODE|MESC_CODE|SVCPT_CODE|METY_CODE
79.42|79.42|79.42|71.85|112.79|112.79|113.33|127|||INSTALL|U16|LP|DIAPHRAGM
79.42|79.42|79.42|71.85|112.79|112.79|113.33|127|||INSTALL|U17|LP|DIAPHRAGM
1 SC001 - Scotland NTH01 - North STH01 - South WWE01 - Wales and West RDN01 - North London RDN01 - West Midlands RDN01 - North West RDN01 - East
2 NETW01 NETW02 NETW03 NETW04 NETW05 NETW06 NETWK07 NETW07 NETWK08 NETW08 NETWK01 NETWK02 NETWK03 NETWK04 NETWK05 NETWK06
3 SELLING_PRICE SELLING_PRICE SELLING PRICE SELLING PRICE SELLING PRICE SELLING PRICE SELLING PRICE SELLING PRICE VALID_FROM SELLING_PRICE VALID_FROM VALID_TO SELLING_PRICE VALID_TO ENTY_CODE SELLING PRICE ENTY_CODE MESC_CODE SELLING PRICE MESC_CODE SVCPT_CODE SELLING PRICE SVCPT_CODE METY_CODE SELLING PRICE METY_CODE
4 79.42 79.42 79.42 71.85 112.79 112.79 113.33 127 79.42 79.42 INSTALL 79.42 INSTALL U16 71.85 U16 LP 112.79 LP DIAPHRAGM 112.79 DIAPHRAGM
5 79.42 79.42 79.42 71.85 112.79 112.79 113.33 127 79.42 79.42 INSTALL 79.42 INSTALL U17 71.85 U17 LP 112.79 LP DIAPHRAGM 112.79 DIAPHRAGM

View File

@@ -1,189 +1,189 @@
|||||||||
SELLING_PRICE|COST_PRICE|DELIVERY_COST|VALID_FROM|VALID_TO|COST_TYPE|MODU_CODE|HOU_CODE|BAS_CODE|ADIT_CODE
43.1||0|||MOCO|AD016S|||
43.1||0|||MOCO|AD016SW|||
67.65||0|||MOCO|AD025S|||
67.65||0|||MOCO|AD025SW|||
86.32||0|||MOCO|AD040S|||
370.57||0|||MOCO|AD065S|||
419.27||0|||MOCO|AD100S|||
501.35||0|||MOCO|AD160S|||
207.94||25|||MOCO|ARCMVV0025A|||
207.94||25|||MOCO|ARCMVV0025AW|||
275.43||25|||MOCO|ARCMVV0040AW|||
275.43||25|||MOCO|ARCMVV0040A|||
629.9||55|||MOCO|ARCMHH0065A|||
629.9||55|||MOCO|ARCMVV0065A|||
629.9||55|||MOCO|ARCMVH0065A|||
629.9||55|||MOCO|ARCMHV0065A|||
629.9||55|||MOCO|ARCMHH0100A|||
629.9||55|||MOCO|ARCMVV0100A|||
629.9||55|||MOCO|ARCMVH0100A|||
629.9||55|||MOCO|ARCMHV0100A|||
868.74||55|||MOCO|ARCMVV0160A|||
868.74||55|||MOCO|ARCMHH0160A|||
868.74||55|||MOCO|ARCMVH0160A|||
868.74||55|||MOCO|ARCMHV0160A|||
868.74||55|||MOCO|ARCMVV0200A|||
868.74||55|||MOCO|ARCMHH0200A|||
868.74||55|||MOCO|ARCMVH0200A|||
868.74||55|||MOCO|ARCMHV0200A|||
868.74||55|||MOCO|ARCMVV0250A|||
868.74||55|||MOCO|ARCMHH0250A|||
868.74||55|||MOCO|ARCMVH0250A|||
868.74||55|||MOCO|ARCMHV0250A|||
1707.52||55|||MOCO|ARVV0250AP|||
1707.52||55|||MOCO|ARHH0250AP|||
1707.52||55|||MOCO|ARVH0250AP|||
1707.52||55|||MOCO|ARHV0250AP|||
1120.79||55|||MOCO|ARVV0300A|||
1120.79||55|||MOCO|ARHH0300A|||
1120.79||55|||MOCO|ARVH0300A|||
1120.79||55|||MOCO|ARHV0300A|||
2589.43||90|||MOCO|ARVV0300AP|||
2589.43||90|||MOCO|ARHH0300AP|||
2589.43||90|||MOCO|ARVH0300AP|||
2589.43||90|||MOCO|ARHV0300AP|||
1512.26||55|||MOCO|ARVV0400A|||
1512.26||55|||MOCO|ARHH0400A|||
1512.26||55|||MOCO|ARVH0400A|||
1512.26||55|||MOCO|ARHV0400A|||
1738.05||90|||MOCO|ARVV0650A|||
1738.05||90|||MOCO|ARHH0650A|||
1738.05||90|||MOCO|ARVH0650A|||
1738.05||90|||MOCO|ARHV0650A|||
3848.8||500|||MOCO|ARVV0650AP|||
3848.8||500|||MOCO|ARHH0650AP|||
3848.8||500|||MOCO|ARVH0650AP|||
3848.8||500|||MOCO|ARHV0650AP|||
1759.89||90|||MOCO|ARVV1000A|||
1759.89||90|||MOCO|ARHH1000A|||
1759.89||90|||MOCO|ARVH1000A|||
1759.89||90|||MOCO|ARHV1000A|||
4357.59||500|||MOCO|ARVV1000AP|||
4357.59||500|||MOCO|ARHH1000AP|||
4357.59||500|||MOCO|ARVH1000AP|||
4357.59||500|||MOCO|ARHV1000AP|||
323.14||84|||MOCO|ASD016A|||
376.64||84|||MOCO|ASD025A|||
531.62||84|||MOCO|ASD040A|||
1009.01||84|||MOCO|ASD065A|||
1437.89||84|||MOCO|ASD100A|||
1459.65||84|||MOCO|ASD160A|||
508.25||84|||MOCO|ASR0025A|||
519.16||84|||MOCO|ASR0040A|||
1455.88||84|||MOCO|ASR0100A|||
1631.75||84|||MOCO|ASR0160A|||
1872.86||84|||MOCO|ASR0200A|||
2722.36||84|||MOCO|ASR0250A|||
2958.96||84|||MOCO|ASR0300A|||
3291.32||84|||MOCO|ASR0400A|||
3504.74||500|||MOCO|ASR0650A|||
4111.42||500|||MOCO|ASR1000A|||
938.47||70|||MOCO|ASR0025D|||
938.47||70|||MOCO|ASR0040D|||
938.47||70|||MOCO|ASR0065D|||
2383.9||70|||MOCO|ASR0100D|||
2498.4||70|||MOCO|ASR0160D|||
2800||90|||MOCO|ASR0250D|||
2949.7||90|||MOCO|ASR0310D|||
3170.8||150|||MOCO|ASR0450D|||
3170.8||150|||MOCO|ASR0450DP|||
4753.7||190|||MOCO|ASR0650D|||
6263.9||190|||MOCO|ASR1075D|||
7463.9||250|||MOCO|ASR1600D|||
11450.4||450|||MOCO|ASR2885D|||
|||||AICO||||AMR
|||||AICO||||EMS
|||||AICO||||LIFTING GEAR
|||||AICO||||PURGING
0|||||BACO|||0|
0|||||BACO|||CustomB|
625|||||BACO|||RA0025LPB|
625|||||BACO|||RA0025MPB|
625|||||BACO|||RA0040LPB|
625|||||BACO|||RA0040MPB|
1025|||||BACO|||RA0065LPB|
1025|||||BACO|||RA0100LPB|
625|||||BACO|||RA0100MPB|
1025|||||BACO|||RA0160LPB|
625|||||BACO|||RA0160MPB|
1025|||||BACO|||RA0200LPB|
625|||||BACO|||RA0200MPB|
1025|||||BACO|||RA0250+LPB|
1025|||||BACO|||RA0250LPB|
1025|||||BACO|||RA0250MPB|
1275|||||BACO|||RA0300+LPB|
1025|||||BACO|||RA0300LPB|
1025|||||BACO|||RA0300MPB|
1275|||||BACO|||RA0400LPB|
1025|||||BACO|||RA0400MPB|
1425|||||BACO|||RA0650+LPB|
1275|||||BACO|||RA0650LPB|
1275|||||BACO|||RA0650MPB|
1425|||||BACO|||RA1000+LPB|
1275|||||BACO|||RA1000LPB|
1275|||||BACO|||RA1000MPB|
625|||||BACO|||RD0025MPB|
625|||||BACO|||RD0040MPB|
625|||||BACO|||RD0065MPB|
625|||||BACO|||RD0100MPB|
0|||||BACO|||RD0160MPB|
1025|||||BACO|||RD0250MPB|
1025|||||BACO|||RD0310MPB|
1025|||||BACO|||RD0450+MPB|
1025|||||BACO|||RD0450MPB|
1275|||||BACO|||RD0650MPB|
1275|||||BACO|||RD1075MPB|
1275|||||BACO|||RD1600MPB|
0|||||BACO|||RD2885MPB|
625|||||BACO|||U016LPB|
625|||||BACO|||U016MPB|
625|||||BACO|||U025LPB|
625|||||BACO|||U025MPB|
625|||||BACO|||U040LPB|
625|||||BACO|||U040MPB|
625|||||BACO|||U065LPB|
1025|||||BACO|||U065MPB|
1025|||||BACO|||U100LPB|
1025|||||BACO|||U100MPB|
1025|||||BACO|||U160LPB|
1025|||||BACO|||U160MPB|
199.5|185|14.5|||HOCO||GC2||
244.5|220|15.5|||HOCO||GC2FS||
251.75|235|14.5|||HOCO||GC2MP||
301.36|270|14.5|||HOCO||GC3||
316.5|295|21.5|||HOCO||GC4||
532|495|37|||HOCO||GC4+||
627|585|42|||HOCO||GC5||
713.46|665|58|||HOCO||GC6||
903|830|73|||HOCO||GC7||
1040.5|965|75.5|||HOCO||GC7+||
2185|1990|195|||HOCO||GC8||
244.5|254|0|||HOCO||Gas Cab No 2 (Multi)||
301.36|299|0|||HOCO||Gas Cab No 4||
713.46|699|0|||HOCO||Gas Cab No 6||
0|2760|0|||HOCO||Custom1||
0|3071|0|||HOCO||Custom2||
0|3191|0|||HOCO||Custom3||
0|2959|0|||HOCO||Custom4||
0|3268|0|||HOCO||Custom5||
0|3850|0|||HOCO||Custom6||
0|0|0|||HOCO||CustomK||
2519|2519|0|||HOCO||KP1||
2725|2725|0|||HOCO||KP2||
2879|2879|0|||HOCO||KP3||
3416|3416|0|||HOCO||KP4||
3503|3503|0|||HOCO||KP5||
188.91|254|0|||HOCO||Gas Cab No 2BB||
301.36|299|0|||HOCO||Gas Cab No 4BB25||
310.99|299|0|||HOCO||Gas Cab No 4BB40||
713.46|699|0|||HOCO||Gas Cab No 6BB||
188.91|220|15.5|||HOCO||GC2FSBB||
301.36|270|14.5|||HOCO||GC3BB||
301.36|295|21.5|||HOCO||GC4BB25||
310.99|295|21.5|||HOCO||GC4BB40||
689.19|585|42|||HOCO||GC5BB||
713.46|665|58|||HOCO||GC6BB||
188.91|185|14.5|||HOCO||GC2BB||
251.75|254|0|||HOCO||Gas Cab No 2MP||
,,,,,,,,,
"SELLING_PRICE","COST_PRICE","DELIVERY_COST","VALID_FROM","VALID_TO","COST_TYPE","MODU_CODE","HOU_CODE","BAS_CODE","ADIT_CODE"
43.1,,0,,,"MOCO","AD016S",,,
43.1,,0,,,"MOCO","AD016SW",,,
67.65,,0,,,"MOCO","AD025S",,,
67.65,,0,,,"MOCO","AD025SW",,,
86.32,,0,,,"MOCO","AD040S",,,
370.57,,0,,,"MOCO","AD065S",,,
419.27,,0,,,"MOCO","AD100S",,,
501.35,,0,,,"MOCO","AD160S",,,
207.94,,25,,,"MOCO","ARCMVV0025A",,,
207.94,,25,,,"MOCO","ARCMVV0025AW",,,
275.43,,25,,,"MOCO","ARCMVV0040AW",,,
275.43,,25,,,"MOCO","ARCMVV0040A",,,
629.9,,55,,,"MOCO","ARCMHH0065A",,,
629.9,,55,,,"MOCO","ARCMVV0065A",,,
629.9,,55,,,"MOCO","ARCMVH0065A",,,
629.9,,55,,,"MOCO","ARCMHV0065A",,,
629.9,,55,,,"MOCO","ARCMHH0100A",,,
629.9,,55,,,"MOCO","ARCMVV0100A",,,
629.9,,55,,,"MOCO","ARCMVH0100A",,,
629.9,,55,,,"MOCO","ARCMHV0100A",,,
868.74,,55,,,"MOCO","ARCMVV0160A",,,
868.74,,55,,,"MOCO","ARCMHH0160A",,,
868.74,,55,,,"MOCO","ARCMVH0160A",,,
868.74,,55,,,"MOCO","ARCMHV0160A",,,
868.74,,55,,,"MOCO","ARCMVV0200A",,,
868.74,,55,,,"MOCO","ARCMHH0200A",,,
868.74,,55,,,"MOCO","ARCMVH0200A",,,
868.74,,55,,,"MOCO","ARCMHV0200A",,,
868.74,,55,,,"MOCO","ARCMVV0250A",,,
868.74,,55,,,"MOCO","ARCMHH0250A",,,
868.74,,55,,,"MOCO","ARCMVH0250A",,,
868.74,,55,,,"MOCO","ARCMHV0250A",,,
1707.52,,55,,,"MOCO","ARVV0250AP",,,
1707.52,,55,,,"MOCO","ARHH0250AP",,,
1707.52,,55,,,"MOCO","ARVH0250AP",,,
1707.52,,55,,,"MOCO","ARHV0250AP",,,
1120.79,,55,,,"MOCO","ARVV0300A",,,
1120.79,,55,,,"MOCO","ARHH0300A",,,
1120.79,,55,,,"MOCO","ARVH0300A",,,
1120.79,,55,,,"MOCO","ARHV0300A",,,
2589.43,,90,,,"MOCO","ARVV0300AP",,,
2589.43,,90,,,"MOCO","ARHH0300AP",,,
2589.43,,90,,,"MOCO","ARVH0300AP",,,
2589.43,,90,,,"MOCO","ARHV0300AP",,,
1512.26,,55,,,"MOCO","ARVV0400A",,,
1512.26,,55,,,"MOCO","ARHH0400A",,,
1512.26,,55,,,"MOCO","ARVH0400A",,,
1512.26,,55,,,"MOCO","ARHV0400A",,,
1738.05,,90,,,"MOCO","ARVV0650A",,,
1738.05,,90,,,"MOCO","ARHH0650A",,,
1738.05,,90,,,"MOCO","ARVH0650A",,,
1738.05,,90,,,"MOCO","ARHV0650A",,,
3848.8,,500,,,"MOCO","ARVV0650AP",,,
3848.8,,500,,,"MOCO","ARHH0650AP",,,
3848.8,,500,,,"MOCO","ARVH0650AP",,,
3848.8,,500,,,"MOCO","ARHV0650AP",,,
1759.89,,90,,,"MOCO","ARVV1000A",,,
1759.89,,90,,,"MOCO","ARHH1000A",,,
1759.89,,90,,,"MOCO","ARVH1000A",,,
1759.89,,90,,,"MOCO","ARHV1000A",,,
4357.59,,500,,,"MOCO","ARVV1000AP",,,
4357.59,,500,,,"MOCO","ARHH1000AP",,,
4357.59,,500,,,"MOCO","ARVH1000AP",,,
4357.59,,500,,,"MOCO","ARHV1000AP",,,
323.14,,84,,,"MOCO","ASD016A",,,
376.64,,84,,,"MOCO","ASD025A",,,
531.62,,84,,,"MOCO","ASD040A",,,
1009.01,,84,,,"MOCO","ASD065A",,,
1437.89,,84,,,"MOCO","ASD100A",,,
1459.65,,84,,,"MOCO","ASD160A",,,
508.25,,84,,,"MOCO","ASR0025A",,,
519.16,,84,,,"MOCO","ASR0040A",,,
1455.88,,84,,,"MOCO","ASR0100A",,,
1631.75,,84,,,"MOCO","ASR0160A",,,
1872.86,,84,,,"MOCO","ASR0200A",,,
2722.36,,84,,,"MOCO","ASR0250A",,,
2958.96,,84,,,"MOCO","ASR0300A",,,
3291.32,,84,,,"MOCO","ASR0400A",,,
3504.74,,500,,,"MOCO","ASR0650A",,,
4111.42,,500,,,"MOCO","ASR1000A",,,
938.47,,70,,,"MOCO","ASR0025D",,,
938.47,,70,,,"MOCO","ASR0040D",,,
938.47,,70,,,"MOCO","ASR0065D",,,
2383.9,,70,,,"MOCO","ASR0100D",,,
2498.4,,70,,,"MOCO","ASR0160D",,,
2800,,90,,,"MOCO","ASR0250D",,,
2949.7,,90,,,"MOCO","ASR0310D",,,
3170.8,,150,,,"MOCO","ASR0450D",,,
3170.8,,150,,,"MOCO","ASR0450DP",,,
4753.7,,190,,,"MOCO","ASR0650D",,,
6263.9,,190,,,"MOCO","ASR1075D",,,
7463.9,,250,,,"MOCO","ASR1600D",,,
11450.4,,450,,,"MOCO","ASR2885D",,,
,,,,,"AICO",,,,"AMR"
,,,,,"AICO",,,,"EMS"
,,,,,"AICO",,,,"LIFTING GEAR"
,,,,,"AICO",,,,"PURGING"
0,,,,,"BACO",,,"0",
0,,,,,"BACO",,,"CustomB",
625,,,,,"BACO",,,"RA0025LPB",
625,,,,,"BACO",,,"RA0025MPB",
625,,,,,"BACO",,,"RA0040LPB",
625,,,,,"BACO",,,"RA0040MPB",
1025,,,,,"BACO",,,"RA0065LPB",
1025,,,,,"BACO",,,"RA0100LPB",
625,,,,,"BACO",,,"RA0100MPB",
1025,,,,,"BACO",,,"RA0160LPB",
625,,,,,"BACO",,,"RA0160MPB",
1025,,,,,"BACO",,,"RA0200LPB",
625,,,,,"BACO",,,"RA0200MPB",
1025,,,,,"BACO",,,"RA0250+LPB",
1025,,,,,"BACO",,,"RA0250LPB",
1025,,,,,"BACO",,,"RA0250MPB",
1275,,,,,"BACO",,,"RA0300+LPB",
1025,,,,,"BACO",,,"RA0300LPB",
1025,,,,,"BACO",,,"RA0300MPB",
1275,,,,,"BACO",,,"RA0400LPB",
1025,,,,,"BACO",,,"RA0400MPB",
1425,,,,,"BACO",,,"RA0650+LPB",
1275,,,,,"BACO",,,"RA0650LPB",
1275,,,,,"BACO",,,"RA0650MPB",
1425,,,,,"BACO",,,"RA1000+LPB",
1275,,,,,"BACO",,,"RA1000LPB",
1275,,,,,"BACO",,,"RA1000MPB",
625,,,,,"BACO",,,"RD0025MPB",
625,,,,,"BACO",,,"RD0040MPB",
625,,,,,"BACO",,,"RD0065MPB",
625,,,,,"BACO",,,"RD0100MPB",
0,,,,,"BACO",,,"RD0160MPB",
1025,,,,,"BACO",,,"RD0250MPB",
1025,,,,,"BACO",,,"RD0310MPB",
1025,,,,,"BACO",,,"RD0450+MPB",
1025,,,,,"BACO",,,"RD0450MPB",
1275,,,,,"BACO",,,"RD0650MPB",
1275,,,,,"BACO",,,"RD1075MPB",
1275,,,,,"BACO",,,"RD1600MPB",
0,,,,,"BACO",,,"RD2885MPB",
625,,,,,"BACO",,,"U016LPB",
625,,,,,"BACO",,,"U016MPB",
625,,,,,"BACO",,,"U025LPB",
625,,,,,"BACO",,,"U025MPB",
625,,,,,"BACO",,,"U040LPB",
625,,,,,"BACO",,,"U040MPB",
625,,,,,"BACO",,,"U065LPB",
1025,,,,,"BACO",,,"U065MPB",
1025,,,,,"BACO",,,"U100LPB",
1025,,,,,"BACO",,,"U100MPB",
1025,,,,,"BACO",,,"U160LPB",
1025,,,,,"BACO",,,"U160MPB",
199.5,185,14.5,,,"HOCO",,"GC2",,
244.5,220,15.5,,,"HOCO",,"GC2FS",,
251.75,235,14.5,,,"HOCO",,"GC2MP",,
301.36,270,14.5,,,"HOCO",,"GC3",,
316.5,295,21.5,,,"HOCO",,"GC4",,
532,495,37,,,"HOCO",,"GC4+",,
627,585,42,,,"HOCO",,"GC5",,
713.46,665,58,,,"HOCO",,"GC6",,
903,830,73,,,"HOCO",,"GC7",,
1040.5,965,75.5,,,"HOCO",,"GC7+",,
2185,1990,195,,,"HOCO",,"GC8",,
244.5,254,0,,,"HOCO",,"Gas Cab No 2 (Multi)",,
301.36,299,0,,,"HOCO",,"Gas Cab No 4",,
713.46,699,0,,,"HOCO",,"Gas Cab No 6",,
0,2760,0,,,"HOCO",,"Custom1",,
0,3071,0,,,"HOCO",,"Custom2",,
0,3191,0,,,"HOCO",,"Custom3",,
0,2959,0,,,"HOCO",,"Custom4",,
0,3268,0,,,"HOCO",,"Custom5",,
0,3850,0,,,"HOCO",,"Custom6",,
0,0,0,,,"HOCO",,"CustomK",,
2519,2519,0,,,"HOCO",,"KP1",,
2725,2725,0,,,"HOCO",,"KP2",,
2879,2879,0,,,"HOCO",,"KP3",,
3416,3416,0,,,"HOCO",,"KP4",,
3503,3503,0,,,"HOCO",,"KP5",,
188.91,254,0,,,"HOCO",,"Gas Cab No 2BB",,
301.36,299,0,,,"HOCO",,"Gas Cab No 4BB25",,
310.99,299,0,,,"HOCO",,"Gas Cab No 4BB40",,
713.46,699,0,,,"HOCO",,"Gas Cab No 6BB",,
188.91,220,15.5,,,"HOCO",,"GC2FSBB",,
301.36,270,14.5,,,"HOCO",,"GC3BB",,
301.36,295,21.5,,,"HOCO",,"GC4BB25",,
310.99,295,21.5,,,"HOCO",,"GC4BB40",,
689.19,585,42,,,"HOCO",,"GC5BB",,
713.46,665,58,,,"HOCO",,"GC6BB",,
188.91,185,14.5,,,"HOCO",,"GC2BB",,
251.75,254,0,,,"HOCO",,"Gas Cab No 2MP",,
1
2 SELLING_PRICE COST_PRICE DELIVERY_COST VALID_FROM VALID_TO COST_TYPE MODU_CODE HOU_CODE BAS_CODE ADIT_CODE
3 43.1 0 MOCO AD016S
4 43.1 0 MOCO AD016SW
5 67.65 0 MOCO AD025S
6 67.65 0 MOCO AD025SW
7 86.32 0 MOCO AD040S
8 370.57 0 MOCO AD065S
9 419.27 0 MOCO AD100S
10 501.35 0 MOCO AD160S
11 207.94 25 MOCO ARCMVV0025A
12 207.94 25 MOCO ARCMVV0025AW
13 275.43 25 MOCO ARCMVV0040AW
14 275.43 25 MOCO ARCMVV0040A
15 629.9 55 MOCO ARCMHH0065A
16 629.9 55 MOCO ARCMVV0065A
17 629.9 55 MOCO ARCMVH0065A
18 629.9 55 MOCO ARCMHV0065A
19 629.9 55 MOCO ARCMHH0100A
20 629.9 55 MOCO ARCMVV0100A
21 629.9 55 MOCO ARCMVH0100A
22 629.9 55 MOCO ARCMHV0100A
23 868.74 55 MOCO ARCMVV0160A
24 868.74 55 MOCO ARCMHH0160A
25 868.74 55 MOCO ARCMVH0160A
26 868.74 55 MOCO ARCMHV0160A
27 868.74 55 MOCO ARCMVV0200A
28 868.74 55 MOCO ARCMHH0200A
29 868.74 55 MOCO ARCMVH0200A
30 868.74 55 MOCO ARCMHV0200A
31 868.74 55 MOCO ARCMVV0250A
32 868.74 55 MOCO ARCMHH0250A
33 868.74 55 MOCO ARCMVH0250A
34 868.74 55 MOCO ARCMHV0250A
35 1707.52 55 MOCO ARVV0250AP
36 1707.52 55 MOCO ARHH0250AP
37 1707.52 55 MOCO ARVH0250AP
38 1707.52 55 MOCO ARHV0250AP
39 1120.79 55 MOCO ARVV0300A
40 1120.79 55 MOCO ARHH0300A
41 1120.79 55 MOCO ARVH0300A
42 1120.79 55 MOCO ARHV0300A
43 2589.43 90 MOCO ARVV0300AP
44 2589.43 90 MOCO ARHH0300AP
45 2589.43 90 MOCO ARVH0300AP
46 2589.43 90 MOCO ARHV0300AP
47 1512.26 55 MOCO ARVV0400A
48 1512.26 55 MOCO ARHH0400A
49 1512.26 55 MOCO ARVH0400A
50 1512.26 55 MOCO ARHV0400A
51 1738.05 90 MOCO ARVV0650A
52 1738.05 90 MOCO ARHH0650A
53 1738.05 90 MOCO ARVH0650A
54 1738.05 90 MOCO ARHV0650A
55 3848.8 500 MOCO ARVV0650AP
56 3848.8 500 MOCO ARHH0650AP
57 3848.8 500 MOCO ARVH0650AP
58 3848.8 500 MOCO ARHV0650AP
59 1759.89 90 MOCO ARVV1000A
60 1759.89 90 MOCO ARHH1000A
61 1759.89 90 MOCO ARVH1000A
62 1759.89 90 MOCO ARHV1000A
63 4357.59 500 MOCO ARVV1000AP
64 4357.59 500 MOCO ARHH1000AP
65 4357.59 500 MOCO ARVH1000AP
66 4357.59 500 MOCO ARHV1000AP
67 323.14 84 MOCO ASD016A
68 376.64 84 MOCO ASD025A
69 531.62 84 MOCO ASD040A
70 1009.01 84 MOCO ASD065A
71 1437.89 84 MOCO ASD100A
72 1459.65 84 MOCO ASD160A
73 508.25 84 MOCO ASR0025A
74 519.16 84 MOCO ASR0040A
75 1455.88 84 MOCO ASR0100A
76 1631.75 84 MOCO ASR0160A
77 1872.86 84 MOCO ASR0200A
78 2722.36 84 MOCO ASR0250A
79 2958.96 84 MOCO ASR0300A
80 3291.32 84 MOCO ASR0400A
81 3504.74 500 MOCO ASR0650A
82 4111.42 500 MOCO ASR1000A
83 938.47 70 MOCO ASR0025D
84 938.47 70 MOCO ASR0040D
85 938.47 70 MOCO ASR0065D
86 2383.9 70 MOCO ASR0100D
87 2498.4 70 MOCO ASR0160D
88 2800 90 MOCO ASR0250D
89 2949.7 90 MOCO ASR0310D
90 3170.8 150 MOCO ASR0450D
91 3170.8 150 MOCO ASR0450DP
92 4753.7 190 MOCO ASR0650D
93 6263.9 190 MOCO ASR1075D
94 7463.9 250 MOCO ASR1600D
95 11450.4 450 MOCO ASR2885D
96 AICO AMR
97 AICO EMS
98 AICO LIFTING GEAR
99 AICO PURGING
100 0 BACO 0
101 0 BACO CustomB
102 625 BACO RA0025LPB
103 625 BACO RA0025MPB
104 625 BACO RA0040LPB
105 625 BACO RA0040MPB
106 1025 BACO RA0065LPB
107 1025 BACO RA0100LPB
108 625 BACO RA0100MPB
109 1025 BACO RA0160LPB
110 625 BACO RA0160MPB
111 1025 BACO RA0200LPB
112 625 BACO RA0200MPB
113 1025 BACO RA0250+LPB
114 1025 BACO RA0250LPB
115 1025 BACO RA0250MPB
116 1275 BACO RA0300+LPB
117 1025 BACO RA0300LPB
118 1025 BACO RA0300MPB
119 1275 BACO RA0400LPB
120 1025 BACO RA0400MPB
121 1425 BACO RA0650+LPB
122 1275 BACO RA0650LPB
123 1275 BACO RA0650MPB
124 1425 BACO RA1000+LPB
125 1275 BACO RA1000LPB
126 1275 BACO RA1000MPB
127 625 BACO RD0025MPB
128 625 BACO RD0040MPB
129 625 BACO RD0065MPB
130 625 BACO RD0100MPB
131 0 BACO RD0160MPB
132 1025 BACO RD0250MPB
133 1025 BACO RD0310MPB
134 1025 BACO RD0450+MPB
135 1025 BACO RD0450MPB
136 1275 BACO RD0650MPB
137 1275 BACO RD1075MPB
138 1275 BACO RD1600MPB
139 0 BACO RD2885MPB
140 625 BACO U016LPB
141 625 BACO U016MPB
142 625 BACO U025LPB
143 625 BACO U025MPB
144 625 BACO U040LPB
145 625 BACO U040MPB
146 625 BACO U065LPB
147 1025 BACO U065MPB
148 1025 BACO U100LPB
149 1025 BACO U100MPB
150 1025 BACO U160LPB
151 1025 BACO U160MPB
152 199.5 185 14.5 HOCO GC2
153 244.5 220 15.5 HOCO GC2FS
154 251.75 235 14.5 HOCO GC2MP
155 301.36 270 14.5 HOCO GC3
156 316.5 295 21.5 HOCO GC4
157 532 495 37 HOCO GC4+
158 627 585 42 HOCO GC5
159 713.46 665 58 HOCO GC6
160 903 830 73 HOCO GC7
161 1040.5 965 75.5 HOCO GC7+
162 2185 1990 195 HOCO GC8
163 244.5 254 0 HOCO Gas Cab No 2 (Multi)
164 301.36 299 0 HOCO Gas Cab No 4
165 713.46 699 0 HOCO Gas Cab No 6
166 0 2760 0 HOCO Custom1
167 0 3071 0 HOCO Custom2
168 0 3191 0 HOCO Custom3
169 0 2959 0 HOCO Custom4
170 0 3268 0 HOCO Custom5
171 0 3850 0 HOCO Custom6
172 0 0 0 HOCO CustomK
173 2519 2519 0 HOCO KP1
174 2725 2725 0 HOCO KP2
175 2879 2879 0 HOCO KP3
176 3416 3416 0 HOCO KP4
177 3503 3503 0 HOCO KP5
178 188.91 254 0 HOCO Gas Cab No 2BB
179 301.36 299 0 HOCO Gas Cab No 4BB25
180 310.99 299 0 HOCO Gas Cab No 4BB40
181 713.46 699 0 HOCO Gas Cab No 6BB
182 188.91 220 15.5 HOCO GC2FSBB
183 301.36 270 14.5 HOCO GC3BB
184 301.36 295 21.5 HOCO GC4BB25
185 310.99 295 21.5 HOCO GC4BB40
186 689.19 585 42 HOCO GC5BB
187 713.46 665 58 HOCO GC6BB
188 188.91 185 14.5 HOCO GC2BB
189 251.75 254 0 HOCO Gas Cab No 2MP

View File

@@ -1,34 +1,30 @@
"CODE","DRWG_CODE","METY_CODE","MANU_REF","DIM_A","DIM_B","CENTRES","DIM_C","WEIGHT","QMAX","VALID_FROM","VALID_TO","QNOM","QMIN"
"MRA25A",,"ROTARY","ACTARIS",121,96,0,159,2.7,25,,,25,1.3
"MRA40A",,"ROTARY","ACTARIS",121,96,0,189,3.4,40,,,40,2
"MRA65B",,"ROTARY","ACTARIS",171,96,0,307,3.4,65,,,65,2
"MRA100B",,"ROTARY","ACTARIS",171,182,0,307,11,100,,,92.53,5
"MRA160C",,"ROTARY","ACTARIS",171,182,0,382,15,160,,,160,8
"MRA200C",,"ROTARY","ACTARIS",171,182,0,428,17,200,,,187.79,10
"MRA250C",,"ROTARY","ACTARIS",241,235,0,409,29,250,,,201.91,12.5
"MRA300D",,"ROTARY","ACTARIS",241,235,0,479,34,300,,,264.69,15
"MRA400D",,"ROTARY","ACTARIS",241,235,0,615,43,400,,,329.15,20
"MRA650E",,"ROTARY","ACTARIS",450,308,0,665,104,650,,,534.87,32.5
"MRA1000E",,"ROTARY","ACTARIS",500,400,0,820,197,1000,,,666.4,50
"MRD0025B4B",,"ROTARY","DRESSER",171,152,0,316,8,25,,,25,1.25
"MRD0040B4B",,"ROTARY","DRESSER",171,152,0,353,10,40,,,40,2
"MRD0065B4B",,"ROTARY","DRESSER",171,177,0,357,12,65,,,57,3.25
"MRD0100B4B",,"ROTARY","DRESSER",171,177,0,388,14,100,,,81,5
"MRD0160B4C",,"ROTARY","DRESSER",171,177,0,460,17,160,,,130,8
"MRD0250B4D",,"ROTARY","DRESSER",241,226,0,485,28,250,,,230,12.5
"MRD0310B4D",,"ROTARY","DRESSER",241,226,0,502,29,310,,,285,15.5
"MRD0450B4D",,"ROTARY","DRESSER",241,226,0,620,38,450,,,362,22.5
"MRD0650B4E",,"ROTARY","DRESSER",406,457,0,684,94,650,,,547,32.5
"MRD1075B4E",,"ROTARY","DRESSER",533,457,0,822,116,1075,,,710,54
"MRD2885A",,"ROTARY","DRESSER",711,754,0,1295,1055,2885,,,2137,144
"MDA16",,"DIAPHRAGM","ACTARIS",0,0,0,0,0,16,,,16,0.8
"MDA25",,"DIAPHRAGM","ACTARIS",0,0,0,0,0,25,,,25,1.25
"MDA40",,"DIAPHRAGM","ACTARIS",0,0,0,0,0,40,,,40,2
"MDA65",,"DIAPHRAGM","ACTARIS",0,0,0,0,0,65,,,65,3.25
"MDA100",,"DIAPHRAGM","ACTARIS",0,0,0,0,0,100,,,99,5
"MDA160",,"DIAPHRAGM","ACTARIS",0,0,0,0,0,160,,,136,8
"MRD1600B4F",,"ROTARY","DRESSER",533,457,0,922,284,1600,,,1181,80
"MRA1000SE",,"ROTARY","ACTARIS",0,0,0,0,0,1000,,,517,50
"MRA1000+",,"ROTARY","ACTARIS",0,0,0,0,0,1000,,,663,50
"MRA650SE",,"ROTARY","ACTARIS",0,0,0,0,0,650,,,450,23.5
"MRD2885A10",,"ROTARY","DRESSER",0,0,0,0,0,2885,,,2137,144
CODE,DRWG_CODE,METY_CODE,MANU_REF,DIM_A,DIM_B,CENTRES,DIM_C,WEIGHT,QMAX,VALID_FROM,VALID_TO,QNOM,QMIN
MRA25A,,ROTARY,Actaris,121,96,0,159,2.7,25,,,25,1.3
MRA40A,,ROTARY,Actaris,121,96,0,189,3.4,40,,,40,2
MRA65B,,ROTARY,Actaris,171,96,0,307,3.4,65,,,65,2
MRA100B,,ROTARY,Actaris,171,182,0,307,11,100,,,92.53,5
MRA160C,,ROTARY,Actaris,171,182,0,382,15,160,,,160,8
MRA200C,,ROTARY,Actaris,171,182,0,428,17,200,,,187.79,10
MRA250C,,ROTARY,Actaris,241,235,0,409,29,250,,,201.91,12.5
MRA300D,,ROTARY,Actaris,241,235,0,479,34,300,,,264.69,15
MRA400D,,ROTARY,Actaris,241,235,0,615,43,400,,,329.15,20
MRA650E,,ROTARY,Actaris,450,308,0,665,104,650,,,534.87,32.5
MRA1000E,,ROTARY,Actaris,500,400,0,820,197,1000,,,666.4,50
MRD0025B4B,,ROTARY,Dresser,171,152,0,316,8,25,,,25,1.25
MRD0040B4B,,ROTARY,Dresser,171,152,0,353,10,40,,,40,2
MRD0065B4B,,ROTARY,Dresser,171,177,0,357,12,65,,,57,3.25
MRD0100B4B,,ROTARY,Dresser,171,177,0,388,14,100,,,81,5
MRD0160B4C,,ROTARY,Dresser,171,177,0,460,17,160,,,130,8
MRD0250B4D,,ROTARY,Dresser,241,226,0,485,28,250,,,230,12.5
MRD0310B4D,,ROTARY,Dresser,241,226,0,502,29,310,,,285,15.5
MRD0450B4D,,ROTARY,Dresser,241,226,0,620,38,450,,,362,22.5
MRD0650B4E,,ROTARY,Dresser,406,457,0,684,94,650,,,547,32.5
MRD1075B4E,,ROTARY,Dresser,533,457,0,822,116,1075,,,710,54
MRD2885A,,ROTARY,Dresser,711,754,0,1295,1055,2885,,,2137,144
MDA16,,Diaphragm,Actaris,0,0,0,0,0,16,,,16,0.8
MDA25,,Diaphragm,Actaris,0,0,0,0,0,25,,,25,1.25
MDA40,,Diaphragm,Actaris,0,0,0,0,0,40,,,40,2
MDA65,,Diaphragm,Actaris,0,0,0,0,0,65,,,65,3.25
MDA100,,Diaphragm,Actaris,0,0,0,0,0,100,,,99,5
MDA160,,Diaphragm,Actaris,0,0,0,0,0,160,,,136,8
MRD1600B4F,,ROTARY,Dresser,533,457,0,922,284,1600,,,1181,80
1 CODE DRWG_CODE METY_CODE MANU_REF DIM_A DIM_B CENTRES DIM_C WEIGHT QMAX VALID_FROM VALID_TO QNOM QMIN
2 MRA25A ROTARY ACTARIS Actaris 121 96 0 159 2.7 25 25 1.3
3 MRA40A ROTARY ACTARIS Actaris 121 96 0 189 3.4 40 40 2
4 MRA65B ROTARY ACTARIS Actaris 171 96 0 307 3.4 65 65 2
5 MRA100B ROTARY ACTARIS Actaris 171 182 0 307 11 100 92.53 5
6 MRA160C ROTARY ACTARIS Actaris 171 182 0 382 15 160 160 8
7 MRA200C ROTARY ACTARIS Actaris 171 182 0 428 17 200 187.79 10
8 MRA250C ROTARY ACTARIS Actaris 241 235 0 409 29 250 201.91 12.5
9 MRA300D ROTARY ACTARIS Actaris 241 235 0 479 34 300 264.69 15
10 MRA400D ROTARY ACTARIS Actaris 241 235 0 615 43 400 329.15 20
11 MRA650E ROTARY ACTARIS Actaris 450 308 0 665 104 650 534.87 32.5
12 MRA1000E ROTARY ACTARIS Actaris 500 400 0 820 197 1000 666.4 50
13 MRD0025B4B ROTARY DRESSER Dresser 171 152 0 316 8 25 25 1.25
14 MRD0040B4B ROTARY DRESSER Dresser 171 152 0 353 10 40 40 2
15 MRD0065B4B ROTARY DRESSER Dresser 171 177 0 357 12 65 57 3.25
16 MRD0100B4B ROTARY DRESSER Dresser 171 177 0 388 14 100 81 5
17 MRD0160B4C ROTARY DRESSER Dresser 171 177 0 460 17 160 130 8
18 MRD0250B4D ROTARY DRESSER Dresser 241 226 0 485 28 250 230 12.5
19 MRD0310B4D ROTARY DRESSER Dresser 241 226 0 502 29 310 285 15.5
20 MRD0450B4D ROTARY DRESSER Dresser 241 226 0 620 38 450 362 22.5
21 MRD0650B4E ROTARY DRESSER Dresser 406 457 0 684 94 650 547 32.5
22 MRD1075B4E ROTARY DRESSER Dresser 533 457 0 822 116 1075 710 54
23 MRD2885A ROTARY DRESSER Dresser 711 754 0 1295 1055 2885 2137 144
24 MDA16 DIAPHRAGM Diaphragm ACTARIS Actaris 0 0 0 0 0 16 16 0.8
25 MDA25 DIAPHRAGM Diaphragm ACTARIS Actaris 0 0 0 0 0 25 25 1.25
26 MDA40 DIAPHRAGM Diaphragm ACTARIS Actaris 0 0 0 0 0 40 40 2
27 MDA65 DIAPHRAGM Diaphragm ACTARIS Actaris 0 0 0 0 0 65 65 3.25
28 MDA100 DIAPHRAGM Diaphragm ACTARIS Actaris 0 0 0 0 0 100 99 5
29 MDA160 DIAPHRAGM Diaphragm ACTARIS Actaris 0 0 0 0 0 160 136 8
30 MRD1600B4F ROTARY DRESSER Dresser 533 457 0 922 284 1600 1181 80
MRA1000SE ROTARY ACTARIS 0 0 0 0 0 1000 517 50
MRA1000+ ROTARY ACTARIS 0 0 0 0 0 1000 663 50
MRA650SE ROTARY ACTARIS 0 0 0 0 0 650 450 23.5
MRD2885A10 ROTARY DRESSER 0 0 0 0 0 2885 2137 144

File diff suppressed because it is too large Load Diff

View File

@@ -1,6 +1,7 @@
DECLARE
l_test_load BOOLEAN := upper('&&1') = 'TEST';
l_fat_load BOOLEAN := upper('&&1') = 'FAT';
l_uat_load BOOLEAN := upper('&&1') = 'UAT';
l_dev_load BOOLEAN := upper(nvl('&&1','DEV')) = 'DEV';
BEGIN
@@ -10,7 +11,9 @@ BEGIN
ELSIF l_fat_load THEN
mip_bulk_load.g_flow_id := 200;
ELSIF l_dev_load THEN
mip_bulk_load.g_flow_id := 200;
mip_bulk_load.g_flow_id := 155;
ELSIF l_uat_load THEN
mip_bulk_load.g_flow_id := 400;
END IF;
IF mip_bulk_load.g_flow_id IS NOT NULL THEN

View File

@@ -11,4 +11,11 @@ parameter
BEGINDATA
PASSWORD_EXPIRY_LIMIT|30|Password expiry limit in days.
USER_ACCOUNT_LOCK|60|Number of days of inactivity before account is locked.
EMAIL_ADDRESS_AUTOMATIC_QUOTE|Andrew.Hardy@AdvanticaGroup.com|
EMAIL_FROM_ADDRESS|Joanna.Kingdon@AdvanticaGroup.com|The From field used for emails sent from the sy
QUOTE_LAPSE_LIMIT|90|The number of days that a quote remains valid for before lapsing.
EMAIL_ADDRESS_MANUAL_QUOTE|Andrew.Hardy@AdvanticaGroup.com|
EMAIL_ADDRESS_SUPPORT|Andrew.Hardy@AdvanticaGroup.com|
AV_LOCATION|c:\Program Files\Norton AntiVirus\NAVW32.exe|Anti-virus checker installation
APEX_AUTHORIZATION_DEFAULT_MODE|PUBLIC|Default authorization for components
SYSTEM_NAME|WEBMIP - DEVELOPMENT|

View File

@@ -970,8 +970,8 @@ CREATE OR REPLACE PACKAGE BODY mip_bulk_load IS
pl('load_housings');
IF NOT file_available('COSTS.csv') THEN
pl('COSTS.csv file missing');
IF NOT file_available('HOUSINGS.csv') THEN
pl('HOUSINGS.csv file missing');
RETURN;
END IF;
@@ -1350,7 +1350,7 @@ CREATE OR REPLACE PACKAGE BODY mip_bulk_load IS
,'dd/mm/yyyy')
END AS valid_to
,upper(enty_code) AS enty_code
,upper(mesc_code) AS mesc_code
,upper(replace(mesc_code,'"','inch')) AS mesc_code
,upper(svcpt_code) AS svcpt_code
,upper(mety_code) AS mety_code
FROM ext_labour_costs